Kerala Water Authority-KWA has published State Plan 2020 21 Optimization Of Production And Transmission Jica Assisted Kwss To Meenad And Adjoining Villages Leak Rectification Works Of Reservoirs. Submission Date for this Tender is 15-06-2021. Reservoir Tenders in Valakom Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-May-2021 | Date extension | Date | 02-06-2021 |
2 | 03-Jun-2021 | Date Extension. | Date | 08-06-2021 |
3 | 08-Jun-2021 | extension | Date | 15-06-2021 |
Work Name:State plan 2020-21-Optimization of production and transmission- JICA assisted KWSS to Meenad and adjoining villages- LeaK rectification works of reservoirs | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Leak rectification works of Reservoirs | BI01010001010000000000000515BI0100001112 | ||
2 | 1.001 | Applying leak proof mixture (Netto Bond FBR(Forsoc brand), fine sand and cement) in the leakage portion of water tank side walls after Cutting V shaped grooves into the inside portion of water tank including all cost of scaffolding, staging, lifting, conveyance, material and labour charges etc. complete as per the direction of departmental officers | BI01010001010000000000000515BI0100001113 | 569 | metre |
3 | 1.002 | Applying two coat bond by using brush to the insde wall of OHSR. In first coat using (Netto bond FBR+Cement) in second coat using proportion of Netto bond Powder 23kg, 4Litter Forsoc liquid, with 4 litter water into the inside portion of filter chamber including all cost of scaffolding, staging, lifting, conveyance, materials and labour charges etc. complete as per the direction of departmental officers | BI01010001010000000000000515BI0100001114 | 1402 | sqm |
4 | 1.003 | Injecting cement cibex 100 with cement into the detected leak ponts using rundrow plug after Drilling holes of 12mm dia depth upto 12cm into the outside portion of water tank including all cost of scaffolding, staging, lifting, conveyance, material and labour charges etc. complete as per the direction of departmental officers | BI01010001010000000000000515BI0100001115 | 2230 | No |
5 | 1.004 | 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001116 | 14942 | sqm |
6 | 1.005 | Note: GST @ 12% of bill amount will be paid additionally. | BI01010001010000000000000515BI0100001117 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail