Irrigation And Flood Control Department-IFCD has published Water Supply Scheme Mendi Bagudass Under Jal Jeevan Mission [Jjm].. Submission Date for this Tender is 24-04-2021. Water Supply Project Tenders in Dharmari Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Water Supply Scheme Mendi Bagudass under Jal Jeevan Mission [JJM]. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | A) G. I Pipe Works | |||
2 | 2 | Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc [not exceeding 1.5M in width] and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5Mtr including disposal of excavated earth up to 1M from cutting edge | 515 | Cum | |
3 | 3 | Providing and laying of GI pipes complete with cost of G.I pipes/fittings/gate valves/ sluice valve / flow meter on R/main & G/main / all types of pipe specials & tap connection as per site requirement including carriage. | |||
4 | 3.1 | G.I Pipe 15mm dia nominal bore [Light] | 6000 | Mtr | |
5 | 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth consolidation | 463.5 | Cum | |
6 | 5 | Civil Work | BI01010001010000000000000515BI0100001124 | ||
7 | 6 | Construction of collection tank in all kinds of soils (80% all kinds + 20% rock) of sizes 3.15 mtrs each side having depth 2.10 mtrs at wall thickness 0.15 mtrs with 1:1/2:3 mix in Bed Slab and Gola and 1:2:4 mix Cement concrete in Beams, Slabs, Dome, Walls etc. with standard specifications of mud mat, plinth protection etc complete with reinforcement, form work, flooring in 1:2:4 and cement plaster 12mm thick in 1:3 mix complete with admixtures fittings, steel built-up sections and carriage of material ( complete job- details specification to be provided at the time of execution by engineers incharge as per established practices and specifications) including water proofing and finishing all complete. | 22 | No | |
8 | 7 | Construction of 3000 Glns Cap GSR with 1:1/2:3 mix in Bed Slab and Gola and 1:2:4 mix Cement concrete in Beams, Slabs, Dome, Walls etc. with standard specifications of mud mat, plinth protection etc complete with reinforcement, form work, flooring in 1:2:4 and cement plaster 12mm thick in 1:3 mix complete with admixtures fittings, steel built-up sections and carriage of material ( complete job- details specification to be provided at the time of execution by engineers incharge as per established practices and specifications) including water proofing and finishing all complete. | 1 | No | |
9 | 8 | Construction of 5000 Glns Cap GSR with 1:1/2:3 mix in Bed Slab and Gola and 1:2:4 mix Cement concrete in Beams, Slabs, Dome, Walls etc. with standard specifications of mud mat, plinth protection etc complete with reinforcement, form work, flooring in 1:2:4 and cement plaster 12mm thick in 1:3 mix complete with admixtures fittings, steel built-up sections and carriage of material ( complete job- details specification to be provided at the time of execution by engineers incharge as per established practices and specifications) including water proofing and finishing all complete. | 2 | No |