West Bengal Power Development Corporation Limited has published Overhauling Of Boiler Pressure Parts At Unit6 During Aug21 And Replacement Of Economiser Coil , Bottom Bank Replacement 82 Nos . Under Capex 20-21 And Re-Heater Rear Coil Replacement 31 Nos Under Capex 19-20 For Unit6 During Unit Oh In Aug21 Overhaul. Submission Date for this Tender is 05-07-2021. Bags Supply Tenders in GM bldg,KTPS,Mecheda,Purba Medinipur West Bengal. Bidders can get complete Tender details and download the document.
Name of Work : Overhauling of Boiler Pressure Parts at Unit#6 During Aug'21 and replacement of Economiser Coil, Bottom bank replacement -82 nos. under Capex (20-21) and Re-heater rear coil replacement-31 nos under Capex(19-20) for Unit#6 during unit OH in Aug'21. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Qty | Units | |
1 | 1 | OH of Boiler Pressure Parts at Unit#6 | BI01010001010000000000000515BI0100001119 | ||
2 | 1.01 | Overhauling of Boiler drum | BI01010001010000000000000515BI0100001120 | 1 | LUMPSUM |
3 | 1.02 | Scaffolding of FSH, PLSH, R/H | BI01010001010000000000000515BI0100001121 | 1 | LUMPSUM |
4 | 1.03 | Cleaning of boiler pr. parts\nPLSH, RH by HP water jet | BI01010001010000000000000515BI0100001122 | 1 | LUMPSUM |
5 | 1.04 | Insertion of tube for FSH, PLSH, RH\n& LTSH, Joint | BI01010001010000000000000515BI0100001123 | 500 | Number |
6 | 1.05 | Lifting & refitting of LTSH Coil | BI01010001010000000000000515BI0100001124 | 30 | Coils |
7 | 1.06 | Removal, fabrication & fitting\nof guard tube & guard plate for PSH, RH,LTSH, Economizer,Cage wall, Baffle wall | BI01010001010000000000000515BI0100001125 | 100 | Pieces |
8 | 1.07 | Removal & fitting of guard tube\n& guard plate for PSH, RH,LTSH, Economizer, Cage wall,\nBaffle wall | BI01010001010000000000000515BI0100001126 | 4000 | Pieces |
9 | 1.08 | Skin casing welding | BI01010001010000000000000515BI0100001127 | 70 | Meter |
10 | 1.09 | Scaffolding of Economizer zone\nand cleaning of LTSH & Economizer Zone | BI01010001010000000000000515BI0100001128 | 1 | LUMPSUM |
11 | 1.1 | Repairing of Economizer hopper | BI01010001010000000000000515BI0100001129 | 1 | LUMPSUM |
12 | 1.11 | Lifting of eco. Coil and refitting\nafter repairing | BI01010001010000000000000515BI0100001130 | 40 | Coils |
13 | 1.12 | Insertion of Economizer tube, Joint | BI01010001010000000000000515BI0100001131 | 750 | Number |
14 | 1.13 | Fabrication of different size bends | BI01010001010000000000000515BI0100001132 | 65 | Pieces |
15 | 1.14 | Scaffolding of Furnace zone | BI01010001010000000000000515BI0100001133 | 1 | LUMPSUM |
16 | 1.15 | Cleaning of Furnace zone by HP water jet | BI01010001010000000000000515BI0100001134 | 1 | LUMPSUM |
17 | 1.16 | Insertion of furnace wall tubes, Joint | BI01010001010000000000000515BI0100001135 | 400 | Number |
18 | 1.17 | Deposition of weld metal\non tubes/stubs/headers etc | BI01010001010000000000000515BI0100001136 | 150 | Square inch |
19 | 1.18 | Stress Relieving for Pressure Welding joint | BI01010001010000000000000515BI0100001137 | 2 | Days |
20 | 1.19 | Welding of fins for boiler tubes | BI01010001010000000000000515BI0100001138 | 1050 | Meter |
21 | 1.2 | Fabrication of fins for boiler tubes | BI01010001010000000000000515BI0100001139 | 150 | Meter |
22 | 1.21 | Sealing at top of bottom hopper\nby wooden planks, GI sheets & gunny bags | BI01010001010000000000000515BI0100001140 | 1 | LUMPSUM |
23 | 1.22 | Repairing/Replacement of Corner\nBuck-stay | BI01010001010000000000000515BI0100001141 | 1 | LUMPSUM |
24 | 1.23 | Inspection of Pent house | BI01010001010000000000000515BI0100001142 | 1 | LUMPSUM |
25 | 1.24 | Repairing of Pent house | BI01010001010000000000000515BI0100001143 | 250 | Meter |
26 | 1.25 | Cleaning & resetting sling at Pent house | BI01010001010000000000000515BI0100001144 | 1 | LUMPSUM |
27 | 1.26 | Roof loose tube proper clamping | BI01010001010000000000000515BI0100001145 | 25 | Number |
28 | 1.27 | D-Metering of pressure parts\n(Minimum 5000 spots) | BI01010001010000000000000515BI0100001146 | 1 | LUMPSUM |
29 | 1.28 | DP test of Stub joints | BI01010001010000000000000515BI0100001147 | 1 | LUMPSUM |
30 | 1.29 | Radiography of pressure welding joints\nPer snap | BI01010001010000000000000515BI0100001148 | 3500 | Number |
31 | 1.3 | Servicing of Drum / SH safety valve | BI01010001010000000000000515BI0100001149 | 4 | Number |
32 | 1.31 | Servicing of soot Blower safety valve | BI01010001010000000000000515BI0100001150 | 1 | Number |
33 | 1.32 | Replacement of HP valve\nsize up to 2" (50mm) | BI01010001010000000000000515BI0100001151 | 30 | Number |
34 | 1.33 | Replacement of HP valve\nsize above 2" (50mm) to 4" (102mm ) | BI01010001010000000000000515BI0100001152 | 12 | Number |
35 | 1.34 | Man power assistance\n(4 nos of workmen) for checking & inspection of hanger &\nsupport of Boiler # 6 as\nPer requirement. | BI01010001010000000000000515BI0100001153 | 20 | Days |
36 | 1.35 | Scaffolding work\n(06 nos of workmen) for checking & inspection of hanger &\nsupport of Boiler # 6 and removal after completion of work. | BI01010001010000000000000515BI0100001154 | 51 | Number |
37 | 1.36 | Hiring of Escort crane with operator\n& fuel. | BI01010001010000000000000515BI0100001155 | 1 | LUMPSUM |
38 | 1.37 | Servicing of Wall blowers | BI01010001010000000000000515BI0100001156 | 56 | Number |
39 | 1.38 | Boiler external cleaning by air & water | BI01010001010000000000000515BI0100001157 | 1 | LUMPSUM |
40 | 2 | Economiser Coil, Bottom bank-82 nos | BI01010001010000000000000515BI0100001158 | ||
41 | 2.01 | Replacement of Eco Bottom bank coil | BI01010001010000000000000515BI0100001159 | 82 | Number |
42 | 3 | Re-Heater Coils - 31 Nos. | BI01010001010000000000000515BI0100001160 | ||
43 | 3.01 | Replacement of Re-Heater Coils | BI01010001010000000000000515BI0100001161 | 31 | Number |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy