}

Manning And Operation For Sewage Treatment Plant / Ro Plants And Maintenance Of Stp In The Area Of The Age E/M Hospital Under Ge E/M Lucknow, Lucknow-Uttar Pradesh

Military Engineer Services-MES has published Manning And Operation For Sewage Treatment Plant / Ro Plants And Maintenance Of Stp In The Area Of The Age E/M Hospital Under Ge E/M Lucknow. Submission Date for this Tender is 05-06-2021. Sewage Treatment Plant Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27869915
Corrigendum : Manning And Operation For Sewage Treatment Plant / Ro Plants And Maintenance Of Stp In The Area Of The Age E/M Hospital Under Ge E/M Lucknow
Open Tender
Indian
Uttar Pradesh
Lucknow
05-06-2021

Tender Details

Manning And Operation For Sewage Treatment Plant / Ro Plants And Maintenance Of Stp In The Area Of The Age E/M Hospital Under Ge E/M Lucknow

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-May-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 05-06-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 83580.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : MANNING AND OPERATION FOR SEWAGE TREATMENT PLANT / RO PLANTS AND MAINTENANCE OF STP IN THE AREA OF THE AGE E/M HOSPITAL UNDER GE E/M LUCKNOW.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing service for uninterrupted " Maintenance and Operation " of sewage treatment plant installation of various capacities Non Clogging Sewage pump, Air Blower, DG set, & All control system related STP Plant etc by deploying operator (semi skilled ) adequately qualified, in each installation one ( STP Operator ) for each shift of 8 ( eight ) hours for two shift at each installation to maintain effluent quality in SUMMER, MONSOON and WINTER season including on Sundays & holidays to achieve desired serviceability and other conditions thorough out the period , complete all as specified and directed by Engineer-in -Charge at the following locations :- \n(a) Sanjog Chatri Vihar STP 0.8 MLD ( Two Shift ) \n(b) Nirbhay Vihar STP 0.5 MLD ( Two Shift) \n(c) Gaur Enclave STP 0.2 MLD ( Two Shift ) \n(d ) Rajiv Sandhu Vihar STP 0.5 MLD ( Two Shift ) \nNote :Total man power 08 Nos operator for 04 STP, one operator in each shift (in two shift) . \n 2672 Per\n Shift
2 2 Providing service for unintrerrupted " Mainntanance and Operation " of RO Plant at dialysis center comprising of Feed water pump - 02 Nos, Multi Grade filter - 01 Nos , Activate carbon filter - 01 No, Mixed bed plant - 01 No , at Comand Hospital ( CC ) Lucknow by deploying one operator ( skilled ) adequately qualified for one shift of 8 ( eight ) hours including Sundays and Holidays including minor repair / maintenance and carrying, complete all as specified and directed by Engineer-in -Charge at the following location :- \n RO Plant installation for Dialysis Center CH ( CC ) \n(a) Hardness test by Easy Test Kit for the softner plant . (b) Depending on condition of RO Mmbranes , cleaning of the same shall be taken up (c) Cleaning of the distribution loop and cleaning / sanitization of the RO water storage tank shall be taken up every one month interval \n(d) Regenaration of the softner plant shall be done 12 times in a month .\n(e) Regenaration of the mixed bed plant shall be done 3 times in a month . Diallysis all as specified and directed at the following location :- RO plant installation for Diallysis centre CH(CC).\n Note :- ( i ) Total man power 01 FGM (shift timing dicided by Engineer-in-Charge (During any breakdoun of plant operater and contractor shall be available at the site till repair and re start the plant as required.) 334 Per\n Shift
3 2.01 Note No Item No 1 & 2:- Rate is included for the following item:-\n(a) Contractor shall provided necessary T&P for General maintenance and operation,\n(b) Contractor shall provided Dress, Shoe with Name plate, Mobile connection, etc\n(c) Contractor shall provided Log book/ Attendance Register/ plant running record book\n(d)Cleaning / cutting tree/grass/bushes etc all surrounding area of STP plants.\n(e) All plant and machinery, eqpt other items belongings to plants including safety responsibility of Employed Manpower and contractor. all as per direction by Engineer-in-Charge.
4 2.02 Notes contd/---\n(f) The rate quoted for items of outsourcing shall not be less than minimum wages as notified byGovernment of India/ concerned State Government/ Local Body, whichever is higher and also not less than applicable rates for contribution of employee towards Employees Provident Fund (EPF),contribution towards Employees State Insurance Corporation (ESIC), contribution of Bonus and Labour Welfare Cess (LWC) as applicable under respective headings/ sub-items. In case the rates quoted are less than the prevailing rates, the bid will be treated as Non-Bonafide/Invalid, shall be disqualified and such bids will not be considered for acceptance. In such case, the lowest bidder shall be determined from amongst the valid/ bonafide bids only. The tender will be considered for financial evaluation only if the rates in Item No. 1 and 2 is found bonafied.\n(g) The GST is included in the rates quoted against all items.\n(h) Contractor is required to quote only upto two digits after decimal place (as per IS No. 2 : 1960) or otherwise it will be considered by rounding off to two digits after decimal place. (j) The tradesmen employed for Item No. 1 and 2 shall be ITI qualified in the trade of Fitter/Mechanic/Electrician or must be in possesion of equivalent army qualification.
5 2.03 Notes contd/---\n(k) Contractor will not be allowed to execute the work by subletting or through power of attorney holder on his behalf to a third party/ another firm except sons/ daughters of proprietor/ partner/ Director and firm’s own employees, Director, Project Manager. This shall be subject to certain conditions, which will be prescribed in the NOT forming part of the tender documents.\n(xvi) Prior to commencement of electrical work/electrical component of works and other works as mentioned in BOQ, copy of valid Electrical License in the name of the contractor or copy of agreement with agency having valid Electrical License alongwith Agency’s Electrical License shall be submitted by the contractor to the Accepting Officer. In case contractor does not possess valid Electrical License and he intends to get such work executed through agency having valid Electrical License and with whom he has agreement prior approval of such agency shall be got done from HQ CWE Lucknow. Copy of License shall be kept on record by GE/AGE for further reference. \n(xvii) In addition, Supervisor for execution of electrical works/electrical component of works employed by the contractor shall possess Supervisor Certificate of Competency issued by concerned State Govt/Union Territory and the worker/tradesmen for execution of electrical works/electrical component of works shall hold necessary Permit issued by concerned State Govt/Union Territory.\n(xviii) Reference of Electrical License and details of Supervisor’s Certificate of Competency and permit of tradesman employed for execution of electrical work/electrical component of works shall be duly incorporated in the Works Diary and relevant site documents respectively for the whole period during which such works is executed.\n(xix) If the contractor fail to submit the License/permit necessary action as deemed fit shall be taken against the contractor.\n
6 3 Overhauling, giling, Greasing and servicing of Air blower of any capacity by opening of all parts, suction air filter, bush, bearing, rotor, drum, bearing of motor shaft, Neck ring, coupling with studs between motor & air blower, & all other parts and re-assemble the same after greasing, oiling, complete all as specified and directed by Engineer-in -charge. \nNOTES : - \n(i) Overhauling and servicing of Air blower should be carried out by Auth company or dealer which is specialist of above .\n(ii) Spares/parts renewed shall be measured and paid separately under appropriate items as supply only. 8 Each Job
7 4 Taking out / dismantling of Air blower pump set of rating 3 phase 440 Volts supply of capacity upto12.5 HP from STP plant at any location and shifting the same to contractor's workshop for repair and re-installation/refixing the same at its original site and testing, complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n (i) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\n(ii) Labour for assembling of old/serviceable and new parts to make the Air blower in serviceable condition shall be included under appropriate item here in after. \n(iii) Spare/parts renewed shall be measured and paid separately under appropriate items here in after. 1 Each Job
8 4.01 Cutting out the existing winding of the motor, opening of winding, and rewinding with super enamelled copper winding wire of best quality of existing size/gauge and weight including replacement of insulation material, varnish, bearing, connection plate and all other petty items required to make motor functional and re-assembling the motor including installation commission and testing on full load , complete all as specified and directed by Engineer-in -Charge. \nNote :Old dismantled winding wire will be contractor property for which credit has been considered under schedule of credit. \nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK. 1 Each Job
9 4.02 Repairing of pump by re-threading of worn out studs holes and supply and fixing over size studs with nut and washer, complete all as specified and directed by Engineer-in -Charge. 1 Each Job
10 4.03 Repairing of pump shaft by depositing metal on it by breazing, grinding and polishing to appropriate size of the shaft, complete all as specified and directed by Engineer-in -Charge. 1 Each Job
11 4.04 Supply and fixing of gun metal / stainless steel bush of pump shaft, complete all as specified and directed by Engineer-in - Charge. 1 Each
12 4.05 Supply and fixing of driven end bearing of blower shaft, complete all as specified and directed by Engineer-in -Charge. 1 Each
13 4.06 Supply and fixing of end bearing of blower shaft , complete all as specified and directed by Engineer-in -Charge. 1 Each
14 4.07 Supply and fixing of gland and packing , complete all as specified and directed by Engineer-in -Charge. 1 Each Job
15 4.08 Supply and fixing of coupling with studs between motor & air blower , complete all as specified and directed by Engineer-in -Charge. 1 Each Job
16 4.09 Supply and fixing of suction air filter, complete all as specified and directed by Engineer-in -charge. 1 Each Job
17 4.1 Supply and fixing of suction silencer, complete all as specified and directed by Engineer-in -Charge. 1 Each Job
18 4.11 Supply and fixing of Neck ring, complete all as specified and directed by Engineer-in -Charge. 1 Each
19 4.12 Supply and fixing of bearing of motor shaft, complete all as specified and directed by Engineer-in -Charge. 1 Each
20 5 Taking out /dismantling of Air blower pump set of rating 3 phase 440 Volts supply of capacity upto 7.5 HP from STP plant at any location and shifting the same to contractor's workshop for repair and re-installation/refixing the same at its original site and testing ,complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n(i) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\n(ii) Labour for assembling of old/serviceable and new parts to make the Air blower in serviceable condition shall be included under appropriate item here in after. \n(iii) Spare/parts renewed shall be measured and paid separately under appropriate items here in after. 2 Each Job
21 5.01 Cutting out the existing winding of the motor, opening of winding, and rewinding with super enamelled water proof copper winding wire of best quality of existing size/gauge and weight including replacement of insulation material, varnish, bearing, connection plate and all other petty items required to make motor functional and re-assembling the motor including installation commission and testing on full load , complete all as specified and directed by Engineer-in -Charge. \nNote :Old dismantled winding wire will be contractor property for which credit has been considered under schedule of credit. \nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK or any other equivalent make as approved by GE/Engineer-in -Charge. 2 Each Job
22 6 Taking out /dismantling of Air blower pump set of rating 3 phase 440 Volts supply of capacity upto 5 HP from STP plant at any location and shifting the same to contractor's workshop for repair and re-installation/refixing the same at its original site and testing ,complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n(i) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against the above items.\n(ii) Labour for assembling of old/serviceable and new parts to make the Air blower in serviceable condition shall be included under appropriate item. \n(iii) Spare/parts renewed shall be measured and paid separately under appropriate items. 1 Each Job
23 6.01 Cutting out the existing winding of the motor, 5/7.5 HP opening of winding, and rewinding with super enamelled copper winding wire of best quality of existing size/gauge and weight including replacement of insulation material, varnish, bearing, connection plate and all other petty items required to make motor functional and re-assembling the motor including installation commission and testing on full load , complete all as specified and directed by Engineer-in -Charge. \nNote :Old dismantled winding wire will be contractor property for which credit has been considered under schedule of credit. \nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK or any other equivalent make as approved by GE/Engineer-in -Charge. 4 Each Job
24 7 Taking out unserviceable non clog submersible type raw effluent sewage lifting Submersible pump set of capacity upto 10 HP of rating 3 phase 440 Volts, from raw sewage collection sump/well of STP plant well upto 18 metre depth at any location in cantt area lucknow, for cleaning of muds, overhauling, Oiling, Greasing and servicing by Opening of all parts, bush, bearing, rotor, drum, bearing of motor shaft, Neck ring, coupling with studs between motor & all other parts and re-assemble the same after greasing , oiling of and shifting the same to authorised workshop for repair , testing and re-installation/Re-fixing/lowering in the sewage sump , complete all as specified and directed by Engineer-in -Charge. \nNotes : - (i) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\n(ii) Parts renewed shall be measured and paid separately under appropriate items here in after. \n(iii) Overhauling and servicing of non clog submersible Pump should be carried out by Auth company or dealer Which is specialist of above here in after. 12 Each Job
25 8 Attend the day to day complaint of non functing part to Air Blower , Air Blower Motor ,non clog submersible Pump, motor ,complete all as specified and directed by Engineer-in -Charge. \nNotes : \n(i) Parts renewed shall be measured and paid separately under appropriate items.\n(ii) Complaint Should be attend immediately within two hrs & Rectified the same day at the earliest without effecting of service . 60 Each Job
26 9 Attend the day to day sewage complaint related leakege , choke , replacement of any part , with cutting ,jointing and any other work of GI Pipe ,MS Pipe , PVC Pipe for any size ,type ,capacity and any location rectified the same , complete all as specified and directed by Engineer-in -Charge. \nNotes : \n(i) Parts renewed shall be measured and paid separately under appropriate items.\n(ii) Complaint Should be attend immediately within two hrs & Rectified the same day at the earliest without effecting of service . 60 Each Job
27 10 Attend the day to day Electric complaint related to MCB DB ,Panel Board, DG set ,Electric cable ,Switch socket & other Electric connection of any size ,type ,capacity and all connected parts , complete all as specified and directed by Engineer-in -Charge. \nNotes : \n(i) Parts renewed shall be measured and paid separately under appropriate items.\n(ii) Complaint Should be attend immediately within two hrs & Rectified the same day at the earliest without effecting of service . 60 Each Job
28 11 Taking out the silt & foreign object , cleaning & removing sludge from course bar screen including all chamber of equilasation tank upto depth of 15 Metre of any capacity of STP, complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
29 12 Taking out the silt & foreign object , cleaning & removing sludge from Fine bar screen oil & grease Chamber with water pressure, bleaching powder etc, complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
30 13 Taking out the silt & foreign object , cleaning & removing sludge from MBBR I & II Chamber with water pressure, bleaching powder etc , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
31 14 Taking out the silt & foreign object , cleaning & removing sludge from Tube Setteler Chamber with water pressure, bleaching powder etc , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
32 15 Supply and fixing of Plastic Media MBBR (Media) as per existing size & specification as per IS fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 22 Cubic Metre
33 16 Supply and fixing of Bubble diffuser as per existing size & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
34 17 Supply and fixing of Pac media in tube settler tank as per existing size & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 5 Cubic Metre
35 18 Supply and fixing of Sand filter media of sludge drying bed as per existing size & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 15 Cubic Metre
36 19 Supply and fixing of Distribution box at equilistion well as per existing size & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 8 Each Job
37 20 Supply and fixing of MS gate of oil & Greece chamber as per existing size thickness & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
38 21 Supply and fixing of MS gate of sludge drying bed as per existing size thickness & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 12 Each Job
39 22 Preparation of old painted surface of old M S pipe/angles of any description in any width or girth for complete one STP and painting with applying two coats of epoxy paint over and including one coat of primer , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
40 23 Supply and fixing of Pressure gauge o to 7 Kg/cm2 as per existing size & specification fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 8 Each
41 24 Taking out unserviceable/burnt raw non clog submersible type raw effluent sewage lifting Submersible pump set of capacity upto 10 HP of rating 3 phase 440 Volts supply from raw sewage collection sump of STP plant at any location and shifting the same to authorised workshop for repair and re-installation/Re-fixing/lowering in the sewage sump , complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n(i) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\n(ii) Labour for assembling of old/serviceable and new parts to make the Submersible pump set in serviceable condition shall be included under appropriate item. \n(iii) Spare/parts renewed shall be measured and paid separately under appropriate items here in after. 1 Each Job
42 24.01 Cutting out the existing winding of stator of submersible motor of any make and rewinding with super enamelled water proof copper winding wire of best quality of existing size/gauge and weight including replacement of insulation material, varnish, bearing, connection plate and all other petty items required to make motor functional and re-assembling the motor including installation commission and testing on full load , complete all as specified and directed by Engineer-in -Charge. \nNote :Old dismantled winding wire will be contractor property for which credit has been considered under schedule of credit. \nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK or any other equivalent make as approved by GE/Engineer-in -Charge. 4 Each Job
43 24.02 Straightening of the slots of stator of submersible motor of any make, complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
44 24.03 Supply and fixing of thrust bearing block of submersible pump of any make , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
45 24.04 Supply and fixing of gun metal bushes for submersible motor as per manufacturer's design and specification , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Set
46 24.05 Supply and fixing of sand guard of submersible motor, complete all as specified and directed by Engineer-in -Charge. \n 4 Each
47 24.06 Supply and fixing of bronze metal impellars, complete all as specified and directed by Engineer-in -Charge. \n 4 Each
48 24.07 Supply and fixing of shaft sleeve, complete all as specified and directed by Engineer-in -Charge. \n 4 Each
49 24.08 Supply and fixing of set of gasket and O-ring , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
50 24.09 Supply and fixing of Mechanical seal motor end , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
51 24.1 Supply and fixing of Mechanical seal pump end, complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
52 24.11 Supply and fixing of deep groove ball bearing motor side, complete all as specified and directed by Engineer-in -Charge. \n 4 Each
53 24.12 Supply and fixing of groove ball bearing pump side , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
54 24.13 Supply and fixing of pump casing , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Job
55 24.14 Supply and fixing of intermediate casing , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Set
56 24.15 Supply and fixing of bearing housing , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Set
57 24.16 Supply and fixing of bearing cover , complete all as specified and directed by Engineer-in -Charge. \n 4 Each Set
58 24.17 Supply and fixing of shaft protection sleeve , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
59 24.18 Supply and fixing of bowl cast iron , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
60 24.19 Supply and fixing of complete bearing sleeve , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
61 24.2 Supply and fixing of rotor , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
62 24.21 Supply and fixing of cable assembly , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
63 25 Supply & filling of new Gear Oil Grade G-90 for Air Blower , complete all as specified and directed by Engineer-in -Charge. \n 80 Litre
64 26 Supply and fixing of air blower pulley as per sample fixed as in replacment, complete all as specified and directed by Engineer-in -Charge. \n 3 Each
65 27 Supply and fixing in repairs three phase DOL starter with single phase preventor, MCB TPN 32 Apms 'C' series, Voltmeter, ammeter and indication piolet lamps for three phase i.e. R.Y.B, having provision for manual by pass and suitable for operating submersible pumps sets/ blower motors upto 10 HP capacity. complete all as specified and directed by EIC. 3 Each
66 28 Supplying, laying, jointing and testing of LT under ground electric power cable crossed linked polyethylene ( XLPE) insulated, galvanised steel strip or wire armoured, ISI-7098 Marked, with aluminium conductor multi stranded , heavy duty 1100 Volts grade of size 16 sqmm cross sectional area, 4 core ,complete all as specified laid in trenches/ laid under floor or fixed naked with walls / on poles/ in ducts /in GI pipes etc. with and including MS Clamps, nuts , bolts, washers in and including taking down old unservicable cable , complete all as specified and directed by Engineer-in-Charge. \nNote : Excavation, earth work, sand cushioning, protection bricks/ tiles/ block and pipe shall be measured and paid separately under appropriate items.\nMake: FINOLEX/RPG(ASIAN) /RR KABL E/UNIVERSAL /GRANDLAY WIRES & CABLES\n 60 Running Metre
67 29 All as per Sl No 28 above but of size 10 Sqmm 4 core 60 Running Metre
68 30 All as per Sl No 28 above but of size 70 Sqmm 3.5 core 120 Running Metre
69 31 S&F in repair Submersible cable PVC insulated and PVC sheathed conductor 1100 Volt grade of size 10 sqmm 3 core flat cable conforming to IS 694 1977 complete with necessary electric connection complete all as specified and directed by Engineer-in-Charge. 80 Running Metre
70 32 Supply and fixing of Bi-metallic overload relay with single phasing protection of range 2.5 to 4 Amps fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \nMake - Siemens or any other equivalent make as approved by GE/ Engineer -in -Charge.\n 2 Ecah
71 33 S&F in repairs Power Contactor ML-3, 3 phase, 415 Volts , current carrying capacity 4 to 25 Amps coil voltage 220 volts, 50 Hz of make L&T or equivalent of other specified make complete all as specified and as directed by Engineer-in-Charge. \n\n 2 Each
72 34 Supply & fixing in repair MCB TPN capacity 32 Amps, 440 volt AC 'C' series ISI marked complete all as specificed and directed by Engineer-in-Charge. 2 Each
73 35 Supply and fixing of Phase selector switch actuators with carrier, 3 position selector with centre 'OFF' (stay put) fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \nMake - C&S Electric Cat No. RCB2-BD3 or equivalent in L&T/CG/Legrand\n 4 Each
74 36 S&F in repairs single phase preventor to prevent single phasing, reserse phasing wiring & testing complete all as specified and directed by EIC 4 Each
75 37 Supply and fixing of Digital Ampere meter ISI Marked suitable for (0-400Amps) range three phase AC Supply, current ratio 150/5A fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \nMake - Nippen Model No. Nippen DA1 Srl No. 06065314 or equivalent in MICO/SIGMA 2 Each
76 38 Supply and fixing of Voltmeter moving coil type suitable for voltage range 0-500 Volts for three phase AC system fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \nMake - AE/MICO/SIGMA 2 Each
77 39 MCCB 100 Amps, 415 volts AC 50Hz, 4 pole, 10 KA bracking capacity 10 kA ajustable thermal & magnetic setting, 70 % - 100% with suitable size of sheet metal enclosure complete all as specified and directed by Engineer-in- Charge. 1 Each
78 40 MCCB 160 Amps, 415 volts AC 50Hz, 4 pole, bracking capacity 16 kA ajustable thermal setting, 70 % - 100% with suitable size of sheet metal enclosure complete all as specified and directed by Engineer-in- Charge. 1 Each
79 41 Supply & fixing in repairs open construction ballasts (copper wound) of 150 SV /MH suitable for HPSV fittings complete including making connections complete all as specified and directed by EIC. 2 Each
80 42 Supply & fixing in repairs open construction ballasts (copper wound) of 70 SV /MH suitable for HPSV fittings complete including making connections complete all as specified and directed by EIC. 2 Each
81 43 Earthing complete with Galvanised steel earth plate electrode 600 mm x 600 mm x 6 mm burried directly in ground vertically in pit of depth not less than 2.25 metre below normal ground level with top edge of the earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides with mixture of charcoal and common salt in alternate layers and electrode connected to G I earth strip 4 dia G I wire by means of brass bolts, nuts, check nuts and washers, earth strip protected by galvanized steel pipe 40 mm bore (light grade) connected to main switch board or any other electrical equipment all as shown in electrical plate No. 3 of SSR-2009 Part I and including necessary excavation and earth work in any type of soil, 20 mm bore medium grade GI pipe for watering, funnel with wire mesh, PCC (1:3:6), type C-1 chamber, pit cover of precast RCC (1:2:4), type B-1, reinforced XPM of weight not less than 4 kg/ Sq.m and MS frame etc. , complete all as specified and as directed by Engineer-in-Charge. \nNote :- (i) The unit rate includes earth lead and protection pipe up to maximum 7.5 metre from earth plate to earth point/test point.\n(ii) Earth pit shall be constructed minimum 0.5 metre away from earth.\n\n 2 Each
82 44 Supply, laying, jointing, testing and commissioning of Mild Steel pipes Medium grade 15 mm dia in any length, conforming to IS:1239(I) with flanged ends including fittings (Bend, Elbow, Tee, etc) and laid in trenches/fixing on wall/floors including painting with two coats of synthetic enamel paint of existing tint/colour, complete all as specified and directed by the Engineer-in-Charge.\nNote : Excavation, earth work shall be measured and paid separately under appropriate items.\nMake:TATA/ JINDAL/ SAIL. 10 Running Metre
83 45 All as per Sl No 44 above but of size 25 mm dia . 20 Running Metre
84 46 All as per Sl No 44 above but of size 40 mm dia . 40 Running Metre
85 47 All as per Sl No 44 above but of size 50 mm dia . 50 Running Metre
86 48 All as per Sl No 44 above but of size 65 mm dia . 60 Running Metre
87 49 All as per Sl No 44 above but of size 80 mm dia . 20 Running Metre
88 50 All as per Sl No 44 above but of size 100 mm dia . 20 Running Metre
89 51 Excavation in trenches not exc 1.5m wide and and not exc. 1.5m depth wide in soft/loose soil for laying electric cables/pipes etc including getting out excavated earth and trimming the sides and bottoms of trenches , complete all as specificed and directed by Engineer-in-Charge. 45 Cubic Metre
90 52 Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested, complete all as specified and directed by Engineer-in-Charge. 44 Cubic Metre
91 53 Removing excavated soil to a distance not exceeding 50 meter and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. 1 Cubic Metre
92 54 Supply and fixing of cast iron butterfly valve 65 mm dia (wafer type) lever operated class PN-1.0, S.S-304 Disc, Nitrile/EPDM rubber lining including making new flanged joint with 3mm thick rubber gasket (Packing ring) with necessary bolt, nuts and washer of suitable size , fixed as in repair ,complete all as specified and directed by the Engineer-in-Charge.\nMake : Zoloto/Kirloskar/BIR/LEADER 1 Each
93 55 Supply and fixing of cast iron butterfly valve 80 mm dia (wafer type) lever operated class PN-1.0, S.S-304 Disc, Nitrile/EPDM rubber lining including making new flanged joint with 3mm thick rubber gasket (Packing ring) with necessary bolt, nuts and washer of suitable size , fixed as in repair ,complete all as specified and directed by the Engineer-in-Charge.\nMake : Zoloto/Kirloskar/BIR/LEADER 2 Each
94 56 Supply and fixing of cast iron butterfly valve 100 mm dia (wafer type) lever operated class PN-1.0, S.S-304 Disc, Nitrile/EPDM rubber lining including making new flanged joint with 3mm thick rubber gasket (Packing ring) with necessary bolt, nuts and washer of suitable size , fixed as in repair ,complete all as specified and directed by the Engineer-in-Charge.\nMake : Zoloto/Kirloskar/BIR/LEADER 1 Each
95 57 Supply and fixing of cast iron butterfly valve 150 mm dia (wafer type) lever operated class PN-1.0, S.S-304 Disc, Nitrile/EPDM rubber lining including making new flanged joint with 3mm thick rubber gasket (Packing ring) with necessary bolt, nuts and washer of suitable size , fixed as in repair ,complete all as specified and directed by the Engineer-in-Charge.\nMake : Zoloto/Kirloskar/BIR/LEADER 1 Each
96 58 Material and labour for construction of valves pit chamber of size 900 mm x 900 mm x 900 mm , using PCC (1:4:8) 40 mm graded stone aggregate for foundation 15 cm thick, 23 cm thick wall in CM (1:4) 10 mm thick rendering all around the brick work with 1:6 cement mortar PCC (1:2:4) type B1 coping with 20 mm graded agregate for grouting MS frame including 4 mm thick MS top sheet cover with locking arrangement including 50 mm pad lock with double key arrangement, MS frame out of 40 x 40 x 5 mm thick angle iron including paintaing of steel surface with two coats of synthetic enamel paint over a coat of red oxide primers finishing coat including necessary excavation in any type of soil, returning filling in and removal of surplus soil to a distance not exceeding 50 mtrs all as specified and including demolition/dismantling of existing cracked valve chamber ,complete all as specified and directed by the Engineer-in-Charge . 1 Each
97 59 As per item No 58 but size 1200 mm x 1200 mm x 1200 mm 1 Each
98 60 Supply and fixing of pressure guage analog type suitable for pressure range 0 to 10 Kg/Cm2 fixed as in repair ,complete all as specified and directed by the Engineer-in-Charge. 4 Each
99 61 Preparation of old painted surface of existing exposed iron surfaces/pipes/iron gate etc of any description in any width or girth and painting with synthetic enamel paint (colour to be decided by EIC) over a coat of red oxide primer , complete all as specified and directed by Engineer-in -Charge. \n 4 Square Metre
100 62 General servicing of Kirloskar Make DG set including tappet adjuistment of 82.5 KVA sets including supply and replacement of tappet cover gasket , complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n(i) Labour for assembling of old/serviceable and new parts to make the DG set in serviceable condition shall be included under appropriate item. \n(ii)Spare/parts renewed shall be measured and paid separately under appropriate items here in after. 1 Each Job
101 62.01 Supply and fixing of diesel filter Primery and secondary fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each
102 62.02 Supply and fixing of Lub Oil filter fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
103 62.03 Supply and fixing of radiator hose pipe Set fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each Set
104 62.04 Supply and fixing of Fan belt fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
105 62.05 Supply and fixing of fuel/lub oil pipe flexible fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each
106 62.06 Supply and fixing of Lub oil filter cartridge fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
107 62.07 Supply and fixing of Air cleaner Element fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
108 62.08 Supply and fixing of Hose pipe for Air cleaner fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
109 62.09 Supply and fixing of Hose thermostat by pass fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
110 62.1 Supply and fixing of Hose water pump to radiator fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
111 62.11 Supply and fixing of Hose water pump inlet to radiator fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
112 62.12 Supply and fixing of Hose make up tank fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
113 63 General servicing of Kirloskar Make DG set including tappet adjuistment of 30/50 KVA sets including supply and replacement of tappet cover gasket , complete all as specified and directed by Engineer-in -Charge. \nNOTES :-\n(i) Labour for assembling of old/serviceable and new parts to make the DG set in serviceable condition shall be included under appropriate item. \n(ii) Spare/parts renewed shall be measured and paid separately under appropriate items here in after. 3 Each Job
114 63.01 Supply and fixing of diesel filter (34.32-1200) Primery and secondary fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 6 Each
115 63.02 Supply and fixing of Lub Oil filter fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each
116 63.03 Supply and fixing of radiator hose pipe Set fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each Set
117 63.04 Supply and fixing of Fan belt fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each
118 63.05 Supply and fixing of fuel/lub oil pipe flexible fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
119 63.06 Supply and fixing of Lub oil filter cartridge fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
120 63.07 Supply and fixing of Air cleaner Element fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each
121 63.08 Supply and fixing of Hose pipe for Air cleaner fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each
122 63.09 Supply and fixing of Hose thermostat by pass fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each
123 63.1 Supply and fixing of Hose water pump to radiator fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each
124 63.11 Supply and fixing of Hose water pump inlet to radiator fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each
125 63.12 Supply and fixing of Hose make up tank fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 3 Each
126 64 Supply and filling the new oil 20W/40W all as per manufacturer's recommendation up to required level after disconnecting of oil chamber and decaning of old lub oil from all sets , complete all as specified and directed by Engineer-in -Charge. \n 45 Litre
127 65 Dismantling of self starter and transporting it into Authorised workshop for repair including replacement of bush pinion , carbon brushes, gear terminal plate, contact plate washer and reinstalling and testing , complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account. 1 Each
128 66 M&L of DG Set repair/rewinding of field coil of self stater commutator including replacement of carbon brushes, terminal plate, contact plate, thrust washer , complete all as specified and directed by Engineer-in -Charge. \n\n 1 Each
129 67 Dismantling of Radiator and transporting to authorised workshop for overhauling /servicing and cleaning with appropriates chemicals and welding of fins/tubes , complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account. 1 Each Job
130 68 Dismantling of battery charger including servicing and repair of transformer , complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Spare/parts renewed shall be measured and paid separately under appropriate items here in after. \n 2 Each Job
131 69 Supply and fixing of digital DC voltmeter as per site requirement fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
132 70 Supply and fixing of digital DC Amp meter as per site requirement fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
133 71 Supply and fixing of DC rectifier fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 4 Each
134 72 Dismantling of the booster coil from alternator of DG set installed at STPs and transporting of the same to workshop for rewinding with supper enamelled copper winding including tapping,varnishing , drying and assembling the same after winding and transporting back to site and connecting the same with alternator and testing the same , complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK 2 Each Job
135 73 Supply and fixing of rectifier unit after dismanteling of old unservicable rectifier , complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
136 74 Dismantling of ring gear from DG set of different STPs including dismantling of alternator and re-alignment and fixing of ring gear, complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
137 75 Supply and replacement of ring gear fly wheel (CDI-04166600 complete all as specified and directed by EIC. 2 Each Job
138 76 Dismantling of water pump complete from DG set any make and supply and replacement of unserviceable part suitable for Ashoka Leyland Kirloskar DG set of capacity 30/50/82.5KVA at STPs , complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
139 77 Serving of alternator of any make including cleaning, varnicing & backing of winding , complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
140 78 Taking out Fuel injection pump assembly from DG set 30/50 KVA capacity and overhauling /calibration of the same from authorised dealer /calibration agency including replacement of worn out part such as gasket set, drive shaft, techno meter pump kit, bearing weight carrier, O ring sims etc for re- fixing pump assembly to DG set at site, complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\n 2 Each Job
141 79 Supply and fixing of auto Amp meter for recording battery volt , complete all as specified and directed by Engineer-in -Charge. \n 1 Each
142 80 Supply and fixing of indicator lamp 24 Volts , complete all as specified and directed by Engineer-in -Charge. \n 3 Each set of three
143 81 Supply and fixing of water temperature gauge, complete all as specified and directed by Engineer-in -Charge. \n 2 Each
144 82 Dismantling of Dynamo from DG set installed at STPs and transporting to workshop , strip opening taking out burnt winding wire form the stator cleaning the slot and re-winding the same with suitable size of copper winding wire , replacement of worn out diod, bearing and cutout , overhauling & servicing of the Dynamo and tranporting bakc to site and connecting the same with DG set and testing, complete all as specified and directed by Engineer-in -Charge. \nNOTE :-Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against this item and nothing extra shall be admisible on this account.\nMake of winding wire :DEVI DAYAL/ HTP/ CHETAK \n 2 Each Job
145 83 Supply and fixing of carbon brushes of alternator including repair / replacement of carbon brush holder fixed as in replacment , complete all as specified and directed by Engineer-in -Charge. \n 2 Each Job
146 84 Changeover switch in MS sheet enclosure with front handle operated ON Load type 4 pole 415 V, 50 cycles-100 Amp including fixing on wall with clamps of suitable size with nuts bolts and washers complete all as specificed and directed by Engineer-in-Charge. 2 Each Job
147 85 Supply and fixing of sealed battery maintenance free, 12V, 150 AH , Superior maintenance free characteristics including initial charging , complete all as specified and directed by Engineer-in -Charge. \nMake :EXIDE/ AMCO/ PANASONIC/ SINETRAC/ PRESTOLITE/ AMRON/ LUMINUOUS\n 2 Each
148 86 Supply and fixing of crocodile clip for connecting to battery terminals, complete all as specified and directed by Engineer-in -Charge. \n 10 Each
149 87 M&L for painting of GE sets after preparation of surface apply two coat of synthetic enamelled paint over one coat of metal primer complete all as specified and directed by EIC. 4 Each
150 88 Supply of liquid chlorine sodium hypochlorites (Grade-I) drinking water with 9% chlorine contents by volume conforming to IS-11673 in sealed non-chemical re-actined / oxidation LDPE containers of 40 Kg PVC tanks, as required on monthly basis with manufacturer's chlorine test certificate and manufacturer's date marked not more than 02 week old , complete all as specified and directed by Engineer-in-Charge. NOTES :- (i) Approval of chemical (sodium hypochlorite) shall be given after verifaction of test certificates of chemical of various manufactures and other factores like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/ make of the chlorination of chemical must be stated in production and certified by govt laboratory confirming compliance of specification suitable for drinking water with a declearation from the laboratory that from the technical strengh stability health safety and operation point of view this product is used for drinking water applications for consumption by humans and the brand/make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory.\n\n\n 1575 Ltrs
151 89 Provision for Bactroligical test and sample collection from Four STP plant in sterlized bottle by UP Pollution Control Board ,monthly periodically as per the enviroment ( Protection ) Rull Sch II ( Rule 3 ) 1986 , in permission standard in Sewage Treated Water for inland surface water i.e , complete all as specified and directed by Engineer-in -Charge. \nContractor has to maintain the quality of water as below mentioned parameters:\n(a) Suspended solid Max < 50 mg / Ltrs . \n(b) Dissolved Solids max in - organic < 2100 mg /a , \n(c) PH value (6.5 to 9.0 PH ) \n(d) Biochemical oxygen Demand ( 5 days at 20 ^ degree cetigrate ) Max < 20\n(e) COD ( Chemical Oxygen Demand ) up to 50 mg / l . \n(f) Total coliform in MPN as per standard Norms \n(g) Focal Coliform in MPN as per standard norms . \nNOTE:- Testing report for 04 no of STP for Raw sewage and after treatment water monthly wise on last week of each month will be included in quotaed rate .The contractor responsibilty to maintain test parameter as per standard norm planned sewage plant maintanance time to time fpr proper functioniong. 11 Each Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail