Underground Piping Works For Ows And Cbd Lines Underground Piping Works For Ows And Cbd Lines In Hgu-205 For Rlng Conversion Project At Manali RefineryOf Cpcl, CPCL Chennai-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Underground Piping Works For Ows And Cbd Lines Underground Piping Works For Ows And Cbd Lines In Hgu-205 For Rlng Conversion Project At Manali RefineryOf Cpcl. Submission Date for this Tender is 23-04-2021. Coats and Jackets Tenders in CPCL Chennai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

27673164
Underground Piping Works For Ows And Cbd Lines Underground Piping Works For Ows And Cbd Lines In Hgu-205 For Rlng Conversion Project At Manali RefineryOf Cpcl
Open Tender
Indian
Tamil Nadu
CPCL Chennai
23-04-2021

Tender Details

Underground Piping Works For Ows And Cbd Lines Underground Piping Works For Ows And Cbd Lines In Hgu-205 For Rlng Conversion Project At Manali RefineryOf Cpcl , Carbon Steel Piping Work , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site , Handling At Site , Cutting , Bevelling , Fabrication , Laying , Welding & Erection Of Carbon Steel Piping Including Sleeve Pipes Below Ground Level , Trenches At All Depths , Stand Posts , Anchoring Of All Underground Pipelines For Conection With Equipments & Nozzles . , The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling , Etc . , All Types Of Flanges Like Slip On / Raised Face , Etc . , Valves , Steam Traps , Orifice Assemblies , Strainers , Vents , Drains , Funnels , Etc . , Of Different Schedules , Pressure Ratings And For Various Temperature Applications , The Piping Job Includes Fabrication & Erection Of Pipe Sleeves , Providing Shoe Supports , Pads At Support Locations , Reinforcement Pads , Etc . , Wherever Required . , The Job Includes Flushing , Preparing Work Area For Executing Hot Work , Bending To Suit The Contours Wherever Required , Socket , Fillet , Butt Welding Using E 6010 / E 6013 / E 7018 Electrodes As Required , Dpt Wherever Required , , Hydraulic / Pneumatic Test Twice ( On Completion Of Fabrication & On Completion Of Laying At Site ) As Per Codes , Specification , Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest . , The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . , Exclusions: The Rates For The Following Items Shall Be Exclusive Of Concrete / Pcc Breaking , Earth Work Removal , Blinding & Deblinding , Radiography , Stress Relieving , Reinforcement Pad Welding , Earth Back Filling , Removal Of Old Piping For Replacement . , Inclusions: The Rates For The Following Items Shall Be Inclusive Of Fabrication , Laying , Erection , Welding , Flushing Of The Piping System , Offering Stagewise Inspection , Hydrotesting And Draining / Drying Of The Piping System And Coating & Wrapping/Tape Coating , Guide Or Slide Supports Welding Between Main Pipe And Sleeve Pipe , Pads And Shoes Wherever Required . Contractor Shall Carryout Tape Coating As Per Specification 6-79-0011 And Offer For Inspection And Testing At Every Stage . , With Cpcl Supply Of Free Construction Power , Water & Contractors Welding Machine , Note: If Hydrotesting Is Avoided As Per Instructions Of Eic , 90% Of Unit Price Only Will Be Paid . , Butt Welding , Notes : , ( 1 ) Thickness Of Piping For Measurement Shall Be Based On The Relevant Ansi Or Equivalent Standards , ( 2 ) The Finished Weld Joint Elevation At Site Shall Be Taken As Reference For Measurement , Wherever Applicable . , ( 3 ) The Rates For Socket & Fillet Welding In Piping Shall Remain Same For All Thickness And Elevations As Per Sor . , ( 4 ) Rate For Weld Joints Of Vents & Drains Shall Be Paid On Actual Measurement Using The Applicable Sor . , ( 5 ) Fabrication & Welding Of Pipe Shoe Supports & Pad At Support Locations Are Included In Unit Price . , ( 6 ) For Blinding & Deblinding Wherever Involved , Rates Shall Be Paid Separately . , ( 7 ) For Stress Relieving Of Weld Joints , Rates Shall Be Paid Separately , ( 8 ) In Case Of Replacement Of Existing Piping , Rates For Removal Of Old Pipelines Shall Be Paid Separately , ( 9 ) During Hydrotesting Of The Above Piping Jobs , Some Portions Of The Existing Piping In The Circuit Required To Be Hydrotested Depending On The Blinding And The Same Shall Be Paid Separately . , ( 10 ) For Steam Tracing Piping Work , Hydraulic Testing Of Piping Is Required . For Bending Tracer Pipelines , The Rates Shall Be Paid Separately , ( 11 ) Hydraulic Testing Shall Be Done Only Once For Testing Underground And Sleeve Pipes Before Wrapping & Coating . . , ( 12 ) Radiography Of Weld Joints Is Not Included In Sor And Same Shall Be Paid Separately . , ( 13 ) Wrapping & Coating /Tape Coating Of Pipelines Is Included In Price Thru A Separate Sor Item . Refer Below . , Carbon Steel - Butt Welding Joint - Upto 8 . 8 Mm Piping Thickness - With Hydrotest , Blinding And De-Blinding , The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds , Gaskets , Fasteners , Etc . , From Owners Storage Point , Loosening & Tightening Of Studs ( Cold / Gas Cutting If Required ) , Wedge Opening , Cleaning Of Flanges , Insertions And Removal Of Blind & Gaskets , Providing New Gaskets After Removal Of Blinds , Overhauling Of Fasteners Using Oil , Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting . , The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . , Blinding And Deblinding For 150# & 300# Ratings: , Blinding & Deblinding - Size Upto 1 1/2 Inch Dia , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Tape Coating: Supply And Application Of Corrosion Protection Tape Caoting For Underground Steel Pipelines As Per Specification , Radiography , The Job Includes Performing Radiography Examination Of Welds On All Piping & All Type Of Equipments As Per Relevant Asme / Astm Standards & As Per Cpcl Specification Cpcl-Insp-Rad-01 At All Grades & Elevations With Film Width Not Less Than 4 Inches . , The Job Also Includes Supplying Of Radiation Source Camera , Other Machineries Required , All Consumables Required For Filming & Developing , Transportation Of Camera , Etc . , Area Preparation Before Starting The Job , Labour , Supervision To Complete The Job In All Respects Including Preparation Of Developing Chemicals , Developing The Films & Submission Of Films For Inspection Review . , Note: , ( 1 ) For Pipe Weld Joints , Nominal Diameter Of The Pipe Shall Be Taken For Measurement . . , Pipe Weld Joints - 2 Nominal Dia , Pipe Weld Joints - 4 Nominal Dia , Dye Penetration Test , Performance Of Dye Penetrant Test Including Supply Of All Necessary Materials , Equipment And Labour For Carrying Out The Work As Per Specification And Directions Of Engineer-In Charge . , Dye Penetration Test , Concrete Breaking/Road Cutting/Earth Excavation & Back Filling For Laying Or Removal Of Underground Piping/Dewatering . , Earth Work Excavation & Back Filling , The Job Involves Earth Work Excavation Below Ground Level Upto 2 Metres Depth & To A Required Width For Laying Underground Piping In All Types Of Soils Including Removal Of Vegetation , If Required , Dressing Of Sides , Levelling , Grading , Ramming Of Bottom , Back Filling On Completion Of Laying Of Pipes With Available Excavated Soil , Watering , Rolling , Ramming Of By Manual Methods / Mechanical Compactors , Dressing , Trimming , Etc . , The Job Also Includes Supplying Of All Types Of Tools & Tackles , Machineries , All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions . , Earth Work Excavation & Back Filling - Upto 2 . 0 Metres Depth , Shoring And Strutting , The Job Involves Provision And Installation Of Shoring And Strutting In Excavations Upto 2 Metres Depth , Dismantling And Removal After Completion Of Work As Per Instruction Of Engineer In

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work : UNDERGROUND PIPING WORKS FOR CBD & OWS LINES IN HGU-205 FOR RLNG CONVERSION PROJECT AT MANALI REFINERY OF CPCL
Sl. No. Item Description Item Code / Make Quantity Unit
1 10 CARBON STEEL PIPING WORK
2 20 The job includes transporation of all free issue materials from owner's storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of carbon steel piping including sleeve pipes below ground level, trenches at all depths, stand posts, anchoring of all underground pipelines for conection with equipments & nozzles.
3 30 The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc., all types of flanges like slip on / raised face, etc., valves, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications
4 40 The piping job includes fabrication & erection of pipe sleeves, providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.
5 50 The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes as required, DPT wherever required, ,hydraulic / pneumatic test twice (on completion of fabrication & on completion of laying at site) as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.
6 60 The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
7 70 EXCLUSIONS: The rates for the following items shall be exclusive of concrete / PCC breaking, earth work removal, blinding & deblinding, radiography, stress relieving, reinforcement pad welding, earth back filling, removal of old piping for replacement.
8 80 INCLUSIONS: The rates for the following items shall be inclusive of fabrication, laying, erection, welding, flushing of the piping system, offering stagewise inspection, hydrotesting and draining / drying of the piping system and Coating & Wrapping/Tape coating, guide or slide supports welding between main pipe and sleeve pipe, pads and shoes wherever required.Contractor shall carryout tape coating as per specification 6-79-0011 and offer for inspection and testing at every stage.
9 90 WITH CPCL SUPPLY OF FREE CONSTRUCTION POWER , WATER & CONTRACTOR'S WELDING MACHINE
10 100 Note: If Hydrotesting is avoided as per instructions of EIC, 90% of unit price only will be paid.
11 110 BUTT WELDING
12 120 NOTES :
13 130 (1) Thickness of piping for measurement shall be based on the relevant ANSI or equivalent standards
14 140 (2) The finished weld joint elevation at site shall be taken as reference for measurement, wherever applicable.
15 150 (3) The rates for socket & fillet welding in piping shall remain same for all thickness and elevations as per SOR.
16 160 (4) Rate for weld joints of vents & drains shall be paid on actual measurement using the applicable SOR.
17 170 (5) Fabrication & welding of pipe shoe supports & pad at support locations are included in unit price .
18 180 (6) For blinding & deblinding wherever involved, rates shall be paid separately .
19 190 (7) For stress relieving of weld joints, rates shall be paid separately
20 200 (8) In case of replacement of existing piping, rates for removal of old pipelines shall be paid separately
21 210 (9) During hydrotesting of the above piping jobs, some portions of the existing piping in the circuit required to be hydrotested depending on the blinding and the same shall be paid separately.
22 220 (10) For steam tracing piping work, hydraulic testing of piping is required. For bending tracer pipelines, the rates shall be paid separately
23 230 (11) Hydraulic testing shall be done only once for testing underground and sleeve pipes before wrapping & coating. .
24 240 (12) Radiography of weld joints is not included in SOR and same shall be paid separately.
25 250 (13) Wrapping & coating /Tape Coating of pipelines is included in price thru a separate SOR Item. Refer below.
26 260 Carbon Steel - Butt welding Joint - Upto 8.8 mm piping thickness - With Hydrotest 350 Inch dia
27 270 BLINDING AND DE-BLINDING
28 280 The job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner's storage point, loosening & tightening of studs (cold / gas cutting if required), wedge opening, cleaning of flanges, insertions and removal of blind & gaskets, providing new gaskets after removal of blinds, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting.
29 290 The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions.
30 300 Blinding and deblinding for 150# & 300# ratings:
31 310 Blinding & Deblinding - size upto 1 1/2 inch dia 25 Each
32 320 Blinding & Deblinding - Size 2 inch dia. to 5 inch dia. 70 Each
33 330 TAPE COATING: Supply and application of Corrosion protection Tape caoting for Underground steel pipelines as per specification 40 SqM
34 340 RADIOGRAPHY
35 350 The job includes performing radiography examination of welds on all piping & all type of equipments as per relevant ASME / ASTM standards & as per CPCL specification CPCL-INSP-RAD-01 at all grades & elevations with film width not less than 4 inches.
36 360 The job also includes supplying of radiation source camera, other machineries required, all consumables required for filming & developing, transportation of camera, etc., area preparation before starting the job, labour, supervision to complete the job in all respects including preparation of developing chemicals, developing the films & submission of films for inspection review.
37 370 NOTE:
38 380 (1) For pipe weld joints, nominal diameter of the pipe shall be taken for measurement..
39 390 Pipe weld joints - 2" nominal dia 10 Joint
40 400 Pipe weld joints - 4" nominal dia 10 Joint
41 410 DYE PENETRATION TEST
42 420 Performance of Dye penetrant test including supply of all necessary materials, equipment and labour for carrying out the work as per specification and directions of Engineer-in Charge.
43 430 DYE PENETRATION TEST 150 Inches
44 440 CONCRETE BREAKING/ROAD CUTTING/EARTH EXCAVATION & BACK FILLING FOR LAYING OR REMOVAL OF UNDERGROUND PIPING/DEWATERING.
45 450 Earth work excavation & back filling
46 460 The job involves earth work excavation below ground level upto 2 metres depth & to a required width for laying underground piping in all types of soils including removal of vegetation, if required, dressing of sides, levelling, grading, ramming of bottom, back filling on completion of laying of pipes with available excavated soil, watering, rolling, ramming of by manual methods / mechanical compactors, dressing, trimming, etc.
47 470 The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
48 480 Earth work excavation & back filling - Upto 2.0 metres depth 100 Cu.M
49 490 Shoring and Strutting
50 500 The job involves provision and installation of "Shoring and strutting" in excavations upto 2 metres depth, dismantling and removal after completion of work as per instruction of Engineer in charge
51 510 The job also includes supplying of all types of tools & tackles, materials, all consumables and labour to complete the job in all respects as per EIC instructions.
52 520 Shoring and Strutting - upto 2 metre depth 40 SqM
53 530 Concrete dismantling (PLAIN and REINFORCED)
54 540 The job involves dismantling of reinforced cement concrete pavements including cutting of reinforcement bars, returning of scrap steels to designated area, breaking the RCC work into pieces and disposal of unserviceable material upto 3.0km lead as per the instructions of the Engineer-in-charge.
55 550 The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
56 560 Dismantling Reinforced Cement Concrete (RCC) 30 Cu.M
57 570 Concrete WORKS for Relaying of Dismanlted Road and Pavements
58 580 Providing and laying of Reinforced Cement Concrete (RCC) 1:1.5:3 by volume (1 cemet:1.5 Sand:3 aggregate) with OPC 53 grade and 20mm and down size graded crushed stone aggregate materials for all requirements like pavements, roads, pedestals etc., including machine mixing, curing, consolidating with vibrator, cement cost etc., all complete as per instrucitons of EIC excluding cost of shuttering and reinforcement 30 Cu.M
59 590 Supplying, fabricating and placing in position High strength deformed Steel Bar Reinforcement (Confirming to IS 1786 Grade Fe500) fro RCC works, straightening, cleaning, decoiling, cutting, bending to required shapes and lengths as per details, blinding with Contractor's own 16 Standard wire Gauge (SWG) black soft annealed binding wire at every intersection, supplying and placing wiht proper cover blocks, supports, overlaps, welding spacers, lifting hooks etc., for all heights & depths etc., removing of scraps from site, all complete works as per instructions of EIC. 1.5 MT
60 600 Dewatering - with Contractor's own pump
61 610 The job involves pumping out of water including dewatering oily water mixed with muck / sludge etc. from trenches, pits etc. by contractor's own pump as per the direction of the Engineer-in-charge.
62 620 The job also includes supplying of all types of pumps, tools & tackles, hoses, fuel, all consumables and labour to complete the job in all respects as per EIC instructions.
63 630 Hire charges for 5 HP Diesel driven dewatering pump with all accessories including hoses along with one operator - For 8 Hrs 15 Shift \n(8 Hrs)
64 640 Running charges for 5 HP Diesel driven dewatering pump 80 Hr
65 650 NOTE :
66 660 (1) Running charges are applicable for the actual running hours of the pump and also if the fuel is supplied by the Contractor. If fuel is supplied by CPCL only 40% of quoted price shall be paid for Running charges.
67 670 PROVIDING SERVICE ASSISTANCE FOR MISCELLANEOUS ACTIVITIES
68 680 Providing pre-commissioning assistance to Owner of Skilled / Semiskilled workers as per the directions of Engineer-in-Charge with hand tool and tackles (Excluding Consumables).
69 690 SEMI-SKILLED During General Shift hours (from 0730 hrs to 1600 hrs ) on Monday to Saturday, except on Sundays and Company declared holidays with 30 minutes for Lunch (Provided by Contractor) Break 20 Man Days
70 700 SKILLED During General Shift hours (from 0730 hrs to 1600 hrs) on Monday to Saturday, except on Sundays and Company declared holidays 5 Man Days
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail