Department of Cooperation has published Tender For Dismantling Fabrication And Erection Jobs. Submission Date for this Tender is 22-06-2021. Earth Moving Machinery Tenders in NAWANSHAHR Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-Jun-2021 | corrigendum | Date | 22-06-2021 |
Name of the Work: Dismantling, Fabrication & Erection Jobs. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismantling, Fabrication & Erection Jobs | 1 | ||
2 | 2 | Dismantling of MS /CI /GI pipe line upto 12" | 2 | 1 | Per inch dia/mtr |
3 | 3 | Erection of MS /CI /GI pipe line upto 12" | 3 | 2 | Per inch dia/mtr |
4 | 4 | Dismantling of MS/GI/CI pipe line, flanges, nipples, bends, reducers all sizes. | 4 | 3 | Per inch dia |
5 | 5 | Erection of MS/CI/GI pipe line, flanges, nipples, bends, reducers all sizes. | 5 | 4 | Per inch dia |
6 | 6 | Fabrication of bends, nipples, reducer, Tee of all sizes. | 6 | 5 | Per inch dia |
7 | 7 | Fabrication of M.S. blinds of all sizes | 7 | 6 | Per inch dia |
8 | 8 | Dismantling of S.S. pipe line upto 12" | 8 | 7 | Per inch dia/mtr |
9 | 9 | Erection of S.S. pipe line upto 12" | 9 | 8 | Per inch dia/mtr |
10 | 10 | Dismantling of S.S.bends , nipple, reducer, Tee etc | 10 | 9 | Per inch dia |
11 | 11 | Erection of S.S. bends, nipplem reducer, Tee etc | 11 | 10 | Per inch dia |
12 | 12 | Dismantling of S.S. pipe line above 12" | 12 | 11 | Per inch dia/mtr |
13 | 13 | Erection of S.S. pipe line above 12" | 13 | 12 | Per inch dia/mtr |
14 | 14 | Fabrication of S.S. pipe line above 12" | 14 | 13 | Per inch dia/mtr |
15 | 15 | Fabrication of S.S.bends , nipple, reducer, Tee above 12" | 15 | 14 | Per inch dia |
16 | 16 | Erection of S.S. bends, nipplem reducer, Tee above12" | 16 | 15 | Per inch dia |
17 | 17 | Dismantling of all types of cocks/valves of all sizes. | 17 | 16 | Per inch dia |
18 | 18 | Erection of all types of cocks/valves of all sizes. | 18 | 17 | Per inch dia |
19 | 19 | Dismantling and erection of M.S. plateform. | 19 | 18 | Per Sq.ft. |
20 | 20 | Fabrication of M.S. plateform. | 20 | 19 | Per Sq.ft. |
21 | 21 | M.S. patch work | 21 | 20 | Per Sq. ft |
22 | 22 | Dismantling & Erection of manhole of all sizes including nipple, blind etc. | 22 | 21 | Per inch dia |
23 | 23 | Replacement of S.S./Brass tubes of all evaporators, juice heater, semikestner, vapour cell & Pans during season and off season as per requirement. | 23 | 22 | Per Tube |
24 | 24 | Pluging of tubes of juice heater, semikestner, vapour cell, evaporator bodies, Pans. | 24 | 23 | Per Tube |
25 | 25 | Fabrcation and erection of lquidation tray for both mud lime of dorr and its outlet pipes to be put in mud receiving tank of RVF. | 25 | 24 | L.S. |
26 | 26 | All welding works/joints. | 26 | 25 | Per running ft. |
27 | 27 | Fabrication and erection of SS rubber seated valve of all sizes. | 27 | 26 | Per Inch dia |
28 | 28 | Fabrication & Erection of Grit catcher of pumps. | 28 | 27 | L.S.EACH |
29 | 29 | Fabrication & Erection of Strainer of pumps. | 29 | 28 | L.S.EACH |
30 | 30 | Dismantling and Erection of MS Flat/T.Iron/Runners of Carriers | 30 | 29 | Per R.Mtr. |
31 | 31 | Fabrication of inter and secondary carrier racks | 31 | 30 | Each rack |
32 | 32 | Dismantling, Fabrication & Erection of hood of chopper/leveler/ fibrizer and ID fan. | 32 | 31 | L.S. each |
33 | 33 | Repair of donelly chute i.e. replacement of wornout plates. | 33 | 32 | L.S. each |
34 | 34 | Fabrication & Erection of shed for electric motors, panel boards and any other machinery parts. | 34 | 33 | Per Sqm |
35 | 35 | Strengthening of structure of cane unloader no. 1/2/3. | 35 | 34 | L.S. each |
36 | 36 | Dismantling, Fabrication & Erection of wornout ducting of ID /FD fan. | 36 | 35 | By weight PMT |
37 | 37 | Dismantling, Fabrication & Erection of ash screen for APCD plant. | 37 | 36 | L.S. each |
38 | 38 | Dismantling & Erection of steam pipes, blowdown pipe or any other high pressure pipe line. | 38 | 37 | Per inch dia/mtr |
39 | 39 | Dismantling, Fabrication & Erection of bagasse feeder chute of boiler | 39 | 38 | L.S. each |
40 | 40 | Dismantling, Fabrication & Erection of dampers. | 40 | 39 | L.S. each |
41 | 41 | Dismantling, Fabrication & Erection of ash hopper of lipi boiler. | 41 | 40 | L.S. each |
42 | 42 | Replacement of ID fans/impeller. | 42 | 41 | L.S. each |
43 | 43 | Bottom cone to be replaced of APCD clarifier. | 43 | 42 | L.S. |
44 | 44 | Dismantling, Fabrication & Erection of wornout plate of APCD Clarifier. | 44 | 43 | PMT |
45 | 45 | Dismantling, Fabrication & Erection of top/bottom cone of wet scrubber complete. | 45 | 44 | L.S. each |
46 | 46 | Fabrication & Erection of casing FD fan. | 46 | 45 | L.S. each |
47 | 47 | Dismantling, Fabrication & Erection of baffle of wet scrubber of APCD. | 47 | 46 | L.S. |
48 | 48 | Dismantling, Fabrication & Erection of shell of APCD wet scrubber. | 48 | 47 | PMT |
49 | 49 | Dismantling & Erection of De- mister screen of APCD. | 49 | 48 | L.S. each |
50 | 50 | Dismantling & Erection of sieve plate of APCD. | 50 | 49 | L.S. |
51 | 51 | Dismantling, Fabrication & Erection of MS structure of DSM screen of APCD. | 51 | 50 | L.S. |
52 | 52 | Straightening of MS old plates to be used as platform. | 52 | 51 | Per Sq.ft. |
53 | 53 | Replacement of wornout portion of bagacillo jacket of bagasse elevator. | 53 | 52 | L.S. |
54 | 54 | Trough of RBC chain. | 54 | 53 | Per mts² |
55 | 55 | Dismantling, fabrication and erection of all wornout beam channel, angles etc in juice line as per desired. | 55 | 54 | P.M.T. |
56 | 56 | Cutting of SS/brass tubes of Pans/evaporator bodies/juice heaters etc. | 56 | 55 | Per Tube |
57 | 57 | Dismantling, fabrication and erection of all sugar grader chutes complete. | 57 | 56 | L.S. |
58 | 58 | Dismantling & Erection of air compressor with motor and bed. | 58 | 57 | L.S. |
59 | 59 | Dismantling, Fabrication & Erection of Mud tray of RVF. | 59 | 58 | L.S.each |
60 | 60 | Dismantling, Fabrication & Erection of vapour vent coil of juice heater/semikestner/vapour cell/quad bodies/Pan. | 60 | 59 | L.S. each. |
61 | 61 | Replacement of wornout MS partition plates including MS strips complete of juice heater Top portion complete | 61 | 60 | L.S. each |
62 | 62 | Repair of MS of squarber for holding of rubber strips of juice heaters of top and bottom portion. | 62 | 61 | L.S. each juice heater |
63 | 63 | Virbo screen at lime station or melter. Erection | 63 | 62 | L.S. each |
64 | 64 | Dismantling, Fabrication & Erection of Primary cooler with water spray coil complete in all respect | 64 | 63 | L.S. each |
65 | 65 | Dismantling, Fabrication & Erection of c. Secondary cooler with water spray coil complete in all respect | 65 | 64 | L.S. each |
66 | 66 | Dismantling, fabrication and erection of Juice sulphiter complete in all respect including top & bottom | 66 | 65 | PMT |
67 | 67 | Replacement of wornout juice chamber of dorr including top. | 67 | 66 | L.S |
68 | 68 | Dismantling, fabrication and erection of Save all with baffles of quad bodies/Pan. | 68 | 67 | L.S. |
69 | 69 | Repair of internal water pipe nipple SS nozzle box etc. of Pan/quad condensers. | 69 | 68 | L.S. |
70 | 70 | Dismantling, fabrication and erection of vacuum cryt. Complete in all respect with shaft and arm with trail. | 70 | 69 | PMT |
71 | 71 | Replacement of wornout bottom round portion of cryst, | 71 | 70 | PMT |
72 | 72 | Dismantling of old SS nozzle jet box, ventury etc and erection SS nozzle jet box, ventury, stainer, cutting of tail pipe etc complete in all respect. | 72 | 71 | L.S. |
73 | 73 | Dismantling and dumping in scrap yard 2 nos. receiving tank near vertical cryst., 1 no.tank near cryst. no. 12, 1 no. tank below RVF 3, 2 nos. old cooler of sulphur furnace and its old pipe line etc. | 73 | 72 | L.S |
74 | 74 | Dismantling, Fabrication and erection of plain hopper with satisfactory trial. | 74 | 73 | Per running mtr. |
75 | 75 | Dismantling, Fabrication and erection of tray pieces of multi tray hopper. | 75 | 74 | Per tray |
76 | 76 | Replacement of old cold air blower and erection of new blower with motor including hot/cold air inlet ducting in both nearby multi tray hopper. | 76 | 75 | L.S. each |
77 | 77 | Replacement of both scrappers of ETP secondary clarifier. | 77 | 76 | L.S. |
78 | 78 | Repair work of wornout top roof of final molasses tank by carpeting 3 mm/4 mm MS plate. | 78 | 77 | PMT |
79 | 79 | Dismantling and fitting of sight glass frame compete as required. | 79 | 78 | L.S. each |
80 | 80 | Repair of base of chimeny of Lipi Boiler (Straightening is to be done). | 80 | 79 | L.S. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail