Rural Development Department has published Construction Of Link Road Batapora Baghwan At Sallar-A Block Dachnipora Construction Of Link Road Batapora Baghwan At Sallar-A Block Dachnipora. Submission Date for this Tender is 17-06-2021. Road Work Tenders in anantnag Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: CONSTRUCTION of link road Batpora Bagwan at Sallar Upper | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Site Clearance by way of engagement of labours i.c cutting of shrubs, etc. And dewatering trenches | 10 | Labs | |
2 | 2 | Earth work in excavation by manual means in trenches, drains, pipes, cables etc (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 Sq.M in plan, depth up to 1.5 mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil. with all leads , lifts carriages complete. | 4.25 | Cum | |
3 | 3 | Providing, supplying laying and filling including hand packing in foundation and plinth dry stone soling with all leads , lifts carriages complete. | 1.4 | Cum | |
4 | 4 | Provifding and laying of cement concrete of specified grade excluding the cost of centering and shuttering using M10 mix(1:3:6) with 20mm NSA | 8.5 | Cum | |
5 | 5 | Placing and laying of plums (20% Qty.) @5Km Carriage | 1.7 | Cum | |
6 | 6 | Centring and shuttering including strutting propping etc. and removal of form for:-Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 23.23 | Sqm | |
7 | 7 | Supply and filing of nallah much i/c dressing levelling with all leads and lifts; complete iob | 145.28 | Cum | |
8 | 8 | Suppy and stacking of stone aggregates(63-45mm size), Quarry | 66.9 | Cum | |
9 | 9 | Supply and stacking of Stone screening(11.2mm size) | 3.12 | Cum | |
10 | 10 | Supply and stacking of crusher dust | 12.23 | Cum | |
11 | 11 | Laying of WBM to specific lines, grades and cross sections with binding material i/c consolidation with PRR 8-10 ton capacity | 66.9 | Cum | |
12 | 12 | Provision for RCC spun pipes of 300mm dia(STA) | 2 | Nos | |
13 | 13 | Carriage of materials | BI01010001010000000000000515BI0100001124 | ||
14 | 14 | Bajri/sand @20Km | 11.55 | Cum | |
15 | 15 | Cement @5Km | 1 | trip | |
16 | 16 | Stone Aggregates(Quarry) @20Km | 66.9 | Cum | |
17 | 17 | Stone Screening @ 20Km | 3.12 | Cum | |
18 | 18 | Crusher Dust @20Km | 12.23 | Cum | |
19 | 19 | RCC Spun Pipes @35Km | 1 | Trips | |
20 | 20 | Provision for signboard, plastering (255sqm) photographs and other unforeseen items(STA) | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail