}

Consultancy Service For Re-Construction Of Following Narrow Bridges In The State Of Himachal Pradesh Chikni-Iv Bridge At Rd 37/722 On Nh-21A , Kundlu-I Bridge At Rd 48/918 On Nh-21A , Mahadev-Iv Khad Bridge At Rd 44/435 On Nh-21A , Bathri Bridge ( 30, Solan-Himachal Pradesh

Ministry Of Road Transport And Highways has published Consultancy Service For Re-Construction Of Following Narrow Bridges In The State Of Himachal Pradesh Chikni-Iv Bridge At Rd 37/722 On Nh-21A , Kundlu-I Bridge At Rd 48/918 On Nh-21A , Mahadev-Iv Khad Bridge At Rd 44/435 On Nh-21A , Bathri Bridge ( 30. Submission Date for this Tender is 19-04-2021. Laser Printers Tenders in Solan Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27389819
Corrigendum : Consultancy Service For Re-Construction Of Following Narrow Bridges In The State Of Himachal Pradesh Chikni-Iv Bridge At Rd 37/722 On Nh-21A , Kundlu-I Bridge At Rd 48/918 On Nh-21A , Mahadev-Iv Khad Bridge At Rd 44/435 On Nh-21A , Bathri Bridge ( 30
Open Tender
Indian
Himachal Pradesh
Solan
19-04-2021

Tender Details

Consultancy Service For Re-Construction Of Following Narrow Bridges In The State Of Himachal Pradesh Chikni-Iv Bridge At Rd 37/722 On Nh-21A , Kundlu-I Bridge At Rd 48/918 On Nh-21A , Mahadev-Iv Khad Bridge At Rd 44/435 On Nh-21A , Bathri Bridge ( 30M ) , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Bridge Engineer , Bridge Structural Engineer , Highway Cum Pavement Engineer , Material-Cum-Geotechnical Engineer- Geologist , Senior Survey Engineer , Senior Geologist , Environmental Specialist , Quantity Surveyor/ Documentation Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Position , Position , Position , Position , Position , Position , Position , Support Staff ( Inclusive Of Per Diem Allowance ) Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Hired By The Consultant Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . , Duty Travel To Site ( Fixed Costs ) , Trips , Office Rent ( Fixed Costs ) The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc . , Office Rent , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Report ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report& Rap , Final Environmental Assessment Report& Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Document , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) & 3G Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment ( Gps , Total Station , Auto Level Etc . ) And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile/ Aerial Lidar Or Better Technology , Investigation ( Fixed Cost ) ( Lumpsum ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub Grade Investuigation , Traffic Survey , Socio Economic And Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) ( Rate/M ) , A ) In Soil Other Than Hard Rock , B ) In Hard Rock , Net Work Survey And Gpr , Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority . , Gpr Survey For Detection Of Under Ground Utilities , Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And/Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval , Land Acquisition Team Including Support Staff And Logistics/Transportation , Ex-Land Revenue Inspector/Officer Or Equivalent , Ex-Kanoogo/Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist ( 2 Nos . ) , Peon , Logistics For Land Acquisition Team , Computer Including NecessaryPeripherals ( 2 Nos . ) , Printers ( 2 Nos . ) , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , Estimate Of Expatriateconsultants ( Name And Position To Be Filled In Below Columns By The Bidder ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Moblization And Demoblization- International Airfares ( Fixed Costs ) ( To Be Filled By Bidders In Below Columns ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Moblization And Demoblization-Inland Travel In Home Country ( Fixed Costs ) , Other Miscellaneous Expenses ( Like Da , Internal Travel Expenses Other Incidentals ) ( Fixed Cost )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Mar-2021 Corrigendum and Addendum Technical Bid 19-04-2021

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Consultancy Service for Re-construction of following narrow bridges in the state of Himachal Pradesh:- (i) Chikni-IV Bridge at RD 37/722 on NH-21A (ii) Kundlu-I Bridge at RD 48/918 on NH-21A(iii) Mahadev-IV Khad Bridge at RD 44/435 on NH-21A (iv) Bathri Bridge (30m) at RD 71/00 on NH-154A (v) Bharmani Nallah Bridge (25m) at RD 170/200 on NH-154A (vi) Bhatti Nallah (170m) at RD 106/530 on NH-154A (vii) Keru Bridge (60m) at RD 42/410 on NH-154A (viii) Bhera Khad Bridge at KM 254/040 on NH-22 (ix) Machhada Khad Bridge at KM 259/295 on NH-22 (x) Khekhar Nallah Bridge at KM 147/780 on NH-22.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader cum Senior Bridge Engineer BI01010001010000000000000515BI0100001113 10 Month
3 1.02 Bridge Structural Engineer BI01010001010000000000000515BI0100001114 6 Month
4 1.03 Highway cum Pavement Engineer BI01010001010000000000000515BI0100001115 10 Month
5 1.04 Material-cum-Geotechnical Engineer- Geologist BI01010001010000000000000515BI0100001116 10 Month
6 1.05 Senior Survey Engineer 6 Month
7 1.06 Senior Geologist 6 Month
8 1.07 Environmental Specialist 6 Month
9 1.08 Quantity Surveyor/ Documentation Expert 4 Month
10 2 Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
11 2.01 Position 1 Lumpsum
12 2.02 Position 1 Lumpsum
13 2.03 Position 1 Lumpsum
14 2.04 Position 1 Lumpsum
15 2.05 Position 1 Lumpsum
16 2.06 Position 1 Lumpsum
17 2.07 Position 1 Lumpsum
18 3 Support Staff (inclusive of per diem allowance)\nNote: To be assessed by consultant as per requirement of assignment
19 3.01 Office Manager 1 Lumpsum
20 3.02 Typist 1 Lumpsum
21 3.03 Office Boy 1 Lumpsum
22 3.04 Night Watchman 1 Lumpsum
23 4 Transportation (Fixed Costs)
24 4.01 The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. 1 Lumpsum
25 5 Duty Travel to Site (Fixed Costs)
26 5.01 Trips 1 Lumpsum
27 6 Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc.
28 6.01 Office Rent 1 Lumpsum
29 7 Office Supplies, Utilities and Communication (Fixed Costs)
30 7.01 Office Supplies Drafting 1 Lumpsum
31 7.02 Supplies Computer 1 Lumpsum
32 7.03 Running Costs 1 Lumpsum
33 7.04 Domestic and International Communication 1 Lumpsum
34 8 Office Furniture and Equipment (Rental)
35 8.01 Office Furniture and Equipment 1 Lumpsum
36 9 Reports and Document Printing
37 9.01 Monthly Report (3 copies per month) 30 Nos.
38 9.02 Inception Report & QAP 3 Nos.
39 9.03 Environment and Social Impact Screening Report 4 Nos.
40 9.04 Draft Feasibility Report 4 Nos.
41 9.05 Final Feasibility Report 6 Nos.
42 9.06 Strip Plan with L.A. Reports 6 Nos.
43 9.07 Draft LA and Clearances I Report 4 Nos.
44 9.08 Final LA and Clearances I Report 4 Nos.
45 9.09 Draft Environmental Assessment report& RAP 4 Nos.
46 9.1 Final Environmental Assessment report& RAP 6 Nos.
47 9.11 Draft Detailed Design Report & Drawings etc. 4 Nos.
48 9.12 Draft EMP 4 Nos.
49 9.13 Draft Bidding Document 4 Nos.
50 9.14 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. 6 Nos.
51 9.15 Final EMP 6 Nos.
52 9.16 Final Bidding Documents 6 Nos.
53 9.17 Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) 9 Nos.
54 9.18 LA & Clearances II Report 6 Nos.
55 10 Survey and Investigation A. Topographical Survey (Fixed Rate)
56 10.01 Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. 1 Complete JoB
57 10.02 Detailed topographic surveys using mobile/ aerial LiDAR or better technology 1 Complete JoB
58 11 Investigation (Fixed cost)(lumpsum)
59 11.01 Road and Bridge Inventory 1 LumpSum
60 11.02 FWD Test And Pavement Evaluation 1 LumpSum
61 11.03 Roughness Survey 1 LumpSum
62 11.04 Axle load Survey 1 LumpSum
63 11.05 Material Survey and Investigation 1 LumpSum
64 11.06 Sub grade Investuigation 1 LumpSum
65 11.07 Traffic Survey 1 LumpSum
66 11.08 Socio economic and Census Survey/Studies 1 LumpSum
67 11.09 Land Acquisition Studies 1 LumpSum
68 11.1 Any other investigations/surveys 1 LumpSum
69 11.11 Sub-Soil Investigation (Boring) (Rate/m)
70 11.12 a) In soil other than hard rock 1500 Meter
71 11.13 b) In hard rock 200 Meter
72 11.14 Net Work Survey and GPR
73 11.15 Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. 1 Complete JoB
74 11.16 GPR Survey for detection of under ground utilities 1 Complete JoB
75 12 Fixing Boundary pillars
76 12.01 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval 1 Lumpsum
77 13 Land Acquisition Team including support staff and logistics/transportation
78 13.01 Ex-Land Revenue Inspector/Officer or equivalent\n 8 Month
79 13.02 Ex-Kanoogo/Girdwar or equivalent 8 Month
80 13.03 Ex-Patwari or equivalent\n 8 Month
81 13.04 Typist (2 nos.) 8 Month
82 13.05 Peon 8 Month
83 14 Logistics for Land acquisition Team
84 14.01 Computer including necessary\nperipherals (2 nos.)\n 8 Month
85 14.02 Printers (2 nos.) 8 Month
86 14.03 Vehicles (Bolero or equivalent)\nwith monthly running limit of 4000 km\n 8 Month
87 15 Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)
88 15.01 Position (Value= 0)
89 15.02 Position (Value= 0)
90 15.03 Position (Value= 0)
91 15.04 Position (Value= 0)
92 15.05 Position (Value= 0)
93 15.06 Position (Value= 0)
94 15.07 Position (Value= 0)
95 15.08 Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)
96 15.09 Position (Value= 0)
97 15.1 Position (Value= 0)
98 15.11 Position (Value= 0)
99 15.12 Position (Value= 0)
100 15.13 Position (Value= 0)
101 15.14 Position (Value= 0)
102 15.15 Position (Value= 0)
103 16 Moblization and Demoblization-Inland Travel in Home country (Fixed Costs) 1 LumpSum
104 17 Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) 1 LumpSum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail