}

Supply Of Three Phase Four Wire Trivector Energy 0 . 2S Accuracy Class 33Kv Abt Meter With Installation Accessories , And Also Installation And Commissioning And System Maintenance Of Abt Metering System For Five Years Under Adp Head, JBVNL-Jharkhand

Jharkhand State Electricity Board-JBVNL has published Supply Of Three Phase Four Wire Trivector Energy 0 . 2S Accuracy Class 33Kv Abt Meter With Installation Accessories , And Also Installation And Commissioning And System Maintenance Of Abt Metering System For Five Years Under Adp Head. Submission Date for this Tender is 05-07-2021. Bolts Tenders in JBVNL Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

27503755
Corrigendum : Supply Of Three Phase Four Wire Trivector Energy 0 . 2S Accuracy Class 33Kv Abt Meter With Installation Accessories , And Also Installation And Commissioning And System Maintenance Of Abt Metering System For Five Years Under Adp Head
Open Tender
Indian
Jharkhand
JBVNL
05-07-2021

Tender Details

Supply Of Three Phase Four Wire Trivector Energy 0 . 2S Accuracy Class 33Kv Abt Meter With Installation Accessories , And Also Installation And Commissioning And System Maintenance Of Abt Metering System For Five Years Under Adp Head , Electrical Items : , 33 Kv / 110V , Three Phase Four Wire , Accuracy Class 0 . 2S Dlms Compliant Abt Meter , 33Kv / 110V , Three Phase Four Wire , Accuracy Class 0 . 2S Ct-Pt Combined Metering Unit For Feeder , Metering Panel , Control Cable 2 . 5 Sq Mm Copper , 12 Core Armoured , Structure For 33Kv Metering Unit . , P . G Clamp 3 Bolt . , Gi Strip For Earthing , Acsr Panther Conductor . , 33 Kv Pin Insulator , Dcu With Modem , Installation Cost Abt Meters , Installation Cost Of Data Concentrator Unit ( Dcu ) With Modem , Installation Cost Of Metering Panel , Installation Cost Of Metring Unit Including Structure , Cost Of Maintainance For Five Years Including All Requirments As Per Scope Of Work Of Nit

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 26-Apr-2021 1st Extension Notice Date 25-05-2021
2 26-May-2021 2nd Time Extension Date 21-06-2021
3 17-Jun-2021 AMENDMENTS Technical Bid 21-06-2021
4 22-Jun-2021 3rdtimextension Date 05-07-2021

Key Value

Document Fees
INR 11800 /-
EMD
INR 3900000.0 /-
Tender Value
INR 19 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail