Tender For Shifting Of Electric Line-1 Carriage Of Various Size Pcc Poles From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 2 Carriage Of Various Size St Poles From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 3 Carriage Of Line Material Viz. Weasel / Rabbit / Racoon / Dog Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Cable Boxes, Static Meter Insulators, Clamps And Other Line Material From Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 4 Carriage Of 250 / 100 Kva T / F From Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work 5 Carriage Of 63 / 25 / 16 Kva T / F From Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work 6 Carriage Of Different Size 11 Kv Xlpe Cable From Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work 7 Erection And Grouting Of S.T.P Double Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 8 Erection And Grouting Of P.C.C Double Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 9 Erection And Grouting Of S.T.P Single Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 10 Erection And Grouting Of P.C.C Single Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 11 Erection And Grouting Of Stay Set Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T & P Etc. Required For Proper Completion Of Work. 12 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Weasal / Racoon / Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carries Etc. Required For Proper Completion Of Work. 13 Laying Of Different Size Xlpe Cable In The Trecnh / Gi Pipe / Hdpe Pipe And Redressing Of Trench After Laying Of Xlpe Cable For Proper Completion Of Work As Per Respo Manual 14 Mounting Of 250 / 100 Kva T / F On The Double Pole / Plinth Structure And Connection Thereof 15 Mounting Of 63 / 25 / 16 Kva T / F On The Double Pole / Plinth Structure And Connection Thereof 16 Safe Carriage From Panki Store To Site And Installation Of Ctpt Double Metering Unit On Double Pole Of Large And Heavy Consumer As Per Respo Manual 17 Safe Carriage From Panki Store To Site And Installation And Grouting Of Meter Pilfer Unit As Per Respo Manual 18 Fixing And Proper Termination Of Cable Jointing Kit Of Various Size At Working Site ( Jointing Will Be Provided By Contractor ) .