Department of Cooperation has published General Fabrication Erection Of Contract Job General Fabrication Erection Of Contract Job. Submission Date for this Tender is 09-06-2021. Fabrication Work Tenders in THE AJNALA COOP SUGAR MILLS LTD AJNALA Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-May-2021 | CORRIGENDUM | Date | 09-06-2021 |
Name of Work: General Fabricatin and Erection of Contract Job 2021-22 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | General Fabricatin and Erection of Contract Job 2021-22 | T1 | ||
2 | 1.01 | Dismantling of M.S columns struture , steel staging & platform | T2 | 1 | P/MT |
3 | 1.02 | Dismantling,Fabrication & Erection of M.S. Columns structure,staging & platform. | T3 | 1 | P/MT |
4 | 1.03 | Dismantling of various sized Tanks, round & Rectangular and their dragging/ shifting as per instructions. | T4 | 1 | P/MT |
5 | 1.04 | Fabrication & Erection of M.S. rectangular tank from 6,8,10& 12mm thick plates | T5 | 1 | P/MT |
6 | 1.05 | Fabrication & Erection of M.S. flat bottom, Round, Tank from 6,8,10& 12mm thick plates | T6 | 1 | P/MT |
7 | 1.06 | Fabrication & Erection of M.S. conical bottom, Round, Tank from 6,8,10 & 12mm thick plates | T7 | 1 | P/MT |
8 | 1.07 | Dismantling,Fabrication & Erection of vertical portion of final molasses storage tank | T8 | 1 | P/MT |
9 | 1.08 | Fabrication & Erection of MS Juice/syrup massecuite/Molasses Gutters from 5,6,8 and 10mm thick plates | T9 | 1 | P/MT |
10 | 1.09 | Dismantling & shifting/dragging of various sizes of MS pipes above 12” dia | T10 | 1 | P/MT |
11 | 1.1 | Fabrication & Erection of MS pipe above 12” Dia from 6,8,10mm thick plates | T11 | 1 | P/Pc. |
12 | 1.11 | Dismantling of MS Bend/Tee/Reducer/Nipple above 12” dia & shifting/dragging as per instructions | T12 | 1 | P/Pc. |
13 | 1.12 | Fabrication & Erection of MS Bend of different sized from 3mm,5mm,6mm,8mm& 10mm thick MS plates above 12” dia | T13 | 1 | P/Inch Dia/mtr.. |
14 | 1.13 | a) Dismantling of various sizes of pipe lines with fitted up to 12” dia (IBR) | T14 | 1 | P/Inch Dia/mtr.. |
15 | 1.14 | b) Dismantling of various sizes of pipe lines with fitted up to 12” dia (Non IBR) | T15 | 1 | P/Inch Dia/mtr.. |
16 | 1.15 | a) Erection of different sizes of pipes up to 12: dia (IBR) | T16 | 1 | P/Inch Dia/pc. |
17 | 1.16 | b) Erection of different sizes of pipes up to 12: dia (Non IBR) | T17 | 1 | P/Inch Dia/Pc. |
18 | 1.17 | Dismantling, Fabrication & Erection of MS Tee from 6mm,8mm,10mm thick | T18 | 1 | P/Inch Dia/Pc. |
19 | 1.18 | Dismantling, Fabrication & Erection of MS Nipples above 12 “ dia from 6mm,8mm,10mm thick plates | T19 | 1 | P/Inch Dia/Pc. |
20 | 1.19 | Dismantling, Fabrication & Erection of MS reducer above 12 “ dia from 6mm,8mm,10mm thick plates | T20 | 1 | P/Inch Dia/Pc. |
21 | 1.2 | a) Fabrication of MS Tee (IBR) up to 12” dia from MS pipe | T21 | 1 | P/Inch Dia/Pc. |
22 | 1.21 | b) Fabrication of MS Tee (Non IBR) up to 12” dia from MS pipe | T22 | 1 | P/Inch Dia/Pc. |
23 | 1.22 | a) Fabrication of MS Nipples (IBR) up to 12” dia from MS pipe | T23 | 1 | P/Inch Dia/Pc. |
24 | 1.23 | b) Fabrication of MS Nipples (Non IBR) up to 12” dia from MS pipes | T24 | 1 | P/Inch Dia/Pc. |
25 | 1.24 | a) Fabrication of MS reducer (IBR) up to 12” dia from MS pipes | T25 | 1 | P/Inch Dia/Pc. |
26 | 1.25 | b) Fabrication of MS Reducer (Non IBR) up to 12” dia from MS pipes | T26 | 1 | P/Inch Dia/Pc. |
27 | 1.26 | Fabrication of MS Bend& Elbow (Non IBR) up to 12” dia from MS pipes | T27 | 1 | P/Inch Dia/Pc. |
28 | 1.27 | a) Fabrication of MS Cross( IBR) up to 12” dia from MS pipes | T28 | 1 | P/Inch Dia/Pc. |
29 | 1.28 | b) Fabrication of MS Cross (Non IBR) up to 12” dia from MS pipes | T29 | 1 | P/Inch Dia/Pc. |
30 | 1.29 | a) Erection of MS Tee (IBR) up to 12 “ dia from MS Pipe | T30 | 1 | P/Inch Dia/Pc. |
31 | 1.3 | b) Erection of MS Tee (Non IBR) up to 12 “ dia from MS Pip | T31 | 1 | P/Inch Dia/Pc. |
32 | 1.31 | a) Erection of MS Nipples (IBR) up to 12 “ dia from MS Pipe | T32 | 1 | P/Inch Dia/Pc. |
33 | 1.32 | b) Erection of MS Nipples (Non IBR) up to 12 “ dia from MS Pipe | T33 | 1 | P/Inch Dia/Pc. |
34 | 1.33 | a) Erection of MS Reducer (IBR) up to 12 “ dia from MS Pipe | T34 | 1 | P/Inch Dia/Pc. |
35 | 1.34 | b) Erection of MS Reducer (Non IBR) up to 12 “ dia from MS Pipe | T35 | 1 | P/Inch Dia/Pc. |
36 | 1.35 | a) Erection of MS Bend & Elbow (IBR) up to 12 “ dia from MS Pipe | T36 | 1 | P/Inch Dia/Pc. |
37 | 1.36 | b) Erection of MS Bend & Elbow (Non IBR) up to 12 “ dia from MS Pipe | T37 | 1 | P/Inch Dia/Pc. |
38 | 1.37 | a) Erection of MS Cross (IBR) up to 12 “ dia from MS Pipe | T38 | 1 | P/Inch Dia/Pc. |
39 | 1.38 | b) Erection of MS Cross (Non IBR) up to 12 “ dia from MS Pipe | T39 | 1 | P/Inch Dia/Pc. |
40 | 1.39 | Fabrication of MS flange from 10mm to 33mm thick MS plate with duly drilled holes | T40 | 1 | P/Inch Dia/Pc. |
41 | 1.4 | Dismantling of valves upto 12” | T41 | 1 | P/Inch Dia/Pc. |
42 | 1.41 | Fitting of valves upto 12” dia | T42 | 1 | P/Inch Dia/Pc. |
43 | 1.42 | Dismantling of valves up to 12” dia | T43 | 1 | P/Inch Dia/Pc. |
44 | 1.43 | Fitting of valves up to 12” dia | T44 | 1 | P/Inch Dia/Pc. |
45 | 1.44 | Dismantling & Erection of worn out Runners of the cane carrier/Inter Carrier/Bagasse carrier and Cross carrier | T45 | 1 | P/Inch Dia/Pc. |
46 | 1.45 | Dismantling/Fabrication & Erection of worn out side plates of cane carrier//Bagasse Elevator/RBC/Main Bagase carrier and Cross carrier | T46 | 1 | P/Inch Dia/Pc. |
47 | 1.46 | Dismantling/Fabrication & Erection of bogacillow pipe & cyclone chimney (with 2mm M.S plates) | T47 | 1 | P/Inch P/Arm |
48 | 1.47 | Dismantling/Fabrication & Erection of S.F. melter | T48 | 1 | P/RM |
49 | 1.48 | Fabrication & Erection of vapor pipe 1100mm dia for condenser/pans from 10mm thick MS plates. | T49 | 1 | L/Sum/Condensor |
50 | 1.49 | Dismantling, Fabrication and Erection of worn out of CL molasses tank & melter tank. | T50 | 1 | L/Sum |
51 | 1.5 | Repair of Juice Sulphiter internal shell, SO2line & Juice line. | T51 | 1 | L/Sum |
52 | 1.51 | Dismantling,Fabrication & Erection of damaged arms of Horizontal crystllizers By M,S strip(spiral type). | T52 | 1 | L/Sum |
53 | 1.52 | Replaced of damaged arms of seed crystllizers. | T53 | 1 | L/Sum |
54 | 1.53 | Dismantling, Fabrication & Erection of Rain Gutter. | T54 | 1 | L/Sum |
55 | 1.54 | Dismantling, Fabrication & Erection of Top plate Dorr clarifier Complete No.3 | T55 | 1 | L/Sum |
56 | 1.55 | Dismantling, Fabrication & Erection of Motor pump bed. | T56 | 1 | L/Sum |
57 | 1.56 | Dismantling & Erection of SS pipe | T57 | 1 | L/Sum |
58 | 1.57 | Dismantling, Fabrication & Erection Pan shall with tapper portion complete in all respect of pan no. 02 & 05 with trial & testing. | T58 | 1 | P/MT |
59 | 1.58 | Dismantling, Fabrication & Erection of Horizontal melter | T59 | 1 | L/Sum |
60 | 1.59 | Dismantling, Fabrication & Erection of hopper partially with all respect & trial/testing . | T60 | 1 | L/Sum |
61 | 1.6 | Fitting of S.S tubes of Pans & Quad body remaining & expanding hydraulic testing etc. | T61 | 1 | per tube |
62 | 1.61 | Partially Dismantling, Fabrication and erection of both semi kestner ducting. | T62 | 1 | P/MT |
63 | 1.62 | Repair of top two segment of Molasses tank No.01,02 & 03 | T63 | 1 | P/MT |
64 | 1.63 | Repair of damaged passes of juice heaters and fitting of 1" sq-bar (grooved) in level with trial & testing. | T64 | 1 | P/MT/P/mtr |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail