Military Engineer Services-MES has published Repair And Painting To All Types Of Steel Furniture Such As Almirah Steel Locker Steel Chair Cb Steel And Charpoy Double Bunk Etc At Ins Valsura Jamnagar. Submission Date for this Tender is 08-06-2021. Painting Tenders in GE I NAVY JAMNAGAR Gujarat. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-May-2021 | Corrigendum to Date 8511 | Date | 01-06-2021 |
2 | 25-May-2021 | CORRIGENDUM TOTENDER BOQ | BOQ | 01-06-2021 |
3 | 28-May-2021 | CORRIGENDUM TO TENDER | Technical Bid | 01-06-2021 |
4 | 01-Jun-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 08-06-2021 |
Name of Work: REPAIR AND PAINTING TO ALL TYPES OF STEEL FURNITURE SUCH AS ALMIRAH STEEL, LOCKER STEEL, CHAIR CB STEEL AND CHARPOY DOUBLE BUNK ETC UNDER GE (I) NAVY JAMNAGAR | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | (A)Removal of following existing unserviceable components of various furniture items carefully without disturbing the adjoining parts and S&F new components in lieu of dismantled components / discorded components as mentioned including tightening the joints, placing everypart in-tact as applicable as per drgs.\n(B) Work will be executed where the furniture exist in different User Units of GE (I) Navy Jamnagar including BSO's Furniture Yard as directed by Engineer-in-Charge. | |||
2 | 1.01 | 1.Almirah Large Steel.FD-1031/67(M) \na) Removing old U/S 6 Liver Lock and S & F new 6 Liver Lock with Duplicate Key as shown in drg. | 196 | Each | |
3 | 1.02 | b) Removing old U/S handle and S & F new handle 150mm long as shown in drg. | 196 | Each | |
4 | 1.03 | c) Removing old U/S hings and S & F new hings as shown in drg. | 300 | Each | |
5 | 1.04 | d) Removing old U/S Leg and S & F new Leg of Almirah Large Steel as shown in drg. | 98 | Each | |
6 | 1.05 | e) Removing of U/S shelves and supply and fix new shelves all as shown in drg. | 52 | Each | |
7 | 1.06 | f) Removing old U/S Locking assembly with iron plate & 02 rods 10mm & lock cover & S/F new locking assembly set as per drg. | 97 | Each | |
8 | 1.07 | g) Refixing loose shelves with spot welding of broken joints not exceeding 25mm in length. \n\n | 600 | Each | |
9 | 1.08 | h)Removing unserviceable existing door shutter of almirah large with shelves steel made out of PBI sheet 1mm thick complete as shown in drg. | 25 | Each | |
10 | 2.01 | 2. Almirah Small Steel & Almirah Med Steel FD-67(M)/1032\na) Removing old U/S 6 Liver Lock with S & F new 6 Liver Lock with Duplicate Key as shown in drg. | 214 | Each | |
11 | 2.02 | b) Removing old U/S handle with S & F new handle 150mm long as shown in drg. | 205 | Each | |
12 | 2.03 | c) Removing old U/S hings with S & F new hings as shown in drg. | 100 | Each | |
13 | 2.04 | d) Removing old U/S Leg with S & F new Leg of Almirah Small Steel as shown in drg. | 34 | Each | |
14 | 2.05 | e) Removing old U/S Locking assembly with iron plate & 02 rods 10mm & lock cover & S/F new locking assembly set complete of Almirah Small Steel as per drg. | 61 | Each | |
15 | 2.06 | f)Refixing loose shelves with spot welding of broken joints nut exceeding 25mm in length. \n | 250 | Each | |
16 | 2.07 | g) Removing of U/S shelves and S&F new shelves made out of 1 mm thick PBI sheet as per existing of size 650 mm of almirah medium with shelves complete all as per drg. | 97 | Each | |
17 | 2.08 | h)Removing unserviceable existing door shutter of almirah med steel made out of 1 mm thick PBI sheet complete all as per drg. | 25 | Each | |
18 | 3.01 | 3. Almirah large 1/2H x 1/2S steel FD-1033\na) Removing old U/S 6 Liver Lock with S & F new 6 Liver Lock with Duplicate Key as shown in drg. | 52 | Each | |
19 | 3.02 | b) Removing old U/S handle with S & F new handle 150mm long as shown in drg. | 52 | Each | |
20 | 3.03 | c) Removing old U/S hings with S & F new hings as shown in drg. | 59 | Each | |
21 | 3.04 | d) Removing old U/S Leg with S & F new Leg of Almirah Large 1/2H & 1/2S Steel as shown in drg. | 16 | Each | |
22 | 3.05 | e) Removing of U/S shelves of Almirah Large Steel 1/2H & 1/2S and supply and fix new shelves of Almirah Large Steel 1/2H & 1/2S all as shown in drg. | 16 | Each | |
23 | 3.06 | f) Removing old U/S Locking assembly with iron plate & 02 rods 10mm & lock cover & S/F new locking assembly set complete of Almirah Large Steel 1/2H & 1/2S as per drg. | 25 | Each | |
24 | 3.07 | g) Removing of loose shelves & refixing with suitable iron cleats 25mm width for each shelves all as shown in drg. | 96 | Each | |
25 | 3.08 | h) Removing unserviceable existing door shutter of Almirah Large Steel 1/2H & 1/2Se with shelves steel made out of PBI sheet 1mm thick as shown in drg. | 7 | Each | |
26 | 4.01 | 4. Almirah med steel ½ H X ½ S FD-1034\n a) Removing old U/S 6 Liver Lock with S & F new 6 Liver Lock with Duplicate Key as shown in drg. | 106 | Each | |
27 | 4.02 | b) Removing old U/S handle with S & F new handle 150mm long as shown in drg. | 106 | Each | |
28 | 4.03 | c) Removing old U/S hings with S & F new hings as shown in drg. | 160 | Each | |
29 | 4.04 | d) Removing old U/S Leg with S & F new Leg of Almirah Small Steel as shown in drg. | 25 | Each | |
30 | 4.05 | e) Removing of U/S shelves of Almirah Small Steel and supply and fix new shelves of Almirah Small Steel all as shown in drg. | 16 | Each | |
31 | 4.06 | f) Removing old U/S Locking assembly with iron plate & 02 rods 10mm & lock cover & S/F new locking assembly set complete of Almirah Small Steel as per drg. | 43 | Each | |
32 | 4.07 | g) Refixing loose shelves with spot welding of broken joints not exceeding 25mm in length. | 97 | Each | |
33 | 4.08 | h) Removing unserviceable existing door shutter of almirah med steel made out of 1 mm thick PBI sheet complete all as per drg. | 12 | Each | |
34 | 5.01 | 5. Chairs writing MAP FD No-FD/E6/MAP/12\na) Removing of existing unserviceable seat ply including cushion foam and tapestry of chair writing MAP S&F with new seat ply including cushion form and tapestry as shown in drg. | 20 | Each | |
35 | 5.02 | b) Removing of existing unserviceable back ply including cushion foam and tapestry of chair writing MAP S&F with new back as shown in drg. | 20 | Each | |
36 | 5.03 | c) Removing of existing unserviceable tepastry of seat of chair writing MAP S&F with new tepastry as shown in drg. | 79 | Each | |
37 | 5.04 | d) Removing of existing unserviceable tepastry of back of chair writing MAP S&F with new tepastry as shown in drg. | 79 | Each | |
38 | 5.05 | e) Removing of existing unserviceable handle of chair writing MAP S&F with new handle as shown in drg. | 124 | Each | |
39 | 5.06 | f) Rejoining the base of stiffner with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 87 | Each | |
40 | 5.07 | g) Removing U/S PVC beading from seat and back of existing chair writing and S&F and new PVC beading in seat and back of chair writing as per drg. | 97 | Each | |
41 | 5.08 | h) Removing U/S PVC shoe and S&F new PVC shoe as per drg. | 200 | Each | |
42 | 5.09 | j) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 100 | Each | |
43 | 6.01 | 6. Chairs Verandah FD-256, 359\na) Removing of U/S canning of seat of chair verandha and recanning of seat of chair verandha with ne cane as per drg. | 600 | Each | |
44 | 6.02 | b) Removing of U/S canning of back of chair verandha and recanning of back of chair verandha with ne cane as per drg. | 600 | Each | |
45 | 6.03 | c) Removing of unserviceable Rubber shoe Chair verandah S&F with new Rubber shoes as per existing size on drg and directed. | 2400 | Each | |
46 | 7.01 | 7. Chair CB Steel With Arms FD-75(M)\na) Removing old U/S Seat of Chair CB Steel with Arms & Supply and Fix new seat frame including cane work as per drg. | 250 | Each | |
47 | 7.02 | b) Removing old U/S Back of Chair CB Steel with Arms & Supply and Fix new back frame including cane workas per drg. | 250 | Each | |
48 | 7.03 | c) Removing of damage MS flat cleat 25x3 mm for Chair CB Steel with Arms and S & F new MS flat cleat 25x3mm duly welded and painted with black paint as per drg. | 781 | Each | |
49 | 7.04 | d) Removing old U/S old Handle of Chair CB Steel with S&F new handle as per drg. | 160 | Each | |
50 | 7.05 | e) Removing old U/S Cap with S & F new cap as per drg. | 550 | Each | |
51 | 7.06 | f) Removing old U/S shoes with S & F new shoes as per drg. | 1000 | Each | |
52 | 8.01 | 8. Chair CB Steel With/out Arms Arms FD-75(M) \na) Removing old U/S Seat of Chair CB Steel with/out Arms & Supply and Fix new seat frame including cane work as per drg. | 50 | Each | |
53 | 8.02 | b) Removing old U/S Back of Chair CB Steel with/out Arms & Supply and Fix new back frame including cane workas per drg. | 50 | Each | |
54 | 8.03 | c) Removing of damage MS flat cleat 25x3 mm for Chair CB Steel with/out Arms and S & F new MS flat cleat 25x3mm duly welded and painted with black paint as per drg. | 160 | Each | |
55 | 8.04 | d) Removing old U/S Cap with S & F new cap as per drg. | 120 | Each | |
56 | 8.05 | e) Removing old U/S shoes with S & F new shoes as per drg. | 196 | Each | |
57 | 9.01 | 9. Desk 1800x530x800 mm TD-7707/ 107 (M)\na) Removing U/S 1 mm plastic laminated from top of desk and S&Fnew plastic laminated sheet 1mm thick, teak finish of size 1800x530 mm on the top of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified. | 25 | Each | |
58 | 9.02 | b) Removing U/S 1 mm plastic laminated from front side of desk and S&F plastic laminated sheet 1mm thick, teak finish of size 1800x200 mm on the front side of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified. | 16 | Each | |
59 | 9.03 | c) Removing U/S 1 mm plastic laminated from side of desk and S&F plastic laminated sheet 1mm thick, teak finish of size 535x200 mm on the side of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified | 16 | Each | |
60 | 9.04 | d) Removing worn out complete wooden box frame from existing desk and supply and fix new complete wooden box frame as per drg. | 4 | Each | |
61 | 9.05 | e) M&L for Preparation of surface of steel tubular frame and applying one coat of synthetic enameled paint silver grey colour of the desk complete all as specified and shown on drg. | 34 | Each | |
62 | 9.06 | f) Removing worn out plywood from front side & S&F 12 mm thick BWR plywood, of size 1800x200 mm on the front side of the desk complete all as specified and shown on drg. | 20 | Each | |
63 | 10.01 | 10. Desk 4' x 6" FD-107\na) Removing U/S 1 mm plastic laminated from top of desk and S&Fnew plastic laminated sheet 1mm thick, teak finish of size 1200x530 mm on the top of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified. | 50 | Each | |
64 | 10.02 | b) Removing U/S 1 mm plastic laminated from front side of desk and S&F plastic laminated sheet 1mm thick, teak finish of size 1200x200 mm on the front side of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified. | 50 | Each | |
65 | 10.03 | c) Removing U/S 1 mm plastic laminated from side of desk and S&F plastic laminated sheet 1mm thick, teak finish of size 535x200 mm on the side of the desk with glue including preparing the surface by scrapping and filling holes / depressions properly complete all as specified | 30 | Each | |
66 | 10.04 | d) Removing worn out complete wooden box frame from existing desk and supply and fix new complete wooden box frame as per drg. | 16 | Each | |
67 | 10.05 | e) M&L for Preparation of surface of steel tubular frame and applying one coat of synthetic enameled paint silver grey colour of the desk complete all as specified and shown on drg. | 95 | Each | |
68 | 10.06 | f) Removing worn out plywood & Supplying and fixing 12 mm thick BWR plywood, exterior grade of size 1200x200 mm on the front side of the desk complete all as specified. | 50 | Each | |
69 | 11.01 | 11. Desk cum bench for two persons: GE (I) N SK 29 of 2000 GE (I) N SK 29 of 2000\n a) Removing existing back rest of desk & Supplying and fixing new back rest of 18 mm thick prelaminated particle board, one side decorative laminated finish and other side plain, exterior grade of size 1200x300 mm with 4 mm thick Teak wood beading duly French polished complete all as specified. | 50 | Each | |
70 | 11.02 | b) Removing existing seat of desk & Supplying and fixing new seat of desk of 18 mm thick prelaminated particle board, one side decorative laminated finish and other side plain, exterior grade of size 1200x350 mm with 4 mm thick Teak wood beading duly French polished complete all as specified. | 50 | Each | |
71 | 11.03 | c) Removing worn out complete wooden box frame including top from existing desk and supply and fixing new wooden box frame including top made of 18mm thick prelaminated particle board one side decorative laminated finish and other side plain exterior grade with teakwood beading of 4mm thick duly French polished complete all as specified and shown on drg. | 50 | Each | |
72 | 11.04 | d) Removing existing desk top of desk & Supplying and fixing new top of desk of 18 mm thick prelaminated particle board, one side decorative laminated finish and other side plain, exterior grade of size 1200x400 mm with 4 mm thick Teak wood beading duly French polished complete all as specified. | 30 | Each | |
73 | 11.05 | e) Removing U/S MS square pipe 300mm long from side rail of back frame of desk and supply and fix new MS Square pipe 300mm long as per drg. | 34 | Each | |
74 | 11.06 | f) Removing U/S MS square pipe 1200mm long from side rail of back frame of desk and supply and fix new MS Square pipe 1200mm long as per drg. | 40 | Each | |
75 | 11.07 | g) Provision of 200 mm long MS clamps made of 3 mm thick MS flat by welding including bending complete all as specifie and directed. | 61 | Each | |
76 | 11.08 | h) Rejoining the joints of MS square tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 60 | Each | |
77 | 11.09 | j) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 120 | Each | |
78 | 11.1 | k) Removing existing 4 mm thick Teak wood beading from and S&F New 4 mm thick Teak wood beading duly French polished complete all whereever required as specified and shown on drg. | 400 | RM | |
79 | 12.01 | 12. Table Office Officer Steel FD-1003, 84(M)\na) Removing U/S Lock with S&F new Lock as per Drg. | 16 | Each | |
80 | 12.02 | b) Removing U/S drawer with S&Fnew drawer as per Drg. | 7 | Each | |
81 | 12.03 | c)Removing of U/S TOP with S&F new TOP as per drg. | 9 | Each | |
82 | 12.04 | d) Removing of U/S Rubber Shoe with S&F new Rubber Shoe as per drg. | 96 | Each | |
83 | 12.05 | e) Removing and replacement of unserviceable legs and S&F new legs made out of 25mm dia MS 1.6mm wall thickness as shown in drg complete all as specified. | 3 | Each | |
84 | 12.06 | f) Removing and replacement of unserviceable stiffener and S&F new stiffener made out of 25mm dia MS 1.6mm wall thickness as shown in drg complete all as specified. | 5 | Each | |
85 | 12.07 | g) Rejoining the joints of MS square tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 16 | Each | |
86 | 13.01 | 13. Table Office Clk Steel & Table Typist Steel FD-1004, 84(M)\na) Removing U/S Lock with S&F New Lock as per Drg. | 25 | Each | |
87 | 13.02 | b) Removing U/S drawer with S&F New drawer as per Drg. | 7 | Each | |
88 | 13.03 | c)Removing of U/S TOP with S&F New TOP as per drg. | 16 | Each | |
89 | 13.04 | d) Removing of U/S Rubber Shoe with S&F New Rubber Shoe as per drg. | 200 | Each | |
90 | 13.05 | e) Rejoining the joints of MS square tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 19 | Each | |
91 | 14.01 | 14. Table computer TP, FD/E6/MAP/03\na) Removing top of table computer and S&F 900x600 mm with 18 mm thick pre-laminated particle board as per existing with pressed plastic beading all round edge of table. | 24 | EACH | |
92 | 14.02 | b) Removing vertical of table computer and S&F 650 x 150 mm with 18 mm thick pre-laminated particle board as per drg. | 12 | EACH | |
93 | 14.03 | c) Removing U/S Key Board Tray including telescopic channel and S&F new Key Board tray with telescopic channels as per drg. | 16 | EACH | |
94 | 14.04 | d) Removing U/S drawer including telescopic channel and S&F new drawer with telescopic channels as per drg. | 16 | EACH | |
95 | 14.05 | e) Removing U/S pull out tray including telescopic channel and S&F new pull out tray with telescopic channels as per drg. | 10 | EACH | |
96 | 14.06 | f) Removing U/S shelf size 450x230mm including vertical partition support and S&F new shelf size 450x230mm ncluding vertical partition support as per drg. | 8 | EACH | |
97 | 14.07 | g) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 30 | EACH | |
98 | 15.01 | 15. Tepoy Verandah FD-255\na) Removing of U/S TOP with S&F New TOP as per drg. | 20 | Each | |
99 | 15.02 | b) Removing of U/S Rubber Shoe with S&F New Rubber Shoe as per drg. | 48 | Each | |
100 | 15.03 | c) Taking out unserviceable MS flat iron supports and providing new flat iron support 25x3 mm, to required length and shape complete all as specified in drg. | 15 | Each | |
101 | 15.04 | d) Rejoining the joints of MS tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 20 | Each | |
102 | 16.01 | 16. Locker BED Side Steel Fd-1029, 257\na)Removing of U/S Hasp & Staple with S&F New Hasp and Staple as per drg. | 60 | Each | |
103 | 16.02 | b)Removing of U/S Handle with S&F New Handle as per drg. | 61 | Each | |
104 | 16.03 | c) Removing of U/S Leg with S&F New Leg as per drg. | 18 | Each | |
105 | 16.04 | d) Removing of U/S shelf with S&F new shelf as per drg. | 20 | Each | |
106 | 16.05 | e) Removing unserviceable existing door shutter of locker steel made out of 1mm thick PBI sheet complete all as specified. | 7 | Each | |
107 | 16.06 | f) Removing worn out unserviceable aluminium rod 20 mm dia and S&F new aluminium rod as per existing all as shown on drawing complete all as specified. | 34 | Each | |
108 | 16.07 | g) Refixing loose shelves with spot welding of broken joints not exceeding 25mm in length. \n\n | 80 | Each | |
109 | 17.01 | 17. Chair School with Hand Board FD/E6/MAP/05\n(a) Removing of board top openable with PVC edging and screwed to 25mm dia hollow steel pipe and S & F new board top openable with PVC edging and screwed to 25mm dia hollow steel pipe as per Drg. | 34 | Each | |
110 | 17.02 | (b) Removing of U/S one piece Seat and Back and S&F New one piece seat and back as per drg. | 7 | Each | |
111 | 18.01 | 18. Table dining steel 900x900 mm FD-1009\na) Removing unserviceable table top & Supplying and fixing new table top, 18 mm thick prelaminated particle board, one side decorative lamination and other side balancing white lamination, Medium density, exterior grade with 4 mm thick Teak wood beading duly French polished complete all as specified. | 25 | Each | |
112 | 18.02 | b) Provision of 300 mm long MS clamps made of 3 mm thick MS flat by welding including bending complete all as specified. | 48 | Each | |
113 | 18.03 | c) Taking down and S&F new rubber shoes to the legs of the table complete all as specified. | 120 | Each | |
114 | 18.04 | d) Rejoining the joints of MS square tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 30 | Each | |
115 | 19.01 | 19. Book Case steel FD - 1028, 90(M)\na) Removing of denting of shelves wherever required in rack steel complete all as specified. | 5 | Each | |
116 | 19.02 | b) Removing worn out shutter & supplying and fixing new shutter made out of MS Sheets as per existing and to made functional for opening by swing up the shutter which can be rolled in complete all as specified. | 2 | Each | |
117 | 19.03 | c) Replacement of unserviceable shelve of book case steel of existing size with new shelve as shown and specified in drg. | 4 | Each | |
118 | 19.04 | d) Removing of unserviceable locks and S&F new lock ISI Marked 75mm as per existing with duplicate keys complete all as specified. | 16 | Each | |
119 | 19.05 | e) Replacement of unserviceable broken glass of book case steel with new glass of existing size as shown in drg complete all as specified. | 12 | Each | |
120 | 19.06 | f) Removing of unserviceable handles 100mm long S&F new handle ISI Marked as per existing complete all as shown in drg and as specified. | 20 | Each | |
121 | 20.01 | 20. Chair Computer Revolving with Arms Fd/E6/MAP/01\na) Removing U/S star Base with caster wheels and S&F New star base including caster wheels as per drg. | 40 | Each | |
122 | 20.02 | b) Removing U/S castor wheel and S&F New castor wheel as per drg. | 70 | Each | |
123 | 20.03 | c) Removing U/S hydrolic gas pump and S&F new hydrolic gas pump as per drg. | 34 | Each | |
124 | 20.04 | d) Removing U/S handle and S&F new handle as per drg. | 48 | Each | |
125 | 20.05 | e) Removing old U/S upholstry of seat with cushion foam and S & F new good quality of upholstry of seat with cushion foam matching with existing as shown in drg. | 15 | Each | |
126 | 20.06 | f) Removing old U/S upholstry of Back with cushion foam andS & F new good quality of upholstry of Back with cushion foam matching with existing as shown in drg. | 15 | Each | |
127 | 20.07 | g) Removing of existing unserviceable tepastry of seat and S&F with new tepastry as shown in drg. | 40 | Each | |
128 | 20.08 | h) Removing of existing unserviceable tepastry of back and S&F with new tepastry as shown in drg. | 40 | Each | |
129 | 21.01 | 21. Charpoy Double Bunk hard top comprising the following items FD-112(M) \na) Welding of broken frame and provide nut and bolt to fix as and when required to restructure the frame properly and applying one coat of synthetic enamel paint black to the frame of charpoy complete as directed as per drg. | 70 | Each | |
130 | 21.02 | b) Removing existing unserviceable plywood top from the Charpoy Double bunk and supplying & fixing new 12 mm thick plywood ISI Marked BWR as per drg. | 120 | Each | |
131 | 22.01 | 22. Table bed side (MAP) FD/E6/MAP/15(R) \na) Removing of existing unserviceable top and S&F with new top of 18mm thick prelaminated particle board, exterior grade as shown in drg. | 10 | Each | |
132 | 22.02 | b) Removing of existing unserviceable sides and S&F with new sides of 18mm thick prelaminated particle board, exterior grade as shown in drg. | 10 | Each | |
133 | 22.03 | c) Removing of existing unserviceable back plywood and S&F with new back plywood 6mm as shown in drg. | 10 | Each | |
134 | 22.04 | d) Removing of existing unserviceable upper drawer and S&F with new upper drawer as shown in drg. | 12 | Each | |
135 | 22.05 | e) Removing of existing unserviceable lower drawer and S&F with new lower drawer as shown in drg. | 12 | Each | |
136 | 22.06 | f) Removing of existing unserviceable handle and S&F with new hadne as shown in drg. | 160 | Each | |
137 | 22.07 | g) Rejoining the joints of MS tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 50 | Each | |
138 | 22.08 | h) Removing of existing unserviceable rubber shoe and S&F with new rubber shoe as shown in drg. | 200 | Each | |
139 | 22.09 | j) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 50 | Each | |
140 | 23.01 | 23. Charpoy IP with hard top FD/MAP-II/01\na) Removing of existing unserviceable long rail and S&F with new long rail of 25x65mm (16 gauge) MS Tube as shown in drg. | 10 | Each | |
141 | 23.02 | b) Removing of existing unserviceable short rail and S&F with new short rail of 25x65mm (16 gauge) MS Tube as shown in drg. | 16 | Each | |
142 | 23.03 | c) Removing of existing unserviceable leg and S&F with new leg of 32x32mm (16 gauge) MS Tube as shown in drg. | 20 | Each | |
143 | 23.04 | d) Removing of existing unserviceable stiffener and S&F with new stiffener of 25x25mm (16 gauge) MS Tube as shown in drg. | 16 | Each | |
144 | 23.05 | e) Removing of damage MS flat cleat and S & F new MS flat cleat 25x60x6 mm duly welded and painted with black paint as per drg. | 32 | Each | |
145 | 23.06 | f) Removing of existing unserviceable rubber shoe and S&F with new rubber shoe as shown in drg. | 200 | Each | |
146 | 23.07 | g) Removing existing unserviceable plywood top and supplying & fixing new 12 mm thick plywood ISI Marked BWR as per drg. | 30 | Each | |
147 | 23.08 | h) Rejoining the joints of MS tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 80 | Each | |
148 | 23.09 | j) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 50 | Each | |
149 | 24.01 | 24. Bed hard (MAP) FD/E6/MAP/08(R) \na) Removing of existing unserviceable long rail and S&F with new long rail of 25x65mm (18 gauge) MS Tube as shown in drg. | 10 | Each | |
150 | 24.02 | b) Removing of existing unserviceable short rail and S&F with new short rail of 25x65mm (18 gauge) MS Tube as shown in drg. | 16 | Each | |
151 | 24.03 | c) Removing of existing unserviceable leg and S&F with new leg of 38x38mm (18 gauge) MS square pipe as shown in drg. | 20 | Each | |
152 | 24.04 | d) Removing of existing unserviceable stiffener and S&F with new stiffener of 25x25mm (18 gauge) MS square pipe as shown in drg. | 20 | Each | |
153 | 24.05 | e) Removing of existing unserviceable 18mm thick prelaminated particle board of Head board/ Foot board and S&F with new 18mm thick prelaminated particle board, exterior grade of Head board/ Foot board including pvc beading as shown in drg. | 32 | Each | |
154 | 24.06 | f) Removing of existing unserviceable rubber shoe and S&F with new rubber shoe as shown in drg. | 200 | Each | |
155 | 24.07 | g) Removing existing unserviceable plywood top and supplying & fixing new 12 mm thick plywood ISI Marked BWR as per drg. | 20 | Each | |
156 | 24.08 | h) Rejoining the joints of MS tube with spot weilding of broken joints not exceeding 25mm in length as and where required as per drg. | 32 | Each | |
157 | 24.09 | j) M&L applying one coat of synthetic enameled paint black colour including preparation of all steel surfaces complete all as specified and shown on drg. | 50 | Each | |
158 | 25 | Preparing of old painted surfaces of the following steel furniture and touching with red oxide primer where necessary preparing surfaces and painting one coat SE paint/ powder coated paint as where required as per drg for Almirah Large Steel FD-1031/67(M) | 250 | Each | |
159 | 26 | All as per item No 25 here-in-above but for Almirah Small/Medium SteelFD-1032/67(M) | 286 | Each | |
160 | 27 | All as per item No 25 here-in-above but for Almirah Larg Steel 1/2 Hx1/2 S FD-1033 | 64 | Each | |
161 | 28 | All as per item No 25 here-in-above but for Almirah Small/Med Steel 1/2 Hx1/2 S FD-1034 | 198 | Each | |
162 | 29 | All as per item No 25 here-in-above but for Locker bed side steel FD-1029,257 | 60 | Each | |
163 | 30 | All as per item No 25 here-in-above but for Chair School with Hand Board FD/E6/MAP/05 | 50 | Each | |
164 | 31 | All as per item No 25 here-in-above but for Chair CB Steel With Arms FD-75(M) | 300 | Each | |
165 | 32 | All as per item No 25 here-in-above but for Table Office Officer Steel FD-1003, 84(M) | 24 | Each | |
166 | 33 | All as per item No 25 here-in-above but forTable Office Clk Steel FD-1004, 84(M) | 52 | Each | |
167 | 34 | All as per item No 25 here-in-above but for Teapoy Verandah FD-255 | 23 | Each | |
168 | 35 | All as per item No 25 here-in-above but for Table 3'x3' steel FD-1009 | 50 | Each | |
169 | 36 | All as per item No 25 here-in-above but for Book Case Steel Fd-90(M) /1028 | 20 | Each | |
170 | 37 | All as per item No 25 here-in-above but for Chair verandah FD-359 | 600 | Each | |
171 | 38 | All as per item No 25 here-in-above but for Stool steel 2' high FD-81M, FD-02 | 30 | Each | |
172 | 39 | All as per item No 25 here-in-above but for Book Shelf open Small Steel FD-69M | 12 | Each | |
173 | 40 | All as per item No 25 here-in-above but for Chair CB Steel w/o Arms DF-75M | 70 | Each | |
174 | 41 | All as per item No 25 here-in-above but for Rack Shoe Steel FD/E6/MAP/02R | 40 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail