Operation And Maintenance Of Iron Elimination Plant Pressure Type Including Polishing Unit And Compressor Room For Bali Zone-Ii, Berhampore, Murshidabad-West Bengal

Public Health Engineering Department-PHED has published Operation And Maintenance Of Iron Elimination Plant Pressure Type Including Polishing Unit And Compressor Room For Bali Zone-Ii. Submission Date for this Tender is 09-07-2021. Iron removal Plant Tenders in Berhampore, Murshidabad West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

28187009
Corrigendum : Operation And Maintenance Of Iron Elimination Plant Pressure Type Including Polishing Unit And Compressor Room For Bali Zone-Ii
Open Tender
Indian
West Bengal
Berhampore, Murshidabad
09-07-2021

Tender Details

Operation And Maintenance Of Iron Elimination Plant Pressure Type Including Polishing Unit And Compressor Room For Bali Zone-Ii

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 26-Jun-2021 CORRIGENDUMI Other 05-07-2021
2 05-Jul-2021 CORRIGENDUMII Date 09-07-2021

Key Value

Document Fees
Refer document
EMD
INR 7000.0 /-
Tender Value
INR 3.34 Lakhs /-

BOQ Items

Name of Work: Operation and Maintenance of Iron Elimination Plant (Pressure Type) including polishing unit and Compressor Room for Bali Zone-II (IEP Capacity-134.00 cub.m/Hr) ground Water supply Scheme under Berhampore Division-I, P.H.E Dte
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Engagement of man power for operating of compressor, blower etc. for IEP / AIRP by opening & closing of all the different dia. sluice valves on different places of smooth running and back washing, including minor repairing i.e. change of gland of valves, mending of leakage pipe line of the plant, oiling & greasing of compressor, blower, cleaning of air filter and cleaning the surrounding area of plant by uprooting the grass & small trees completed as per direction of E.I.C\n1 Nos for 365 no =365 Man days\nDaily rate to each labour will have to be paid by the agency not less than Rs. 404.00 (Four Hundred and Four) only per day and bonus amounting @ 8.33% per day of the daily worker.\n ITEM 5 365 Man Day
2 2 Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments overhead expenditures. \n1 Nos for 12 Month= 12 Man Month ITEM 6 12 Month
3 3 During the period of Operation & Maintenance, all necessary manpower techanical skilled or unskilled, all accessories (civil, mechanical, electrical and instrumental) oil, lubricants and other consumable materials for Blower & compressor etc which are required for normal operation shall be provided by the contractor at his own cost, PHE Department will bear only the cost of electricity. Any breakdownor defect shall be promptly rectified or replaced by contractor and cost of oil.Lubricant or consumable materials for repairs etc that during the idle period shall be borne by the contractor. If the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D. Money. Responsible techanical representative of the contractor must visit the site at regularintervals and also on call during the period and inform to the E.I.C. ITEM 7 12 Month
4 4 During the period of Operation & Maintenance, all necessary manpower techanical skilled or unskilled, all accessories related to all kind of valves of pipeline and vessels related to AIRP (Modified Sujapur sadhipur Model) which are required for normal operation shall be provided by the contractor at his own cost, maintenance of pipelines related to AIRP within head works site. Any petty repairing or defect shall be promptly rectified or replaced by contractor during the idle period shall be borne by the contractor. If the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D. Money. Responsible techanical representative of the contractor must visit the site at regular intervals and also on call during the period and inform to the E.I.C. ITEM 8 12 Month
5 5 Chemical & bacteriological testing of Raw Water & Treated Water sample including cost of collection after each unit carrying to designated PHE/other laboratories and submission of report to the E.I.C. at regular interval (Once in every week basis) by the contractor at his cost during the O & M Period. ITEM 10 12 no.
6 6 As per Govt. order time to time and as per direction of EIC extra payment will be made to valve operator, pump operator by the agency, if the rate will increase from existing rate. (This item is applicable if the daily wages for item no 01 changes during this period.) ITEM 17 1 LS
7 7 Total = ITEM 18 295441 Each.
8 8 Gst @ 12% = ITEM 19 295441 Each.
9 9 CESS @ 1% = ITEM 20 330894 Each.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.