Public Works Department-PWD has published Supply , Installation , Testing And Commissioning Of Laundry Equipments Along With Allied Equipments At Regional Institute Of Ophthalmology At Gupkar Road , Srinagar. Submission Date for this Tender is 12-07-2021. Washers Tenders in Kashmir Nursing Home Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 28-May-2021 | extensio | Date | 05-06-2021 |
2 | 03-Jun-2021 | extension | Date | 14-06-2021 |
3 | 14-Jun-2021 | extnsion | Date | 21-06-2021 |
4 | 21-Jun-2021 | XTNSION | Date | 24-06-2021 |
5 | 24-Jun-2021 | edffg | Date | 01-07-2021 |
6 | 01-Jul-2021 | xtnsion | Date | 05-07-2021 |
7 | 05-Jul-2021 | extension4fgt467uyh | Date | 12-07-2021 |
Name of Work:Supply, installation, testing and commissioning of Laundry Equipments along with allied equipments at Regional Institute of Opthamology at Gupkar Road, Srinagar | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply, Installation, Testing & Commissioning of HSD/LDO fired Steam Boiler- Non-IBR , 300Kg/hr capacity along with all accessories as enlisted in annexure 'B' including providing and fitting of Steam reducing station (PRV). The job shall also include fabrication of 500 litres, rectangular Day oil tank to be fabricated out of 5mm thick MS sheets duy insulated with 50mm thick thermocol of density 16 Kg/Cubm & covered with 26 gauge aluminium sheet metal cladding and installation of same on the wall by providing necessary MS stand. The tank shall be fitted with automatic fuel level sensor along with providing and fitting of Gear type fuel transfer pump coupled with motor of required HP \n | 1 | Job | |
2 | 2 | Supply installation testing and commissioning of softener plant with FRP body having a capacity of delivering 1500 lts per hour and pressure range between 1.5 to 5kgf/cm2. This plant should be able to soften the available water at site and render it viable for use in circuit of the laundry plant. The plant shall be complete with pump set, PVC brine tanks, resin filled tanks, valves and piping grid to deliver the continuous soft water. The untreated water at site can have details as per technical specifications. | 1 | Job | |
3 | 3 | Supply Installation Testing and Comissioning of high Carbon Steel seamless piping along with the insulation cladding and pipe supports details as per technical specifications for Steam Line. | |||
4 | 4 | 50 MM | 15 | Mts | |
5 | 5 | 40 MM | 15 | Mts | |
6 | 6 | 25 MM | 10 | Mts | |
7 | 7 | 15 MM | 30 | Mts | |
8 | 8 | Supply Installation Testing and Comissioning of Mild Steel seamless pipng along with Pipe supports details as per technical specifications for Machine outlet line as recommended by the OEM. | |||
9 | 9 | 32 MM | 20 | Mts | |
10 | 10 | 25 MM | 20 | Mts | |
11 | 11 | 20 MM | 10 | Mts | |
12 | 12 | Supply Installation Testing and Comissioning of Gate Valves | |||
13 | 13 | 50 MM | 1 | job | |
14 | 14 | 40 MM | 2 | job | |
15 | 15 | 25 MM | 5 | job | |
16 | 16 | 20 MM | 3 | Job | |
17 | 17 | 15 MM | 1 | job | |
18 | 18 | Supply Installation Testing and Comissioning of G.I B class piping details as per technical specifications. | |||
19 | 19 | 50MM | 20 | Mts | |
20 | 20 | 40MM | 10 | Mts | |
21 | 21 | 32MM | 5 | Mts | |
22 | 22 | 25MM | 5 | Mts | |
23 | 23 | 20 MM | 15 | Mts | |
24 | 24 | 15 MM | 10 | Mts | |
25 | 25 | Supply Installation Testing and Comissioning of ball valves of follwing diameters details as per technical specifications. | |||
26 | 26 | 25 MM | 5 | No | |
27 | 27 | 20 MM | 5 | No | |
28 | 28 | Supply, Installation, Testing & Commissioning of Front Loading Washer cum Extractor machines 15 Kg capacity details as per technical specifications. \n\n | 3 | Job | |
29 | 29 | Supply, Installation, Testing & Commissioning of Drying Tumbler 15 Kg capacity details as per technical specifications. \n\n | 3 | Job | |
30 | 30 | Supply, Installation, Testing & Commissioning of Flatwork Rotary Drying Ironer front feed front return (Single roller) including suitable compressor as per technical specifications | 1 | Job | |
31 | 31 | Supply, Installation, Testing & Commissioning of Flat Bed Press details as per technical specifications. \n\n | 1 | Job | |
32 | 32 | Supply of Dry Linen Trolley of 50Kg Capacity details as per technical specifications. \n | 3 | Job | |
33 | 33 | Supply of Washroom Trolley of 50Kg Capacity details as per technical specifications. \n\n | 3 | Job | |
34 | 34 | Supply of Shelf Trolley of 50Kg Capacity details as per technical specifications. \n\n | 2 | Job | |
35 | 35 | Supply, Installation,Testing & Commissioning of Air Compressor details as per technical specifications. \n | 1 | Job | |
36 | 36 | Supply, Installation, Testing & Commissioning of Main Electrical Control Panel including cabling, MCCB, Changeover switches etc for connecting various equipments details as per technical specifications.\n\n | 1 | Job | |
37 | 37 | Providing and fitting of High-density polyethylene (HDPE) three layer tanks for raw/soft waterof capacity 2000 ltrs along with iron trussle on which water tanks are to be placed. | 4 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy