Municipal Corporation-MC has published Construction Of Boundary Wall At Bhalukipatala Primary School In Ward No-8 Civil Work. Submission Date for this Tender is 27-05-2021. Wall construction Tenders in KEONJHAR Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Construction of Boundary wall at Bhalukipatala Primary School in Ward No-8. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work excavation in Hard soilon foundation & Plinth including dressing and levelling the bed surface etc.complete and deposit excavated earth duly for work site as per direction of Engineer in charge. | BI01010001010000000000000515BI0100001114 | 144.75 | cum |
2 | 2 | Collecting, supplying fine sand with all cost, conveyance, labour royality taxesT & P etc. all complete with watering ramming as per the direction of Engineer in charge. | 16.59 | cum | |
3 | 3 | P.C.C. (1:3:6) using washed 40cm size hand broken Hard Granite metal using 43 grade cement including all taxes, cost carriage royality taxes of materials labour T & P required, watering curing for the work with etc. complete in all resepct as per direction of Engineer in charge. | 15.94 | cum | |
4 | 4 | Fly Ash Brick Masonary in (1:6) C.M using grade cement including all cost, conveyance, labour, royalty, taxes T & p etc. complete with watering & curing etc complete in all respect as per the direction of Engineer incharge. | 55.34 | cum | |
5 | 5 | SUPER STRUCTURE | 92.84 | cum | |
6 | 6 | R.C.C. M20 using 20mm size Down graded crusher broken Chips using 43 grade cement including all taxes, cost carriage royality taxes of materials labour T & P required with Vibrator, watering curing , centering & shuttering for the work etc. complete in all resepct as per direction of Engineer in charge. | 26.02 | cum | |
7 | 7 | Ccolumn and beam | 27.56 | cum | |
8 | 8 | supplying all materials, labour, T& P for cutting, bending, binding,M.S rods placed in position including tyring grills in position, cost of reinforcement & binding wire 18 to 20 gauge etc all complete as per direction of engineer in charge. | 26.79 | qtl | |
9 | 9 | 12 mm thick cement Plaster in C.M ( 1 :6 ) over brick masonry with after racking out the joints including cost, conveyance to site , royalty , etc. all taxes of all materials & cost of all labour complete . | 640.64 | sqm | |
10 | 10 | 16 mm thick cement Plaster in C.M ( 1 :6 ) over brick masonry with after racking out the joints including cost, conveyance to site , royalty , etc. all taxes of all materials & cost of all labour complete . | 583.44 | sqm | |
11 | 11 | Distempering Two coats to walls including cost of materials & labour etc complete | 640.64 | sqm | |
12 | 12 | Add Display Board and photo copy | 1 | nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail