}

Work Against Sanctioned Package No. 155/2020-21 (Under Deposit Scheme) Under Electricity Urban Distribution Division-Iv, Gorakhpur, AREA OF EUDD-IV GKP-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published Work Against Sanctioned Package No. 155/2020-21 (Under Deposit Scheme) Under Electricity Urban Distribution Division-Iv, Gorakhpur. Submission Date for this Tender is 13-05-2021. Bolts Tenders in AREA OF EUDD-IV GKP Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27796703
Work Against Sanctioned Package No. 155/2020-21 (Under Deposit Scheme) Under Electricity Urban Distribution Division-Iv, Gorakhpur
Open Tender
Indian
Uttar Pradesh
AREA OF EUDD-IV GKP
13-05-2021

Tender Details

Work Against Sanctioned Package No. 155 / 2020-21 ( Under Deposit Scheme ) Under Electricity Urban Distribution Division-Iv, Gorakhpur-2 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 3 11Kv Xlpe 3X120 Sq Mm. 4 St Pole 11 Mtr. Long 5 11 Kv Dropper Angle 6 11 Kv Top Channel 7 Stay Complete 8 11 Kv T-Off Channel With Support 9 11 Kv Disc Insulator With Fitting 10 11 Kv Cable Jointing Kit 3X120 Sq.Mm. 11 11 Kv Cable Jointing Kit For 11 Kv Abc ( 3X120+100 ) Sq.Mm. 12 11 Kv Abc Cable ( 3X120+100 ) Sq.Mm. 13 Lt Abc Cable ( 3X120+1X95+1X16 ) Sq.Mm. 14 Earthing Complete 15 Single Phase Electronic Meter 16 Three Phase Electronic Meter 17 Supply Of Following Material / Fitting Complete In All Respect :- 18 Nuts & Bolts Of Different Size 19 Holding Clamps 20 Gi Pipe 6 Inch Dia 21 Distribution Box With Clamp ( Distribution Box Shall Be Made From 20 Swg Crca Sheet By Deep Drown Method With Powder Coating & Size Of Box Shall Be 418 Mm X 300Mm X 120 Mm ( Roof Of The Box Shall Be Tapered On Both Sides To Drain The Rain Water ) 22 Dead End Clamp With I Hook ( Insulated ) For Lt Abc Cable ( 3X120+1X95+1X16 ) Sq.Mm. 23 Suspension Clamp With I Hook ( Insulated ) For Lt Abc Cable ( 3X120+1X95+1X16 ) Sq.Mm. 24 Aluminium Xlpe Cable 1X35 For Energizing Distribution Box 25 Lt Insulated Piercing Connector For Line To Line Jumpering In Case Of Tapping 26 Lt Clamp For Stp Pole With Nuts & Bolts 27 Lt Cable 2X6 Sq.Mm. Armoured 28 Lt Cable 4X16 Sq.Mm. Armoured 29 Shackle Insulator 30 The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Ngrouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Nmaking Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. Nall Work Will Be Done As Per Respo Norms & Relevent Is Specification. 31 The Excavation Of Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of St 11 Mtr. Long Pole With Fixing Of Necessary Clamps & Accessories As Per Required. All Required Materials Such As Holding Clamp / Stp / Lt Clamp, Lt Shackle Insulator, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Ngrouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Nin Case Of St Pole Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. Nall Work Will Be Done As Per Respo Norms & Relevent Is Specification. 32 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 33 Painting Of Pole With Aluminium Paint & Red Oxide Paint Provided By Contractor 34 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 35 Laying, Stringing, Sagging, Binding And Jumpering Of Abc ( 3X120+100 ) Sq.Mm. Cable Of 11 Kv Line With Fixing Of Required Accesiories 36 Laying, Stringing, Sagging, Binding And Jumpering Of Abc ( 3X120+1X95+1X16 ) Sq.Mm. Cable Of Lt Line With Fixing Of Distribution Box With Clamp, Insulated Dead End Clamp With I Hook, Suspension Clamp With I Hook ( Insulated ) , Lt Insulated Piercing Connector, Xlpe 1X35 Sq.Mm. Al. Cable For Enerzing Db. 37 Laying And Dressing Of Under Ground 11 Kv Xlpe 3X120 Sq Mm By Horizontal Drilling Method As Per Respo Norms. The Depth Of Horizontal Drilling Shall Be Between 2 To 3 Meters Or As Per Site Required. 38 Errection Of Cable Jointing Kit & Hoisting Of Cable On Double Pole Using G.I. Pipe 4Dia 3 Mtr. Long ( G.I. Pipe 4 Dia And Other Necessary Materials Excluding 11 Kv Xlpe Cable 3X120 Mm² Cable Provided By Contractor ) 39 Errection Of 11 Kv Abc ( 3X120+100 ) Sq.Mm.Cable Jointing Kit 40 Preparing The Single Phase Electronic Meter By Fixing Plastic / Hologram Seals And Entering Meter Data On Meter Register And Then Marking The Lab Meter No. On Meter Cover With Permanent Marker Pen. After That Replacement / Installation Of Single Phase Electronic Meters On Connections At The Outside The Main Gate Of Permises Of The Consumer Including The Work Of Sealing The Meter And Filling Of Sealing Certificate Properly And Handing Over Copy Of Sealing Certificate To Consumer And Concerned Division / Subdivision On Same Day. 41 Preparing The Three Phase Electronic Meter By Fixing Plastic / Hologram Seals And Entering Meter Data On Meter Register And Then Marking The Lab Meter No. On Meter Cover With Permanent Marker Pen. After That Replacement / Installation Of Three Phase Electronic Meters On Connections At The Outside The Main Gate Of Permises Of The Consumer Including The Work Of Sealing The Meter And Filling Of Sealing Certificate Properly And Handing Over Copy Of Sealing Certificate To Consumer And Concerned Division / Subdivision On Same Day. 42 Disconnection And Re-Connection Of Consumer Cable Of Complete Lt Line ( Single / Three Phase ) 43 Dismantling Of Following Line Materials And Safe Loading, Unloading And Carraige Of Dismantled Material From Work Site To Departmental Store ( As Per Site Requirement ) 44 Nuts & Bolts Of Different Size 45 Holding Clamps 46

Key Value

Document Fees
INR 1180 /-
EMD
INR 7500.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail