Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Replacement Of 33 Kv/11Kv/Lt Lines Pole Line , Cable Etc . Damaged Due To Various Reasons Deviya Aapda And Restoration Of Supply Under Edd-I , Aligarh. Submission Date for this Tender is 26-04-2021. Electric Pole Tenders in EDD-I, ALIGARH Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-I, Aligarh. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001113 | 111 | Nos. |
3 | 1.02 | PCC poles 9 Mtr. | BI01010001010000000000000515BI0100001113 | 4 | Nos. |
4 | 2 | Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001116 | 79 | Qtl. |
5 | 3 | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001117 | ||
6 | 3.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001118 | 106 | Nos. |
7 | 3.02 | PCC poles 9 Mtr. | BI01010001010000000000000515BI0100001118 | 4 | Nos. |
8 | 4 | Dismentling of old and damaged pole after dismentling of all accessories. | BI01010001010000000000000515BI0100001117 | ||
9 | 4.01 | 11 KV line double pole | BI01010001010000000000000515BI0100001118 | 2 | Nos. |
10 | 4.02 | 11 KV line single pole. | BI01010001010000000000000515BI0100001118 | 32 | Nos. |
11 | 5 | Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001118 | 2 | Nos. |
12 | 6 | Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001129 | ||
13 | 6.01 | ACSR Weasal Conductor. | BI01010001010000000000000515BI0100001128 | 3728 | Mtr. |
14 | 6.02 | LT 3x95+1x70+1x16 bunch conductor | BI01010001010000000000000515BI0100001128 | 50 | Mtr. |
15 | 7 | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. | BI01010001010000000000000515BI0100001130 | 11 | Nos. |
16 | 8 | Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work | BI01010001010000000000000515BI0100001129 | ||
17 | 8.01 | ACSR Weasal Conductor. | BI01010001010000000000000515BI0100001128 | 18991 | Mtr. |
18 | 8.02 | ACSR Dog Conductor. | BI01010001010000000000000515BI0100001128 | 3500 | Mtr. |
19 | 9 | Straightening of tilted pole at various places as per direction of JE. | BI01010001010000000000000515BI0100001129 | ||
20 | 9.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001128 | 12 | Nos. |
21 | 10 | Replacement of following damaged accessories:- | BI01010001010000000000000515BI0100001129 | ||
22 | 10.01 | 11 KV Disc Insulator | BI01010001010000000000000515BI0100001128 | 66 | Nos. |
23 | 10.02 | 11 KV Pin Insulator | BI01010001010000000000000515BI0100001128 | 279 | Nos. |
24 | 10.03 | 11 KV V-type Cross Arm | BI01010001010000000000000515BI0100001128 | 54 | Nos. |
25 | 11 | Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends. | BI01010001010000000000000515BI0100001130 | 41 | Nos. |
26 | 12 | Grouting of PCC poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms. This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting. | BI01010001010000000000000515BI0100001129 | ||
27 | 12.01 | PCC poles 8.5 Mtr | BI01010001010000000000000515BI0100001118 | 115 | Nos. |
28 | 13 | Chopping of tree branches which are touching to 11 KV/LT lines. | BI01010001010000000000000515BI0100001132 | 85 | Nos. |
29 | 14 | Demounting & carriage of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001129 | ||
30 | 14.01 | 10/16 KVA T/F | BI01010001010000000000000515BI0100001130 | 2 | Nos. |
31 | 14.02 | 25 KVA T/F | BI01010001010000000000000515BI0100001130 | 1 | No. |
32 | 14.03 | 63 KVA T/F | BI01010001010000000000000515BI0100001130 | 1 | No. |
33 | 15 | Providing & fixing clamps for supporting various type accessories such as cross arm, F-clamps etc. | BI01010001010000000000000515BI0100001130 | 34 | Nos. |
34 | 16 | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001142 | 1200 | Mtr. |
35 | 17 | Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. | BI01010001010000000000000515BI0100001153 | 32 | Nos. |
36 | 18.01 | (a) Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001148 | 12 | Nos. |
37 | 18.02 | (b) Providing and fixing of stay insulator. | BI01010001010000000000000515BI0100001130 | 12 | Nos. |
38 | 19 | Erection of section Tee pole including fixing of all fittings as per RESPO norms. | BI01010001010000000000000515BI0100001130 | 1 | No. |
39 | 20 | Installation of extra “T”on the old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. | BI01010001010000000000000515BI0100001130 | 3 | Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy