Repair/Maint Of Water Supply Distribution Pipe Line Rising Main Control Valves Cleaning Of Under Ground Sump And Other Misc Works Of Water Supply In Tech Area At Af Station Halwara, GE (AF) Halwara-Punjab

Military Engineer Services-MES has published Repair/Maint Of Water Supply Distribution Pipe Line Rising Main Control Valves Cleaning Of Under Ground Sump And Other Misc Works Of Water Supply In Tech Area At Af Station Halwara. Submission Date for this Tender is 10-06-2021. Control Valves Tenders in GE (AF) Halwara Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

27905289
Corrigendum : Repair/Maint Of Water Supply Distribution Pipe Line Rising Main Control Valves Cleaning Of Under Ground Sump And Other Misc Works Of Water Supply In Tech Area At Af Station Halwara
Open Tender
Indian
Punjab
GE (AF) Halwara
10-06-2021

Tender Details

Repair/Maint Of Water Supply Distribution Pipe Line Rising Main Control Valves Cleaning Of Under Ground Sump And Other Misc Works Of Water Supply In Tech Area At Af Station Halwara

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-May-2021 Amendment to BOQ BOQ 03-06-2021
2 03-Jun-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 10-06-2021
3 03-Jun-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 10-06-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 79940.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: REPAIR / MAINT OF WATER SUPPLY DISTRIBUTION PIPE LINE, RISING MAIN, CONTROL VALVES, CLEANING OF UNDER GROUND SUMP AND OTHER MISC WORKS OF WATER SUPPLY IN TECH AREA AT AF STN HALWARA
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation in trenches not exc 1.5m wide and not exc 1.5M depth for laying of GI/CI pipe lines etc getting out including forming bottom surface to required level and gradient in soft / loose soil complete all as specified. 975 Cum
2 2 Returning and filling in excavated soil including spreading leveling, watering, well ramming in layers not exc 25 Cm thick complete all as specified. 956 Cum
3 3 Removing of excavated materials not exceeding 50 Mtrs and depositing where directed at a level not exceeding 1.5 Mtrs above the starting point. 19 Cum
4 4 Complete, arrangement , transporting, accessories for carrying out of Chemical Analysis test including Bacteriological Examination of drinking water. The Sample of drinking water for testing shall be taken from follwing locations for further submission to the Lab. The cost of sampling, transportation and testing charges shall be born by the contractor.\n(a) Pump House No 5. (b) Pump House No 10 (c) Pump House SK Range - 03\nAddress of reputed laboratories are given below :-\n(i)The Shriram Institute for Industrial reasearch 19, University road Delhi-7. (ii) Dr Ghuman and Gupta Geotech Consultents Sec 17 A , Chandigarh or F-81 Phase vii , Industrial Focal point Mohali (Punjab). (iii) Water Testing Reasearch Laboratory Hisar Haryana. (iv) AFMC- PUNE (Deptt of PSM,Post Graduate Wing). (v) Delhi Test House A- 62/3 G.T Road Karnal road Azadpur Delhi-33. (vi) Alfa Test House 20 Each Job
5 5 Taking out/burning out of leakage and damaged lead joints in the existing CI mains including removing the old lead carefully with out damaging the pipe complete for 80 mm bore of pipes :- (Note :- Excavation and earth work will be measured and paid separately if repairs required to be carried out for joints only without taking out pipe)\n 20 Each
6 6 All as per Srl item No. 5.00 above but 100 mm bore. 25 Each
7 7 All as per Srl item No. 5.00 above but 150 mm bore. 12 Each
8 8 All as per Srl item No. 5.00 above but 200 mm bore. 3 Each
9 9 Run lead joint including jointing materials such as spun yarn etc complete for the 80 mm bore CI pipe complete all as specified. 20 Each
10 10 All as per Srl item No. 9.00 above but 100 mm bore. 25 Each
11 11 All as per Srl item No. 9.00 above but 150 mm bore. 12 Each
12 12 All as per Srl item No. 9.00 above but 200 mm bore. 3 Each
13 13 M&L for repair to rubber gasket joint for 80mm bore CI pipe including jointing materials complete all as specified (Note :- Excavation and earth work will be measured and paid separately if repair carried out for joint only). 60 Each
14 14 All as per Srl item No. 13.00 above but 100 mm bore. 30 Each
15 15 All as per Srl item No. 13.00 above but 150 mm bore. 5 Each
16 16 All as per Srl item No. 13.00 above but 200 mm bore. 3 Each
17 17 Repairs to 80mm bore sluice valves such as replacement of unsv/warnout gland on stuffing box, rubber gasket of suitable size, filling or grinding to gate, replacement of worn out check nut, cleaning inside gate valve properly and remove scaling and other waste materials, replacement of worn out nut/bolts with washers, including testing of leakage and operation complete all as specified and directed. 25 Each Job
18 18 All as per Srl item No. 17.00 above but 100 mm bore. 10 Each Job
19 19 All as per Srl item No. 17.00 above but 150 mm bore. 8 Each Job
20 20 All as per Srl item No. 17.00 above but 300 mm bore. 4 Each Job
21 21 Disconnecting and removing the unserviceable/wornout spindle from the sluice valve 80 mm dia after opening the nut and bolts and replace the same with new brass spindle of same size , length and turns including necessary fixing arrangements,testing and commissioning complete all as specified and directed. 10 Each Job
22 22 All as per Sl item No 21.00 above but 100mm dia 8 Each Job
23 23 All as per Sl item No 21 above but 150mm dia 7 Each Job
24 24 All as per Sl item No 21 above but 300mm dia 1 Each Job
25 25 S&F Cast iron sluice valve 80mm dia bore both end flanged with brass spindle and cast iron handle wheel,heavy duty , class PN-1.0 ISI marked and fixing with existing pipe line including jointing material nuts,bolts,washers gasket as in replacement complete all as specified. 20 Each
26 26 All as per Srl item No. 25.00 above but 100mm bore. 10 Each
27 27 All as per Srl item No. 25.00 above but 150mm bore. 7 Each
28 28 All as per Srl item No. 25.00 above but 200mm bore. 1 Each
29 29 Taking out existing CI pipe 80mm bore (including all fittings) with spigot and socket ends and lead joints / flange joint including burning out joints and removing lead from the ground cleaning the pipes free from sedimentation/scaling etc for reusing the serviceable pipes complete all as specified. (Note :- Excavation and earth work will be measured and paid separately.)\n 600 RM
30 30 All as per Srl item No. 29.00 above but 100 mm bore. 500 RM
31 31 All as per Srl item No. 29.00 above but 150 mm bore. 100 RM
32 32 Laying only cast iron pipes 80mm dia (Serviceable pipes obtained from dismantling shall be reused in the work). Joints and jointing material shall be measured seperately. 300 RM
33 33 All as per Srl item No. 32.00 above but 100 mm dia. 300 RM
34 34 All as per Srl item No. 32.00 above but 150 mm dia. 50 RM
35 35 M&L for CI pipe of 80mm bore with spiogt and socket ends centrifugally cast class LA suitable for lead joints laid in trenches including necessary cut to length to match the existing fitting/pipes complete all as specified and as directed. 300 RM
36 36 All as per Srl item No. 35.00 above but 100 mm bore. 200 RM
37 37 All as per Srl item No. 35.00 above but 150 mm bore. 50 RM
38 38 Cutting the CI pipe 80mm dia and reducing the required length in positioning for insertion of new CI specials such as Tees/Reducers/Tail pieces/collers/sluice valve/Air release valve etc complete. 2 Each
39 39 All as per Srl item No. 38.00 above but 100 mm bore. 2 Each
40 40 All as per Srl item No. 38.00 above but 150 mm bore. 2 Each
41 41 M&L for CI/GI specials such as bends, tees, collars tail pieces flanges, etc complete suitable for CI/GI mains upto 200 mm sizes complete all as specified and directed 1200 Kg
42 42 M&L for Cast iron double flanged non slam round type non return valve 80mm bore with by pass arrangements ISI marked heavy duty confirming to IS-5312 Part I / 84 of pressure rating PN 1.0 as in replacement complete all as specified. 5 Each
43 43 All as per Srl item No. 42.00 above but 100 mm dia bore 2 Each
44 44 All as per Srl item No. 42.00 above but 150mm dia bore 2 Each
45 45 All as per Srl item No. 42.00 above but 200mm dia bore 1 Each
46 46 S&F cast Iron flanged type foot valve 80 mm bore with drilled flanged end all as per IS : 4038 with Cast Iron Strainer, nuts, bolts, washers etc as in replacement complete all as specified. 2 Each
47 47 S&F cast Iron flanged type foot valve 100 mm bore with drilled flanged end all as per IS : 4038 with Cast Iron Strainer nuts, bolts, washers etc as in replacement complete all as specified and directed 4 Each
48 48 M&L for cast iron detachable joint suitable for 80mm dia bore pipes of CI/GI/PVC Pipe including nuts,bolts and rubber ring etc conforming to IS : 8794 (CL-15) all as specified and directed 10 Each
49 49 All as per Srl item No. 48.00 above but 100 mm bore. 15 Each
50 50 All as per Srl item No. 48.00 above but 150 mm bore. 7 Each
51 51 All as per Srl item No. 48.00 above but 200 mm bore. 1 Each
52 52 Taking up or down steel water GI tubing 15mm dia bore and connections including clearing the pipes free from scaling for reusing the same complete all as specified and directed. 150 RM
53 53 All as per Srl item No. 52.00 above but 20 mm bore. 200 RM
54 54 All as per Srl item No. 52.00 above but 25 mm bore. 300 RM
55 55 All as per Srl item No. 52.00 above but 50mm bore. 800 RM
56 56 All as per Srl item No. 52.00 above but 80 mm bore. 300 RM
57 57 All as per Srl item No. 52.00 above but 100 mm bore. 100 RM
58 58 Laying only steel water tubing GI medium grade 15mm bore with all new fittings such as bend, elbow, socket, nipple, tapers, reducers, unions etc as required, laid in trenches or fixed to wall etc complete all as specified.\nNote :- Serviceable pipes obtained from dismantling shall be re-used in the work. Excavation and earth work will be measured and paid separately. 50 RM
59 59 All as per Srl item No. 58.00 above but 20mm bore. 50 RM
60 60 All as per Srl item No. 58.00 above but 25mm bore. 100 RM
61 61 All as per Srl item No. 58.00 above but 50mm bore. 200 RM
62 62 All as per Srl item No. 58.00 above but 80 mm bore. 100 RM
63 63 All as per Srl item No. 58.00 above but 100 mm bore. 50 RM
64 64 M&L for 15mm bore galvanised steel water tubing, medium grade with necesary fittings/fixtures laid in trenches or fixed to walls/ceilings complete all as specified and directed. \n(Excavation and earth work will be measured and paid separately). 100 RM
65 65 All as per Srl item No. 64.00 above but 20mm bore. 150 RM
66 66 All as per Srl item No. 64.00 above but 25mm bore. 200 RM
67 67 All as per Srl item No. 64.00 above but 50mm bore. 600 RM
68 68 All as per Srl item No. 64.00 above but 80mm bore. 200 RM
69 69 All as per Srl item No. 64.00 above but 100 mm bore. 50 RM
70 70 Taking up or down 150mm dia existing centrifugally cast (spun) ductile iron pressure pipes for water with socket and spigot ends suitable for rubber gasket pushon joining complete all as specified and directed. 300 RM
71 71 Supply and laying 150mm dia centrifugally cast (spun) ductile iron pressure pipes for water with socket and spitot ends suitable for rubber gasket pushon joining confirming to IS 8329:2000 having inside cement mortar lining and outside zine coating with finishing layer of blue epoxy in standard length, classification K-9 in standard length of 5.50/6.0 mtrs including push on joints with cement mortar lining complete all as specified and directed. 204 RM
72 72 All as per Srl item No. 71.00 above but laying only. (Note : Serviceable pipes obtained from Sl item No 70 above shall be reused in the work). 96 RM
73 73 S&F in repairs 15mm dia bore Gun metal gate valve with iron wheel head screwed both ends for iron pipes and fixed complete all as specified and directed. 40 Each
74 74 All as per Srl item No. 73.00 above but 20mm bore. 30 Each
75 75 All as per Srl item No. 73.00 above but 25mm bore. 30 Each
76 76 All as per Srl item No. 73.00 above but 40mm bore. 30 Each
77 77 All as per Srl item No. 73.00 above but 50mm bore. 15 Each
78 78 S&F in repairs 15 mm bore Stop valve, cast copper alloy,screwed down high pressure with crutch or butterfly handle screwed both ends complete suitable for the of pipe complete all as specified and directed. 5 Each
79 79 All as per Srl item No. 78.00 above but 20 mm bore of pipe 6 Each
80 80 All as per Srl item No. 78.00 above but 25 mm bore of pipe 8 Each
81 81 Dismantling the water mains from the delivery lines, lifting/taking up GI/UPVC Column pipes, pumping sets including submersible cable after disconnecting pumping sets of capacity 20 HP to 50 HP from cable, repairs to the defective submersible cable and jointing of submersible cable by using water proofing jointing kit, transporting the pumpset to civil workshop and back to site after repairs, replacement of defective column pipes, and including Lowering of submersible pump Sets, submersible cable, column pipes, reonnecting main delivery mains as existing and testing for satisfactory running and continuous flow of water etc complete all as directed by Engineer in charge at bore wells at various location in domestic area. Note :- Repair to Motor & Pumping sets shall be measured and paid seperately. Column pipes as required for replacement shall be measured under relevant item of schedule 6 Each Job
82 82 Dismantaling the submersible pumpset of capacity 20 HP to 50 HP for servicing/repairs, replacement of defective parts, reassembling the motor properly and testing for satisfactory running, working with continuous flow of water etc including replacement of unserviceable suitable MS stud with nuts complete all as specified and directed. Note : Spare parts will be measured and paid under relevant item of schedule 4 Each Job
83 83 Rewinding the motor of capacity upto 20-25 HP using required SWG of PVC insulated copper wire, making winding leak proof with superior quality insulating materials, properly jointing terminals with submersible cable, etc complete all as directed by Engineer-in-charge. 4 Each Job
84 84 Part of Submersible pumpset of capacity 20 HP to 25 HP\nSupply only gun metal impeller for 12 Each
85 85 Supply only CI stage bowl 8 Each
86 86 Supply only Brass neck ring 10 Each
87 87 Supply onlyThrust pad 6 Each
88 88 Supply only Distance sleeve 4 Each
89 89 Supply only Motor bush 8 Each
90 90 Supply only Sealing kit 8 Each
91 91 Supply only Thrust plate 4 Each
92 92 Supply only Pump coupling stainless steel with key 8 Each
93 93 Supply only Sand guard 4 Each
94 94 Supply only Stud & Nut 100 Each
95 95 Dismantling the water mains from the delivery lines, lifting/taking up GI/UPVC Column pipes, pumping sets including submersible cable after disconnecting pumping sets 0.5 to 7.5 HP from cable, repairs to the defective submersible cable and jointing of submersible cable by using water proofing jointing kit, transporting the pumpset to civil workshop and back to site after repairs, replacement of defective column pipes, and including Lowering of submersible pump Sets, submersible cable, column pipes, reonnecting main delivery mains as existing and testing for satisfactory running and continuous flow of water etc complete all as directed by Engineer in charge at bore wells at various location in domestic area. Note: Repair to Motor & Pumping sets shall be measured and paid seperately. Column pipes required for replacement shall be measured under relevant item of schedule. 35 Each Job
96 96 Dismantaling the submersible pumpset of capacity 0.5 HP to 7.5 HP for servicing/repairs, replacement of defective parts, reassembling the motor properly and testing for satisfactory running, working with continuous flow of water etc including replacement of unserviceable suitable MS stud with nuts complete all as specified and directed. Note : Spare parts will be measured and paid under relevant item of schedule 35 Each Job
97 97 Rewinding the submersible motor of capacity 0.5 to 3 HP motor using required SWG of PVC insulated copper wire, making winding leak proof with superior quality insulating materials, properly jointing terminals with submersible cable, etc complete all as directed by Engineer-in-charge. 19 Each Job
98 98 All as per Sl item No 97 here-in-before but capacity 7.5 HP 16 Each Job
99 99 Part of Submersible pumpset of capacity 0.5 HP to 7.5 HP\nSupply only Gun metal impeller 20 Each
100 100 Supply only Stainless steel shaft 18 Each
101 101 Supply only Thrust pad 27 Each
102 102 Supply only Distance sleeve 14 Each
103 103 Supply only Motor bush 33 Each
104 104 Supply only Pump coupling stainless steel with key 30 Each
105 105 MS column pipe medium grade of size 100mm dia 10' long flanged both ends and slot made for submersible cable as in replacement complete all as specified and directed. 4 Each
106 106 Opening and disconnecting centrifugal pump from electric motor 20 HP capacity, including shifting, transportation, overhauling shaft metering, welding , brazing and grinding the shaft and replacing of worn out parts and re-assembling and connecting it to the electric motor complete all as directed by EIC. \nNote : (i) The unit rate shall include for minor spares such as bolts, nuts washers, oil seal, gasket, greasing etc as required.\n(ii) Major spares as required shall be measured and paid for separately. 1 Each Job
107 107 All as per Srl item No. 106.00 above but 5 to 12.5 HP 12 Each Job
108 108 All as per Srl item No. 106.00 above but 0.5 to 3.00 HP including booster motor 2 Each Job
109 109 Rewinding of electric motor of capacity 5 HP for centrifugal non clog pumping set with supper enameled copper winding wire of existing gauge, size and weight with insulating material complete all as specified and directed. 8 Each Job
110 110 All as per item No 109.00 above but for but 12.5 HP 6 Each Job
111 111 All as per item No 109.00 above but 20 HP 1 Each Job
112 112 Coupling with rubber bush and coupling nuts & bolts for 30 HP non clog pumping set complete 1 Each
113 113 Parts of electric motor 20 HP\nSupply only Impeller GM 1 Each
114 114 Supply only Gland box 1 Each
115 115 Supply only Ball bearing for 20 HP non clog pumping set 1 Each
116 116 Supply only Ball bearing of electric motor upto 12.5 HP 6 Each
117 117 Supply only Gun metal bushes of pump upto 12.5HP 6 Each
118 118 Supply only MS coupling of pump upto 12.5 HP 6 Each
119 119 Supply only Ball bearing of electric motor upto 5 HP 8 Each
120 120 Supply only Gun metal bushes of pump upto 5 HP capacity 8 Each
121 121 Supply only Rubber coupling of pump upto 5 HP 8 Each
122 122 S&F Butterfly valve of size 150 mm dia as in replacement. 2 Each
123 123 S&F Butterfly valve of size 80 mm dia as in replacement. 2 Each
124 124 S&F in replacement single phase Preventor, Model VSP- D2-L&T/Telemechanic 10 Each
125 125 S&F shunt capacitor suitable for motor upto 25 HP capacity 10 Each
126 126 Hand Wheel for Actuator suitable for 200mm/150mm/100mm/ 80mm dia Butterfly Valve as in replacement. 4 Each
127 127 Fully automatic star delta starter of range 17-24 relay rating, 3 phase, 415 volt, in sheet metal enclosure 50 Hz, complete suitable for 20 to 25 HP capacity submersible pump set including dismantling, disconnecting as in replacement complete all as specified. 2 Each
128 128 Fully automatic Auto start Direct on Line starter in SS (stainless Steel) enclosure with 230-400 V Coil Overload relay range 3.8/6.0 A Back up Fuse (A)20 Suitable for Submersible motor capacity upto 3.00 HP as in replacement complete all specified. 20 Each
129 129 Fully Automatic Citation Star Delta Starter in SS (stainless Steel) enclosure with 230-400 V Coil Overload relay range 6.0/9.3/3.8 A Back up Fuse (A)25 Suitable for Submersible motor capacity 7.5 HP as in replacement complete all specified. 16 Each
130 130 Fully automatic Auto start Direct on Line starter in SS (stainless Steel) enclosure 8.9-13.5 A with 230-400 V Coil Overload relay suitable for CF Pump upto 10.00 HP as in replacement complete all as specified and directed. 12 Each
131 131 Fully automatic Auto start Direct on Line starter in SS (stainless Steel) enclosure 6.00-9.3 A with 230-400 V Coil Overload relay suitable for CF Pump upto 20.00 HP as in replacement complete all as specified and directed. 1 Each
132 132 S&F in replacement single phase 1.5 HP relay 8.9-13.5 contactor rating 16 Amp SPS with 2P contactyor+overload relay (Ammeter+voltmeter) wiogh 160-220V AC coil. 10 Each
133 133 Supply only 2.5 sqmm single core cable life line plus S3 yellow HRFR PVC flexible cable 200 RM
134 134 S&F isolator single pole 32 Amp as in replacement 10 Each
135 135 S&F MCB SPM 6 to 40 Amp, 415V including all terminals fittings as in replacement. 30 Each
136 136 S&F in replacement, single core PVC insulated unsheathed stranded copper FT conductor of size 6 sqmm 1100 volt grade confirming to IS 694-1990 complete all as specified and directed. 100 RM
137 137 All as per item No 136.00 above but 10Sq mm. 100 RM
138 138 All as per item No 136.00 above but 16Sq mm. 100 RM
139 139 S&F First Aid chart with clear glass cover & wooden frame of size as directed by Engr-in-Charge complete all as specified and directed. 5 Each
140 140 All as per Sl item No 139 above but shock treatement chart. 5 Each
141 141 Supply Only First Aid Kit box No-08 (Size : 360 mm x 150 mm x 80 mm) containing following items :-\n(a) Dettols bottle100 ml 02 bottles\n(b)Antiseptic Ointment 100 mg\n© Crocin tabletes 01 strips ( containings 10 Tablets each).\n(d) Hydrogen peroxide 50 ml 01 bottle \n(e) Cotten small rolls 2 Nos\n(f) Cotten strip small roll 04 Nos\n(g)Moove tube 01 Nos\n(h) Betadine Tube 100 mg 5 Each
142 142 Supply only orthotodoline solution for chlorine test in 500 ML bottle. 30 Bottle
143 143 Supply only Chlorine gas test kit up to 2 PPM. Make : Pearl Filter/RMCO\n 5 Each
144 144 S&F Submersible Cable 2.5Sq mm flat Three Core PVC Insulated & PVC Sheathed copper conductor 1100 Volts for Submersible Pump Moter complete all as specified and directed. 500 RM
145 145 All as per item No 144 here-in-before for but 4Sq mm. 200 RM
146 146 All as per item No 144 here-in-before for but 6Sq mm. 200 RM
147 147 All as per item No 144 here-in-before for but 10Sq mm. 100 RM
148 148 All as per item No 144 here-in-before for but 16Sq mm. 100 RM
149 149 All as per item No 144 here-in-before for but 25Sq mm. 100 RM
150 150 Cleaning the OH RCC tank 25000 gallons capacity of 40 feet staging at Pump house No-05 Tech area removing the mud, silt, sand, foreign particles, ulgi etc from inside the tank, washing the walls, floor and roof from inside the tank including all pipes and applying two coats of lime inside of the tank complete. 1 Each Job
151 151 All as per item No 150 above but 25000 Gallons at 40 ft staging at pump house -10 Near Transmitter. 1 Each Job
152 152 All as per item No 150 above but semi under ground sumps 20000 Gallons 20 feet deep in tech area pump house -5 &10 2 Each Job
153 153 Dismantling of electrical connection of submersible pump 7.5 HP installed in blast pens and taking out from base for Cleaning the under ground tank 2500 Ltr capacity of 10 feet deep, cleaning of UG tank by removing the mud, silt, sand, foreign particles, algue etc from inside the tank, complete and re-installed in origional position make electrical connection to make serviceable. 24 Each Job
154 154 All as per item No 153 above but 1500 Ltr 4 Each Job
155 155 Supply and fix in replacement calcium based chlorination dosing pump and agitator system ( Make Declibage ) installed water supply installations at different location in Domestic area including testing complete all as specified and directed by Eng in Charge. 2 Each Job
156 156 Supply only Calsium based hypochlorite (65%-70% Calsium based white to off white free flowing solid granular chlorination chemical) in 45 Kg packing complete. 690 Kg
157 157 Mechanical drilling for main bore well 125 mm dia below ground level upto a depth of 100 mtr in any kind of soil complete including compressing the following :-\n(a) M&L Column pipe PVC 100 mm dia heavy duty grade for casing of bore well complete including all fittings-100 RM.\n(b) Supply installation,testing and commissioning of submersible pump set 3 HP single phase 240 volts 50 HZ outer dia of pump set 40 mm and including suitable size of starter-01 Each.\n(c) S &F PVC insulated copper conductor flat type submersible cable 4 sqmm 3 core 1100 volt grade including clip for fixing of cable -55 RM.\n(d)S & F GI pipe medium grade size 40 mm dia including long size of socket- 50RM\n(e) S & F NR valve size 40 mm dia Each = 01. \n(f) S & F gunmetal gate valve of size 40 mm dia each=01 Make;-Bir/Shakti. \n(g) MCB SPN 40 Amp-01 No. 3 Each Job
158 158 S & F Ammeter 25 A for three phase submersible pump starter 6 Each
159 159 S & F Ammeter 50 A for three phase submersible pump starter 6 Each
160 160 S & F volt meter 0-500 volts for three phase submersible pump starter 6 Each
161 161 S & F volt meter 0-300 volts for three phase submersible pump starter 6 Each
162 162 Supply and fix in replacement of battery 150 AH 2 Each
163 163 S & F in replacement MCCB 4 Pole 100A breaking capacity ICU at 415 (50KA) 1 Each
164 164 S & F in replacement MCCB 4 Pole 250A breaking capacity ICU at 415 (50KA) 1 Each
165 165 S & F in replacement MCCB 4 Pole 200A breaking capacity ICU at 415 (50KA) 1 Each
166 166 S & F in replacement MCCB 4 Pole 160A breaking capacity ICU at 415 (36KA) 1 Each
167 167 S & F in replacement MCCB 3 Pole 100A breaking capacity ICU at 415 (36KA) 1 Each
168 168 S & F in replacement MCCB 3 Pole 63A breaking capacity ICU at 415 (36KA) 1 Each
169 169 S & F in replacement off load change over switch AC-21 200 Amp side handle in sheet encloser, 415 V AC, 50 Hz 1 Each
170 170 S & F in replacement off load change over switch 100A AC-23 side handle in sheet encloser, 415 V AC, 50 Hz 1 Each
171 171 S & F in replacement off load change over switch AC-21 400 Amp side handle in sheet encloser, 415 V AC, 50 Hz 1 Each
172 172 S & F power contractor 3 pole AC control AC-3 rating 32 Amps (20 HP/15KW) 415 volts including Aux contact 1 No + NC with colil voltage 380/415 volts 1 Each
173 173 S & F power contractor 3 pole AC control AC-3 rating 40 Amps (20 HP/15KW) 415 volts including Aux contact 1 No + NC with colil voltage 380/415 volts 1 Each
174 174 S & F power contractor 3 pole AC control AC-3 rating 63 Amps (50 HP) 415 volts including Aux contact 1 No + NC with colil voltage 380/415 volts 1 Each
175 175 S & F Electronic timer for three phase submersible pump starter 4 Each
176 176 S&F in replacement PVC (Heavy duty) electric cable with copper conductor 1100 volts cross section 6 Sqmm 3 core 100 RM
177 177 M&L for boring under road/path/hardstanding to pass the lines upto 150mm dia bore with mechanical arrangements complete all as specified and directed. 30 RM
178 178 Cleaning of underground static water tanks of approx capacity upto 20000 gallons after dewatering the tank using diesel engine pump set and cleaning with steel wire brushes to remove mud, silt, sand, foreign particles, ulge etc from inside the tank, washing the walls and floor with bleaching powder solution and applying one coat of white wash inside of the tank including wiriting date of cleaning with white colour over black base using synthetic enamel paint complete all as specified and directed by Engr-in-Charge.\nNote : Sludge/waste material shall be disposed off and thrown away from SWT in low lying area as directed by Engr-in-Charge. 50 Each Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail