Indian Oil Corporation Limited-IOCL has published Dm Zld Cpu Package Dm Plant With Zld Package And Cpu Package For Lupech J18 Project. Submission Date for this Tender is 30-06-2021. Demineralization Plant Tenders in Vadodara Gujarat. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Apr-2021 | Corrigendum_1 | Other | 19-05-2021 |
2 | 05-May-2021 | PRebid_TQ_Response_1 | Other | 19-05-2021 |
3 | 08-May-2021 | Technical Addendum_01 | Other | 19-05-2021 |
4 | 10-May-2021 | CQ Response_01 | Other | 19-05-2021 |
5 | 10-May-2021 | Corrigendum_2 | Date | 02-06-2021 |
6 | 21-May-2021 | Addendum_02_Technical | Other | 02-06-2021 |
7 | 22-May-2021 | Prebid_TQ_Response_2 | Other | 02-06-2021 |
8 | 26-May-2021 | Corrigendum-03 | Date | 09-06-2021 |
9 | 30-May-2021 | Addendum_3_Commericial | BOQ | 09-06-2021 |
10 | 02-Jun-2021 | CORRIGENDUM_4 | Date | 23-06-2021 |
11 | 21-Jun-2021 | Corrigendum_5 | Date | 30-06-2021 |
Name of Work: 3 X 250 M3/HR RO DM PLANT WITH ZLD PACKAGE, 2 X 250 M3/HR CPU PACKAGE INCLUDING COMMON UTILITY / MS BLOCK SUBSTATION FOR PETROCHEMICAL AND LUBE INTEGRATION PROJECT “LUPECH” (J-18) PROJECT AT IOCL GUJARAT REFINERY, INDIA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Process Design and Engineering, Detailed Design and Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Site development and enabling jobs, Demolition/ Dismantling/Re-routing works, Topography Survey and Soil Investigation, underground scanning and co-ordination for the same with Owner/PMC, Complete Procurement (including all supply of all items, equipment and construction material, chemicals, catalysts, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment at site, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, supply and handing over of mandatory spares and consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of 3 x 250 m3/hr RO DM PLANT WITH ZLD PACKAGE, 2 x 250 m3/hr CPU PACKAGE INCLUDING COMMON UTILITY / MS BLOCK SUBSTATION for Petrochemical and Lube Integration Project “LuPech” (J-18) Project at IOCL Gujarat Refinery, India, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Catalysts (if any), Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities. | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | FOREIGN CURRENCY PART | BI01010001010000000000000515BI0100001113 | 1 | Lumpsum |
3 | 1.02 | INDIAN CURRENCY PART | BI01010001010000000000000515BI0100001114 | 1 | Lumpsum |