Delhi Development Authority-DDA has published Maintenance Of Complete Schemes Under Flyover Civil ( Fod-1 And 3 ) Elect . ( Eld-3 And 10 ) Horticulture . Running Operation And Maintenance Of 11 Kv/433V Substation , 1250 And 320 Kva Dg Set , Tunnel And High Mast Lighting , Dewatering Pump Se. Submission Date for this Tender is 30-06-2021. Diesel Generators Tenders in As Per Tender Document Delhi. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Jun-2021 | Corrigendum for rescheduling of Pre-bid meeting and bid submission end date | Date | 30-06-2021 |
Name of Work: : M/o complete schemes under flyover civil (FOD-1 & 3) Elect (ELD-3 & 10) Horticulture. Sub Head :: Running operation & maintenance of 11 KV/433V Sub station,1250/320 KVA DG Set, Tunnel/ High Mast Lighting, Dewatering pump sets and EI & fans of sub station and office building (F.O.D.-4) at Sarita Vihar underpass. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Running maintenance and operation i/c routine & preventive maintenance of all water pump sets installed at site by deploying 3 nos skilled & trained pump operators for 9 Months (1 no. in each shift for total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM) and 9 Nos skilled & trained pump oprators for 3 months ( 3 no. in each shift for total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM) . One no wireman having competency certificate at least Class 2 & trained in maintenance of pumping installations once in a week (general shift 9 AM to 5 PM) & One no fitter trained in maintenance of pumping installations once in a week (general shift 9 AM to 5 PM) as per additional conditions, special conditions & inventory attached as per Annexure-'C' etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance. \n\n | 1 | 12 | Month |
2 | 2 | Running maintenance and operation i/c routine & preventive maintenance of substation equipments and Diesel generating set by deploying 3 nos skilled & trained electricians ,1 no. in each shift (total 3 shifts i.e. 6 AM to 2 PM, 2 PM to 10 PM & 10 PM to 6 AM), one no Khallasi for once in a week (general shift 9 AM to 5 PM), one no foreman (Electrical /Mechanical) once in month ( i.e. one M/o substation in 1st month and M/o DG set in 2nd month and so on), (general shift 9 AM to 5 PM) as per additional conditions, special conditions & inventory attached as per Annexure-'C' etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance including periodical testing of transformer oil, dehydration (Once in a year) & testing / calibration once in year etc. For DG set;- Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance including servicing, topping up of mobile oil/ water etc.\n | 2 | 12 | Month |
3 | 3 | Running maintenance and operation including routine & preventive maintenance of high mast lighting and tunnel lighting system by deploying 1 nos wireman having at least competency certificate class 2 and trained in maintenance of high mast lighting once in a week (general shift 9 AM to 5 PM) and 1 no mechanic trained in maintenance of high mast lighting once in a week (general shift 9 AM to 5 PM )as per additional conditions, special conditions & inventory attached as per Annexure-'C' etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance.\n | 3 | 12 | Month |
4 | 4 | Running maintenance including routine / preventive maintenance of IEI and fans i/c repairing and supplying replacement of defective parts i.e copper ballast, lamps, T-5 rod etc of sub-station i/c UPS and office bulding of FOD-4 by deploying 1 nos wireman having atleast competancy certificate class 2 once in a week (general shift 9 AM to 5 PM) and 1 no Khallasi once in a week (general shift 9 AM to 5 PM ) as per additional conditions, special conditions & inventory attached as per Annexure-'C' & 'D' etc as required.\nNote: Daily, weekly, fortnightly, monthly & other periodical checks as per CPWD Schedule of maintenance shall be carried as routine / preventive maintenance. \n | 4 | 12 | Month |
5 | 5 | Comprehensive material for maintenace of following system as per detailed inventory attached, as per Annexure 'C', including repair / replacement of any part of parts to the original finish & performance required for fully functional system for original system requiremnet etc. as required. \nStorm and sewage water pumps | 5 | 12 | Month |
6 | 5.01 | Substation equipment | 6 | 12 | Month |
7 | 5.02 | High Mast Lighting | 7 | 12 | Month |
8 | 5.03 | Tunnel Lights | 8 | 12 | Month |
9 | 6 | Providing supervisor for (having minimum graduate qualified) daily monitoring & supervision and ensure logging of operation / maintenance staff, attending routine, preventive & breakdown maintenance. \nNote: The supervisor must be minimum graduate qualified.\n | 9 | 12 | Month |
10 | 7 | B' check Servicing of 1250 KVA capacity D.G. set (cummins make) including replacement of following material, connection, testing etc. as required. \nELEMENT LUB OIL FILTER | 10 | 4 | Each |
11 | 7.01 | KIT FUEL FILTER AND RING | 11 | 2 | Each |
12 | 7.02 | KIT SUPER BYP.FILTER ELEM | 12 | 2 | Each |
13 | 7.03 | "SEAL,O RING" | 13 | 2 | Each |
14 | 7.04 | INHIBITOR,CORROSION 10 LITERS | 14 | 1 | Each |
15 | 7.05 | STRIP TEST | 15 | 1 | Each |
16 | 7.06 | KIT AIR CLEANER ELEMENTS (K, QSK, V SERIES) | 16 | 2 | Each |
17 | 7.07 | VALVOLINE PREMIUM BLUE 7800 PLUS 1/210 LTR | 17 | 1 | Each |
18 | 8 | B' check Servicing of 320 KVA capacity D.G. set (Kirloskar make) including replacement of following material, connection, testing etc. as required. \nFUEL FILTER CATRIGE | 18 | 2 | Each |
19 | 8.02 | SOINON ASSEMBL KIT | 19 | 1 | Each |
20 | 8.03 | LUB OIL FILTER | 20 | 1 | Each |
21 | 8.04 | LUB OIL FILTER - WITH KIRLOSKAR | 21 | 1 | Each |
22 | 8.05 | KOEL CARE\nGenuine Oil Premium 20 Litres Can\n | 22 | 2 | Each |
23 | 9 | Supplying of following size XLPE insulated PVC sheathed Aluminum Conductor Armoured power Cable (including rebate for old/replaced cable) of 1.1 KV grade including testing etc. complete as required. \n3 1/2 X 185 sq. mm | 23 | 200 | Meter |
24 | 9.01 | 3 1/2 X 120 sq. mm | 24 | 400 | Meter |
25 | 9.02 | 4 x 25 sq mm | 25 | 400 | Meter |
26 | 10 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation and refilling the trench etc as required, but\nexcluding sand cushioning and protective covering.\nAbove 95 sq. mm and upto 185 sq. mm .\n | 26 | 600 | Meter |
27 | 10.01 | Upto 35 sq. mm | 27 | 400 | Meter |
28 | 11 | Supplying and making straight through joint with heat shrinkable kit including ferrules and other jointing materials for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.\n3½ X 120 sq. mm | 28 | 4 | Each |
29 | 11.01 | 3½ X 185 sq. m | 29 | 4 | Each |
30 | 11.02 | 4 X 25 Sq mm | 30 | 4 | Each |