Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Works Contract In Respect Of Thalaivasal Sub- Division. Submission Date for this Tender is 29-06-2021. Transmission Line Tenders in Thalaivasal Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: - Works Contract in respect of Thalaivasal Sub- Division | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation of Pole/Stay pits | |||
2 | 2 | Excavation of pole pit up to 27”(8.0m) pole | 350 | Each Pit | |
3 | 3 | Stay bit 4.5” to 5” depth | 250 | Each Pit | |
4 | 4 | Excavation of pole pit up to 9.14 Mtr pole | 50 | Each Pit | |
5 | 5 | Erection of Poles | |||
6 | 6 | RCC poles/Metal pole up to 8.00m (27’) | 350 | Each Pole | |
7 | 7 | RCC poles/Metal pole up to 9.14.m(30’) | 50 | Each Pole | |
8 | 8 | Erection of stay set complete | 250 | Each Stay | |
9 | 9 | Fixing of line materials | |||
10 | 10 | HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 | 150 | Each | |
11 | 11 | LT 3 Phase cross arm | 600 | Each | |
12 | 12 | LT single Phase cross arm | 300 | Each | |
13 | 13 | HT / LT TI Fitting | 200 | Each | |
14 | 14 | Fixing of HT Pin Insulators (11/22/33KV) | 100 | Each | |
15 | 15 | Fixing of HT 11KV strain disc | 100 | Each | |
16 | 16 | Fixing of LT Pin Insulators | 800 | Each | |
17 | 17 | Fixing of LT Shackle | 400 | Each | |
18 | 18 | Fixing of Aluminium knob | 350 | Each | |
19 | 19 | Paving and Stringing of conductor | |||
20 | 20 | Paving of conductor ,Stringing , binding , Jumpering etc 7/3.35mm ACSR 7/3.15mmAAAC | 225 | Per Wire Per Span | |
21 | 21 | 7/2.59mm ACSR & 7/2.11mm ACSR | 1000 | Per Wire Per Span | |
22 | 22 | Structure Erection | |||
23 | 23 | Structure poles ,fixing of top channel seating ,wiring earthing , fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (except erection of transformer ) | 4 | Per Str | |
24 | 24 | Transporting of poles/Materials/Conductors | |||
25 | 25 | Transporting of poles from road side to pole pit up to 27 ' | 400 | Per Pole | |
26 | 26 | Transporting of poles from road side to pole pit 30 ' and above including RSJ pole | 50 | Per Pole | |
27 | 27 | Guarding Arrangements | |||
28 | 28 | LT Split neutral guarding | 50 | Per Span | |
29 | 29 | HT Guarding | 25 | Per Span | |
30 | 30 | Service Connections | |||
31 | 31 | Releasing of Single Phase service wire and refixing | 400 | Each | |
32 | 32 | Releasing of Three Phase service wire and refixing | 100 | Each | |
33 | 33 | Releasing of grills from RCC Poles | 150 | Each | |
34 | 34 | Dismantling of Line Materials | |||
35 | 35 | Dismantling of pole (9.14mtr) | 25 | Each | |
36 | 36 | Dismantling of pole (7.5mtr & 8mtr) | 150 | Each | |
37 | 37 | Dismantling of HT Pin Insulator | 100 | Each | |
38 | 38 | Dismantling of HT /LT TI Fitting | 50 | Each | |
39 | 39 | Dismantling of 11 KV Disc | 150 | Each | |
40 | 40 | Dismantling of 3 PH X arm | 100 | Each | |
41 | 41 | Dismantling of Tapping X arm, V X arm & Guarding X arm | 50 | Each | |
42 | 42 | Dismantling of 1 PH X arm | 75 | Each | |
43 | 43 | Dismantling of Alu Knob | 50 | Each | |
44 | 44 | Dismantling of LT pin Insulator | 150 | Each | |
45 | 45 | Dismantling of LT Shackle Insulator | 100 | Each | |
46 | 46 | Dismantling of Stayset Complete | 50 | Each | |
47 | 47 | Releasing of Conductor ACSR 7/4.09 mm | 30 | Per Wire Per Span | |
48 | 48 | Releasing of Conductor ACSR 7/3.00 mm & 7/3.35 mm | 500 | Per Wire Per Span | |
49 | 49 | Releasing of Conductor ACSR 7/2.11 mm & 7/2.59 mm | 1000 | Per Wire Per Span | |
50 | 50 | Re-Stringing of Lines | |||
51 | 51 | Re-Stringing of LT Lines for all sizes of Conductor | 200 | Per Wire Per Span | |
52 | 52 | Re-stringing of HT line 7/2.59 mm ACSR | 50 | Per Wire Per Span | |
53 | 53 | Re-stringing of HT line 7/3.35 mm ACSR | 50 | Per Wire Per Span | |
54 | 54 | HVDS Structure Erection | |||
55 | 55 | Erection of single pole structure | 4 | Each | |
56 | 56 | Loading/Unloading of Poles | |||
57 | 57 | Loading of Poles upto 27" | 350 | Per Pole | |
58 | 58 | Loading of Poles upto 30"/RSJ Pole | 50 | Per Pole | |
59 | 59 | Unloading of Poles upto 27" | 350 | Per Pole | |
60 | 60 | Unloading of Poles upto 30"/RSJ Pole | 50 | Per Pole | |
61 | 61 | Loading/Unloading of Transformers | |||
62 | 62 | Loading/unloading of Transformer (63 to 200)KVA | 9 | Each | |
63 | 63 | Erection of New Transformer (63 to 200)KVA | 9 | Each | |
64 | 64 | Drilling of hoe in channel only 3/4" & 1" per hole | 300 | Each | |
65 | 65 | Transporting of Materials | |||
66 | 66 | Transporting of Materials / Conductors and Other Materials (excluding loading & Unloading Charges) | 10 | Per Tonne | |
67 | 67 | E.S.I. @ 3.25 % should be Entered by the Bidder. | 1 | Percentage | |
68 | 68 | E.P.F. @ 13 % should be Entered by the Bidder. | 1 | Percentage | |
69 | 69 | G.S.T. @ 18% should be Entered by the Bidder. | 1 | Percentage |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail