Archaeological Survey Of India -ASI has published Mw ( Sr ) Removal And Restoration Of The Dilapidated Portion ( South Part ) Of Majnu Bastion At Naya Quilla , Golconda Fort , Hyderabad - Execution Of Work Removal Of Fallen Bastion Debris , Removal Of Bulged Out Portions Of Bastions , Provision M. Submission Date for this Tender is 01-07-2021. Scaffolding Tenders in Naya Quilla, Golconda Fort, Hyderabad Telangana. Bidders can get complete Tender details and download the document.
Name of Work: < MW (SR) Removal and Restoration of the dilapidated portion (South Part) of Majnu Bastion at Naya Quilla, Golconda Fort, Hyderabad – Execution of work > | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Naya Quilla, Golconda Fort, Hyderabad | item1 | ||
2 | 1.01 | Removal of fallen bastion debris filled with huge cyclopean stones (working level: 0 to 9 meters) including stocking of the useful materials for reuse and transportation of the debris far away from the monument including labour charges, conveyance charges, loading, unloading, stocking, necessary applicable taxes, etc. all complete as per the directions of the ASI Department Officials / Site-Incharge. (Drawing / Photo as enclosed) (No heavy machinery should be used)\n(Quantity may vary as per site condition)\n\n\n | item2 | 1601.7 | Cum |
3 | 1.02 | Removal of bulged out portions of bastions and loose portions of bastions including labour charges, conveyance charges, diesel, loading, unloading, necessary applicable taxes, etc. all complete as per the directions of the ASI Department Officials / Site-Incharge. (Drawing / Photo as enclosed) (No heavy machinery should be used)\n(Quantity may vary as per site condition)\n\n | item3 | 219.46 | Cum |
4 | 1.03 | Provision made for erection of double / suitable tubular scaffolding with platforms to work at different levels using available departmental tubular pipes including cost of erection, transportation charges, materials as applicable, labour charges, loading, unloading, GST, conveyance charges etc. all complete as per the instructions and directions of the ASI Department Officials / Site Incharge. \n(Quantity may vary as per site condition)\n\n | item4 | 408 | Sqm |
5 | 1.04 | Provision made for packing / pointing and Grouting to the existing structure for a height of 11.6 m and width of 35 m Surface area where ever required and average thickness of 0.1 m with Lime Surkhi Mortar (1:1:1) during removal so as to avoid falling down during removal / reconstruction time including labour charges, material charges, conveyance charges, diesel charges, loading, unloading, applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site Incharge. (Drawing / Photo as enclosed) (Quantity may vary as per site condition)\n | item5 | 408 | Sqm |