}

Works Contract In Respect Of Thalaivasal Sub- Division, Thalaivasal-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Works Contract In Respect Of Thalaivasal Sub- Division. Submission Date for this Tender is 29-06-2021. Transmission Line Tenders in Thalaivasal Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

28081357
Works Contract In Respect Of Thalaivasal Sub- Division
Open Tender
Indian
Tamil Nadu
Thalaivasal
29-06-2021

Tender Details

Works Contract In Respect Of Thalaivasal Sub- Division - 1 Excavation Of Pole / Stay Pits 2 Excavation Of Pole Pit Up To 27” ( 8.0M ) Pole 3 Stay Bit 4.5” To 5” Depth 4 Excavation Of Pole Pit Up To 9.14 Mtr Pole 5 Erection Of Poles 6 Rcc Poles / Metal Pole Up To 8.00M ( 27’ ) 7 Rcc Poles / Metal Pole Up To 9.14.M ( 30’ ) 8 Erection Of Stay Set Complete 9 Fixing Of Line Materials 10 Ht V Cross Arms / Channel Cross Arms / Guarding Cross Arm 4 1 / 2 11 Lt 3 Phase Cross Arm 12 Lt Single Phase Cross Arm 13 Ht / Lt Ti Fitting 14 Fixing Of Ht Pin Insulators ( 11 / 22 / 33Kv ) 15 Fixing Of Ht 11Kv Strain Disc 16 Fixing Of Lt Pin Insulators 17 Fixing Of Lt Shackle 18 Fixing Of Aluminium Knob 19 Paving And Stringing Of Conductor 20 Paving Of Conductor , Stringing , Binding , Jumpering Etc 7 / 3.35Mm Acsr 7 / 3.15Mmaaac 21 7 / 2.59Mm Acsr & 7 / 2.11Mm Acsr 22 Structure Erection 23 Structure Poles , Fixing Of Top Channel Seating , Wiring Earthing , Fixing Of Open Type Fuse Units, Ht / Lt / Las And Jumpering 3 Nos, Earth Pits With Tubes Including Painting Of Metal Parts, Structure Poles, Fixing Of Top Channel Seating Channel, Belting Angle ( Except Erection Of Transformer ) 24 Transporting Of Poles / Materials / Conductors 25 Transporting Of Poles From Road Side To Pole Pit Up To 27 26 Transporting Of Poles From Road Side To Pole Pit 30 And Above Including Rsj Pole 27 Guarding Arrangements 28 Lt Split Neutral Guarding 29 Ht Guarding 30 Service Connections 31 Releasing Of Single Phase Service Wire And Refixing 32 Releasing Of Three Phase Service Wire And Refixing 33 Releasing Of Grills From Rcc Poles 34 Dismantling Of Line Materials 35 Dismantling Of Pole ( 9.14Mtr ) 36 Dismantling Of Pole ( 7.5Mtr & 8Mtr ) 37 Dismantling Of Ht Pin Insulator 38 Dismantling Of Ht / Lt Ti Fitting 39 Dismantling Of 11 Kv Disc 40 Dismantling Of 3 Ph X Arm 41 Dismantling Of Tapping X Arm, V X Arm & Guarding X Arm 42 Dismantling Of 1 Ph X Arm 43 Dismantling Of Alu Knob 44 Dismantling Of Lt Pin Insulator 45 Dismantling Of Lt Shackle Insulator 46 Dismantling Of Stayset Complete 47 Releasing Of Conductor Acsr 7 / 4.09 Mm 48 Releasing Of Conductor Acsr 7 / 3.00 Mm & 7 / 3.35 Mm 49 Releasing Of Conductor Acsr 7 / 2.11 Mm & 7 / 2.59 Mm 50 Re-Stringing Of Lines 51 Re-Stringing Of Lt Lines For All Sizes Of Conductor 52 Re-Stringing Of Ht Line 7 / 2.59 Mm Acsr 53 Re-Stringing Of Ht Line 7 / 3.35 Mm Acsr 54 Hvds Structure Erection 55 Erection Of Single Pole Structure 56 Loading / Unloading Of Poles 57 Loading Of Poles Upto 27 58 Loading Of Poles Upto 30 / Rsj Pole 59 Unloading Of Poles Upto 27 60 Unloading Of Poles Upto 30 / Rsj Pole 61 Loading / Unloading Of Transformers 62 Loading / Unloading Of Transformer ( 63 To 200 ) Kva 63 Erection Of New Transformer ( 63 To 200 ) Kva 64 Drilling Of Hoe In Channel Only 3 / 4 & 1 Per Hole 65 Transporting Of Materials 66 Transporting Of Materials / Conductors And Other Materials ( Excluding Loading & Unloading Charges )

Key Value

Document Fees
Refer document
EMD
INR 23000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: - Works Contract in respect of Thalaivasal Sub- Division
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation of Pole/Stay pits
2 2 Excavation of pole pit up to 27”(8.0m) pole 350 Each Pit
3 3 Stay bit 4.5” to 5” depth 250 Each Pit
4 4 Excavation of pole pit up to 9.14 Mtr pole 50 Each Pit
5 5 Erection of Poles
6 6 RCC poles/Metal pole up to 8.00m (27’) 350 Each Pole
7 7 RCC poles/Metal pole up to 9.14.m(30’) 50 Each Pole
8 8 Erection of stay set complete 250 Each Stay
9 9 Fixing of line materials
10 10 HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 150 Each
11 11 LT 3 Phase cross arm 600 Each
12 12 LT single Phase cross arm 300 Each
13 13 HT / LT TI Fitting 200 Each
14 14 Fixing of HT Pin Insulators (11/22/33KV) 100 Each
15 15 Fixing of HT 11KV strain disc 100 Each
16 16 Fixing of LT Pin Insulators 800 Each
17 17 Fixing of LT Shackle 400 Each
18 18 Fixing of Aluminium knob 350 Each
19 19 Paving and Stringing of conductor
20 20 Paving of conductor ,Stringing , binding , Jumpering etc 7/3.35mm ACSR 7/3.15mmAAAC 225 Per Wire Per Span
21 21 7/2.59mm ACSR & 7/2.11mm ACSR 1000 Per Wire Per Span
22 22 Structure Erection
23 23 Structure poles ,fixing of top channel seating ,wiring earthing , fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (except erection of transformer ) 4 Per Str
24 24 Transporting of poles/Materials/Conductors
25 25 Transporting of poles from road side to pole pit up to 27 ' 400 Per Pole
26 26 Transporting of poles from road side to pole pit 30 ' and above including RSJ pole 50 Per Pole
27 27 Guarding Arrangements
28 28 LT Split neutral guarding 50 Per Span
29 29 HT Guarding 25 Per Span
30 30 Service Connections
31 31 Releasing of Single Phase service wire and refixing 400 Each
32 32 Releasing of Three Phase service wire and refixing 100 Each
33 33 Releasing of grills from RCC Poles 150 Each
34 34 Dismantling of Line Materials
35 35 Dismantling of pole (9.14mtr) 25 Each
36 36 Dismantling of pole (7.5mtr & 8mtr) 150 Each
37 37 Dismantling of HT Pin Insulator 100 Each
38 38 Dismantling of HT /LT TI Fitting 50 Each
39 39 Dismantling of 11 KV Disc 150 Each
40 40 Dismantling of 3 PH X arm 100 Each
41 41 Dismantling of Tapping X arm, V X arm & Guarding X arm 50 Each
42 42 Dismantling of 1 PH X arm 75 Each
43 43 Dismantling of Alu Knob 50 Each
44 44 Dismantling of LT pin Insulator 150 Each
45 45 Dismantling of LT Shackle Insulator 100 Each
46 46 Dismantling of Stayset Complete 50 Each
47 47 Releasing of Conductor ACSR 7/4.09 mm 30 Per Wire Per Span
48 48 Releasing of Conductor ACSR 7/3.00 mm & 7/3.35 mm 500 Per Wire Per Span
49 49 Releasing of Conductor ACSR 7/2.11 mm & 7/2.59 mm 1000 Per Wire Per Span
50 50 Re-Stringing of Lines
51 51 Re-Stringing of LT Lines for all sizes of Conductor 200 Per Wire Per Span
52 52 Re-stringing of HT line 7/2.59 mm ACSR 50 Per Wire Per Span
53 53 Re-stringing of HT line 7/3.35 mm ACSR 50 Per Wire Per Span
54 54 HVDS Structure Erection
55 55 Erection of single pole structure 4 Each
56 56 Loading/Unloading of Poles
57 57 Loading of Poles upto 27" 350 Per Pole
58 58 Loading of Poles upto 30"/RSJ Pole 50 Per Pole
59 59 Unloading of Poles upto 27" 350 Per Pole
60 60 Unloading of Poles upto 30"/RSJ Pole 50 Per Pole
61 61 Loading/Unloading of Transformers
62 62 Loading/unloading of Transformer (63 to 200)KVA 9 Each
63 63 Erection of New Transformer (63 to 200)KVA 9 Each
64 64 Drilling of hoe in channel only 3/4" & 1" per hole 300 Each
65 65 Transporting of Materials
66 66 Transporting of Materials / Conductors and Other Materials (excluding loading & Unloading Charges) 10 Per Tonne
67 67 E.S.I. @ 3.25 % should be Entered by the Bidder. 1 Percentage
68 68 E.P.F. @ 13 % should be Entered by the Bidder. 1 Percentage
69 69 G.S.T. @ 18% should be Entered by the Bidder. 1 Percentage
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail