Military Engineer Services-MES has published Job Order For Manning And Operation Electrically Driven Service Lifts Installed At A Block , B Block , C Block , S And T Complex , P118 , P92 , P93 , P96 , P65 And P25 Assaye Bldg Under Ge West Colaba. Submission Date for this Tender is 23-04-2021. Passenger Lift Tenders in GE WEST MUMBAI Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work: JOB ORDER FOR MANNING AND OPERATION ELECTRICALLY DRIVEN SERVICE LIFTS INSTALLED AT A BLOCK, B BLOCK, C BLOCK, S AND T COMPLEX, P118, P92, P93, P96, P65 AND P25 ASSAYE BLDG UNDER GE WEST COLABA | ||||
---|---|---|---|---|
Item Description | Item Code / Make | Quantity | Units | |
1 | JOB ORDER FOR MANNING AND OPERATION ELECTRICALLY DRIVEN SERVICE LIFTS INSTALLED AT A BLOCK, B BLOCK, C BLOCK, S AND T COMPLEX, P-118, P-92, P-93, P-96, P-65 AND P-25 (ASSAYE BLDG) UNDER GE(WEST) COLABA\n\n(a) Operation of multiple passenger lift installed at various buildings by deputing one lift attendent for vertical operation of Two lift per shift for timing of Two shifts (i.e. 0600 hrs to 1400 hrs & 1400 hrs to 2200 hrs) including daily cleaning of car cabin, taking care of lift for smooth functioning, checking of vertical landing operation, any damage, pilferage, theft & any breakdown shall be immediately inform to concerned lift mechanic, JE/AGE E/M as specified and directed – per operator per shift - 180\nLoaction/Bldg No : (i) 'A' Block (ii) 'B' Block (iii) 'C' Block\n(b) Operation of multiple passenger lift installed at various buildings by deputing one lift attendant for vertical operation of One lift per shift for timing of Two shifts (i.e. 0600 hrs to 1400 hrs& 1400 hrs to 2200 hrs) including daily cleaning of car cabin, taking care of lift for smooth functioning, checking of vertical landing operation, any damage, pilferage, theft & any breakdown shall be immediately inform to concerned lift mechanic, JE/AGE E/M as specified and directed – per operator per shift - 180\nLoaction/BldgNo : (i) P-92 (ii) P-93 (iii) P-96\n(c) Operation of multiple passenger lift installed at various buildings by deputing one lift attendant for vertical operation of Three lift per shift for timing of Two shifts (i.e. 0600 hrs to 1400 hrs& 1400 hrs to 2200 hrs) including daily cleaning of car cabin, taking care of lift for smooth functioning, checking of vertical landing operation, any damage, pilferage, theft & any breakdown shall be immediately inform to concerned lift mechanic, JE/AGE E/M as specified and directed – per operator per shift - 60\nLoaction/BldgNo : (i) P-65\n(d) Operation of multiple passenger lift installed at various buildings by deputing one lift attendant for vertical operation of Two lift per shift for timing of One shift (i.e. 0900 hrs to 1700 hrs) including daily cleaning of car cabin, taking care of lift for smooth functioning, checking of vertical landing operation, any damage, pilferage, theft & any breakdown shall be immediately inform to concerned lift mechanic, JE/AGE E/M as specified and directed - per operator per shift - 30\nLoaction/Bldg No : (i) S&T Complex (Passenger lift)\n(e) Operation of multiple passenger lift installed at various buildings by deputing one lift attendant for vertical operation of One lift per shift for timing of One shift (i.e. 0900 hrs to 1700 hrs) including daily cleaning of car cabin, taking care of lift for smooth functioning, checking of vertical landing operation, any damage, pilferage, theft & any breakdown shall be immediately inform to concerned lift mechanic, JE/AGE E/M as specified and directed – per operator per shift - 30\nLoaction/Bldg No : (i) P-25 (Assaye Building)\nNote for item No 1 (a) to (e) : -\n(i) The contractor shall pay to his lift operators in their Bank Account and statement of Bank Account shall be submitted to GE for his verification while claiming interim payment.\n(ii) The rate quoted shall be deemed to be inclusive of minimum wages all taxes (including GST, GST on works contracts, labour welfare cell/tax etc) EPF for personal employed and also any other levies payable under respective statutes. The contractor shall be required to submit the documentary proof of employers provident fund (EPF) details for the personals employed.\n(iii) Minimum wages shall be as applicable for unskilled workers category under shop or commercial establishment (entry No 17 of Part-I of the minimum wages wages act 1948 inserted vide Maharashtra Act 10 of 1961 amended vide Maharashtra Act 3 1963 and sequent notification dated 28 Sep 2010 taking into account the allowances published).\n(iv) The rate quoted below minimum wages shall not be considered for acceptance.\n\n AGE E/M letter No 309/E3 dt 31 Mar 2021 dt 05 Jan 2021. \nCode head 1/481/00 | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail