Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Mtps Ii Chp Ii Routine Preventive Maintenance Works In Conveyors Stacker Cum Reclaimers Conveyor 8A 8B 10A 10B 11A 11B 12A 12B 13A 13B Ttr 1 And 2 Flap Gates Rbf And Ilms 7 8 In Jt Etc. Submission Date for this Tender is 26-05-2021. Conveyors and Accessories Tenders in MTPS II METTUR DAM Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: MTPS-II-CHP-II- Routine/Preventive Maintenance works in Conveyors and Stacker cum Reclaimers- Conveyor-8A, 8B, 10A,10B, 11A, 11B, 12A, 12B, 13A, 13B, TTR-1 & 2 Flap Gates-9,10,11,12,13,14,15,16,17 RBF-8,9,10,11,12, 13, 14, 15, 16 and ILMS-7,8 in JT-5,4,3,2,1,Bunker Top, SCR-1&II and Conveyor-7/1&7/2, Conveyor - 9/1,9/2 in SCR-I & II for a period of 83 days from the date of commencement of work. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Charges for cleaning of spillage coal/Coal Dust/scatterd coal/ slurry coal etc, from Conveyor-8A, 8B, 10A,10B, 11A, 11B, 12A, 12B, 13A, 13B, TTR-1 & 2 Flap Gates-9,10,11,12,13,14,15,16,17 RBF-8,9,10,11,12, 13, 14, 15, 16 and ILMS-7,8 in JT-5,4,3,2,1 and Bunker Top | Item1 | 83 | Days |
2 | 2 | Charges for clearing the spillage coal/Coal Dust/scatterd coal/ slurry coal etc, powder and chocked coal in the walkway, decking sheets area and rails area in coal yard Conv-7/1&7/2, 9/1, 9/2 and all equipments in SCR Machines including Both Drive ends of Conv-7/1&7/2 | Item2 | 83 | Days |
3 | 3 | Charges for checking of oil level, oil topping in gear box, inspection and cleaning of breather in gear box of coal handling Conveyor-8A, 8B, 10A,10B, 11A, 11B, 12A, 12B, 13A, 13B, TTR-1 & 2 Flap Gates-9,10,11,12,13,14,15,16,17 RBF-8,9,10,11,12, 13, 14, 15, 16, ILMS-7,8 , JT-5,4,3,2,1, Bunker Top,SCR-1&II and Conveyor-7/1&7/2, Conveyor - 9/1,9/2 in SCR-I & II and fortnightly | Item3 | 95 | Nos. |
4 | 4 | Charges for greasing of all pillow block bearings checking of oil level and oil topping in fluid coupling, checking of tightness of bolts & nuts, checking and adjusting scrapper and skirt rubber and replacement of scrapper and skirt rubber if necessary in Conveyor -8A, 8B, 10A,10B, 11A, 11B, 12A, 12B, 13A, 13B, TTR-1 & 2 Flap Gates-9,10,11,12,13,14,15,16,17 RBF-8,9,10,11,12, 13, 14, 15, 16 , ILMS-7,8, Bunker Top,SCR-1&II and Conveyor-7/1&7/2, Conveyor - 9/1,9/2 in SCR-I & II , JT-5,4,3,2,1 and fortnightly | Item4 | 12 | Nos. |
5 | 5 | Charges for removing the existing fixed type carrying idler /Impact idler from the stand, transporting the new idler from CS/MTPS-II and pocket store to conveyors and assembling new idler of size 159.3 mm dia. x 465, 193.7 mm dia x 465mm, 159.3 mm dia. x 465 mm and 193.7mm dia. x 465mm,Guide Roller Dia. 75 mm, barrel length 150mm,50mm length M16 bolt& nut on one side Dia. 153mm x 465 mm long for 1200 mm width Dia. 139.7mm x 665 mm long for 1200 mm width conveyor belt. Dia. 114.3mm x 465 mm long for 1200 mm width conveyor belt. | Item6 | 40 | Nos. |
6 | 6 | Charges for removing the existing return idler of size Dia. 152.4 mm x 1400 mm long for 1200 mm, Dia. 152.4 mm x 2000 mm long for 1800 mm long from the stand, Dia. 139.7 mm x 700 mm long for 1200 Dia. 152.4 mm x 2000 mm long for 1800 mm rom the stand, transporting the new idler from CS/MTPS-II and pocket store to conveyors assembling new idlers and transporting the new idler from pocket store to conveyors assembling new idlers. | Item7 | 35 | Nos. |
7 | 7 | Labour charges for petty welding works of skirt board mother plate and chute patch work in Conveyor-8A, 8B, 10A,10B, 11A, 11B, 12A, 12B, 13A, 13B, TTR-1 & 2 Flap Gates-9,10,11,12,13,14,15,16,17 RBF-8,9,10,11,12, 13, 14, 15 and 16 in JT-5,4,3,2,1 Bunker Top , Conveyor-7/1&7/2, Conveyor - 9/1,9/2 in SCR-I & II inclduing cost of T&P | Item8 | 400 | kgs |
8 | 8 | Charges for removing the existing garland idlers sets from the stand, transporting, loading the new/reconditioned idlers the new idler from CS/MTPS-II /& pocket stores to the conveyor 7, Conveyor -9 Boom Conveyor, IMC Coveyor stretch, removing U clamp, pin and plates and assembling the new reconditioned idlers as set and re-fixing the new assembled set in the appropriate place in conveyor 7, Conveyor-9 and transporting the defective worn out idlers from coal yard to the specified location as directed by the Engineer in-charge (idler fixing pins, plates and U clamp will be provided by TANGEDCO at free of cost). | Item9 | 20 | Nos. |
9 | 9 | Charges for dismantling of DE&DS System pipe flanges of various sizes of dia at various elevations in A and B stream of JT-5,4,3,2,1 and Bunker Top and cleaning the choke manually by using the man holes provided and re erection of all pipe flanges complete. | Item10 | 50 | Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail