Directorate Of Municipal Administration-DMA has published Motor Maintenance Works For Kopargaon Municipal Council ( Annual 2021-22 ) - 1 Name Of Work:- Repairs To 50 H.Pup C / F Pumpdismentalling Of Centrifugal Motor Pump Set From Pump House. 2 Providing & Fixing Pump Shaft ( En8 ) 3 Providing & F. Submission Date for this Tender is 21-04-2021. Bolts Tenders in kopargaon m c Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Name of Work:- Repairs to 50 H.PUP C/F Pump Dismentalling of Centrifugal motor pump set from pump house. |
2 | Providing & fixing pump shaft (EN8) |
3 | Providing & fixing shaft sleeve. SS |
4 | Providing & fixing lantering gun metal. |
5 | Providing & fixing stufling box Bush C.I. |
6 | Providing & fixing coupling spacer C.I. |
7 | Providing & fixing couplingstar rubber |
8 | Providing & fixing water deflector. |
9 | Providing & fixing bearing lock nut. |
10 | Providing & fixing grafite , rubber packing. O ring etc. |
11 | Removing bearing & rematching the housing to the brg. Size. |
12 | Assembling the pump with above parts. |
13 | Providing & fixing Impeller (CI) |
14 | Providing & fixing Impeller nut ( G.M.) |
15 | Test & trial of the set @ site as per requirement. |
16 | Replacement of motor ball bearing & greasing etc. |
17 | Name of Work:- Repairs to 60 H.PUP C/F Pump Dismentalling of Centrifugal motor pump set from pump house. |
18 | Providing & fixing pump shaft (EN8) |
19 | Providing & fixing shaft sleeve. SS |
20 | Providing & fixing lantering gun metal. |
21 | Providing & fixing stufling box Bush C.I. |
22 | Providing & fixing coupling spacer C.I. |
23 | Providing & fixing couplingstar rubber |
24 | Providing & fixing water deflector. |
25 | Providing & fixing bearing lock nut. |
26 | Providing & fixing grafite , rubber packing. O ring etc. |
27 | Removing bearing & rematching the housing to the brg. Size. |
28 | Assembling the pump with above parts. |
29 | Providing & fixing Impeller (CI) |
30 | Providing & fixing Impeller nut ( G.M.) |
31 | Test & trial of the set @ site as per requirement. |
32 | Replacement of motor ball bearing & greasing etc. |
33 | Name of Work:- Repairs to 100 H.PUP C/F Pump Dismentalling of Centrifugal motor pump set from pump house. |
34 | Providing & fixing pump shaft (EN8) |
35 | Providing & fixing shaft sleeve. SS |
36 | Providing & fixing lantering gun metal. |
37 | Providing & fixing stufling box Bush C.I. |
38 | Providing & fixing coupling spacer C.I. |
39 | Providing & fixing couplingstar rubber |
40 | Providing & fixing water deflector. |
41 | Providing & fixing bearing lock nut. |
42 | Providing & fixing grafite , rubber packing. O ring etc. |
43 | Removing bearing & rematching the housing to the brg. Size. |
44 | Assembling the pump with above parts. |
45 | Providing & fixing Impeller (CI) |
46 | Providing & fixing Impeller nut ( G.M.) |
47 | Test & trial of the set @ site as per requirement. |
48 | Replacement of motor ball bearing & greasing etc. |
49 | Name of Work:- Repairs to 100 H.P C/FMotor Rewinding of induction motor including labour & material charges. |
50 | Motor ball bearing Cleaning & greasing etc. |
51 | Dismelting & fitting of electrical motor from pump house. |
52 | Nut bolt stud for motor. |
53 | Cleaning & overhauling greasing , warnishing the motor & painting. |
54 | Replacement Damaged turminal connection plate & lugs. |
55 | Test & trial of the set @ site as per requirement. |
56 | Name of Work:- Repairs to 60 H.P C/FMotor Rewinding of induction motor including labour & material charges. |
57 | Motor ball bearing Cleaning & greasing etc. |
58 | Dismelting & fitting of electrical motor from pump house. |
59 | Nut bolt stud for motor. |
60 | Cleaning & overhauling greasing , warnishing the motor & painting. |
61 | Replacement Damaged turminal connection plate & lugs. |
62 | Test & trial of the set @ site as per requirement. |
63 | Name of Work:- Repairs to 50 H.P C/FMotor Rewinding of induction motor including labour & material charges. |
64 | Motor ball bearing Cleaning & greasing etc. |
65 | Dismelting & fitting of electrical motor from pump house. |
66 | Nut bolt stud for motor. |
67 | Cleaning & overhauling greasing , warnishing the motor & painting. |
68 | Replacement Damaged turminal connection plate & lugs. |
69 | Test & trial of the set @ site as per requirement. |
70 | Name of Work:- Overhaulingto 100 H.PC/FMotor Dismelting & fitting of electrical motor from pump house. |
71 | Dismetling of Coupling & Motor |
72 | Motor Water Wash |
73 | Washing of Stator & Roter |
74 | Pre Heating (Oven) of Stator & Roter |
75 | Gelcoting, Painting Bearing Cleaning and Grising |
76 | Test & trial of the set @ site as per requirement. |
77 | Name of Work:- Overhauling to 60 H.PC/FMotor Dismelting & fitting of electrical motor from pump house. |
78 | Dismetling of Coupling & Motor |
79 | Motor Water Wash |
80 | Washing of Stator & Roter |
81 | Pre Heating (Oven) of Stator & Roter |
82 | Gelcoting, Painting Bearing Cleaning and Grising |
83 | Test & trial of the set @ site as per requirement. |
84 | Name of Work:- Overhauling to 50 H. PC/FMotor Dismelting & fitting of electrical motor from pump house. |
85 | Dismetling of Coupling & Motor |
86 | Motor Water Wash |
87 | Washing of Stator & Roter |
88 | Pre Heating (Oven) of Stator & Roter |
89 | Gelcoting, Painting Bearing Cleaning and Grising |
90 | Test & trial of the set @ site as per requirement. |
91 | Repairs Reconditioning of 50 HP ATS Dismentling of 50 HP ATS |
92 | Replacement of CT Oprated Relay Assembly 50 HP |
93 | Rewinding of Auto Transformer50 HP |
94 | Providing & Fixing terminal plate for Auto Transformer 50 HP |
95 | Providing & Fixing Single Phase Preventor for Auto Starter |
96 | Replacement of Timer for ATS Starter |
97 | Replacement of auxillary switch for Contactor |
98 | Replacement of 115 A Contactor |
99 | Replacement of 80 A Contactor |
100 | Internal Wiring for Starter 50 HP |
101 | Providing & Fixing Multi Strand Copper Singal Core Flexible Cable |
102 | Provinding & Fixing Copper Cable Lugs |
103 | Digital Ammeter |
104 | Digital Voltmeter |
105 | Ammeter Selector Switch |
106 | Indicating Lamp LED in RYB |
107 | Providing & Fixing alluminium bus bar as per |
108 | Assembling of Starter with Connection & Trial of the set |
109 | Repairs Reconditioning of 100 HP ATS Dismentling of 100 HP ATS |
110 | Replacement of CT Oprated Relay Assembly 100 HP |
111 | Rewinding of Auto Transformer100 HP |
112 | Providing & Fixing terminal plate for Auto Transformer 100 HP |
113 | Providing & Fixing Single Phase Preventor for Auto Starter |
114 | Replacement of Timer for ATS Starter |
115 | Replacement of auxillary switch for Contactor |
116 | Replacement of 200 A Contactor |
117 | Replacement of 115 A Contactor |
118 | Internal Wiring for Starter 100 HP |
119 | Providing & Fixing Multi Strand Copper Singal Core Flexible Cable |
120 | Provinding & Fixing Copper Cable Lugs |
121 | Digital Ammeter |
122 | Digital Voltmeter |
123 | Ammeter Selector Switch |
124 | Indicating Lamp LED in RYB |
125 | Providing & Fixing alluminium bus bar as per |
126 | Assembling of Starter with Connection & Trial of the set |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail