}

Preparation Of Dpr For New Alignment For 2Lanes With Ps Configuration Of Stretch From Km 95 . 200 Near Ssb Camp Ausani Village To Near Up Border On Nh727 In The Boundary Zone Of Valmiki Wildlife Sanctuary Along Gandak River Bank In Bihar State, SSB Camp Ausani village-Bihar

Ministry Of Road Transport And Highways has published Preparation Of Dpr For New Alignment For 2Lanes With Ps Configuration Of Stretch From Km 95 . 200 Near Ssb Camp Ausani Village To Near Up Border On Nh727 In The Boundary Zone Of Valmiki Wildlife Sanctuary Along Gandak River Bank In Bihar State. Submission Date for this Tender is 12-04-2021. Keys Tenders in SSB Camp Ausani village Bihar. Bidders can get complete Tender details and download the document.




Tender Notice

27381774
Preparation Of Dpr For New Alignment For 2Lanes With Ps Configuration Of Stretch From Km 95 . 200 Near Ssb Camp Ausani Village To Near Up Border On Nh727 In The Boundary Zone Of Valmiki Wildlife Sanctuary Along Gandak River Bank In Bihar State
Open Tender
Indian
Bihar
SSB Camp Ausani village
12-04-2021

Tender Details

Preparation Of Dpr For New Alignment For 2Lanes With Ps Configuration Of Stretch From Km 95 . 200 Near Ssb Camp Ausani Village To Near Up Border On Nh727 In The Boundary Zone Of Valmiki Wildlife Sanctuary Along Gandak River Bank In Bihar State , Key Personnel : , Team Leader Cum Senior Bridge Engineer , Bridge Structural Engineer , Highway Cum Pavement Engineer , Material Cum Geotechnical Engineer - Geologist , Senior Survey Engineer , Senior Geologist , Environmental Specilist , Quantity Surveyor / Documentation Expert , Sub-Professional Staff : ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub Professional Be A Fresh Graduate ) , . . , . . , . . , . . , . . , . . , . . , Support Staff : , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental Drivers Operation , Maintenance , Repairs , Insurance Etc . , A . For Use Of Consultant , Duty Travel To Site ( Fixed Costs ) : , Office Rent ( Fixed Costs ) The Rent Includes Maintenance , Cleaning , Repairing Etc . , , . . , Office Supplies , Utilities And Communications ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Ecquipment ( L . S ) , Reports & Documents Printing ( For Clubbed Projects ) , Monthly Report ( 3Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With La Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report & Rap , Final Environmental Assessment Report And Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp . , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Better Technology , Investigation ( Fixed Cost ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffice Survey , Socio-Economic & Census Survey / Studies , Land Acquisition Studies , Any Other Investigations / Surveys , Sub-Soil Investigation ( Boring ) , A ) Boring In All Type Of Soils ( Other Than Hard Rock ) , B ) Boring In Hard Rock , Network Survey And Gpr , Network Survey Of The Existing Highways As A Repository For Civil Works As Per Directions From Authority , Gpr Survey For Detection Of Under Ground Utilities , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed Atan Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . ( Lumpsum ) , Land Acquisition Team Including Support Staff And Logistics / Transportation , Ex-Land Revenue Inspector / Officer Or Equivalent , Ex-Kanoogo / Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , B . Logistics For Land Acquisition Team , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , Estimate Of Costs For Expatriate Consultants ( In Indian Rupees ) , I . Remuneration Of Expatriate Staff Including Per Diem Allwances , Ii . Mobiliation And Demobilization , 1 . International Airfares ( Fixed Costs ) , Total Cost Net Of Tax: , I . Income Tax ( Expatriate Staff ) , Ii . Other Taxes / Duties ( If Any ) Specify Clearly , Goods And Service Taxes @ 18%

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Preparation of Detailed Project Report for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727 – in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve along Gandak river bank in Bihar State.)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 KEY PERSONNEL : item1
2 1.01 Team Leader cum Senior Bridge Engineer item2 10 Nos
3 1.02 Bridge Structural Engineer item3 10 Nos
4 1.03 Highway cum Pavement Engineer item4 150 Nos
5 1.04 Material cum Geotechnical Engineer - Geologist item5 12 Nos
6 1.05 Senior Survey Engineer item6 1 Nos
7 1.06 Senior Geologist item7 10 Nos
8 1.07 Environmental Specilist item8 10 Nos
9 1.08 Quantity Surveyor / Documentation Expert item9 150 Nos
10 2 SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) item12
11 2.01 .. item13 10 Nos
12 2.02 .. item14 10 Nos
13 2.03 .. item15 150 Nos
14 2.04 .. item16 12 Nos
15 2.05 .. item17 1 Nos
16 2.06 .. item18 10 Nos
17 2.07 .. item19 10 Nos
18 3 SUPPORT STAFF : item20
19 3.01 Office Manager item21 10 Nos
20 3.02 Typist item22 10 Nos
21 3.03 Office Boy item23 150 Nos
22 3.04 Night Watchman item24 12 Nos
23 4 Transportation (Fixed Costs) item25
24 4.01 The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant item26 10 Nos
25 5 Duty Travel to Site(Fixed Costs): item27 1 Nos
26 6 Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc., item28
27 6.01 .. item29 10 Nos
28 7 OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) item30
29 7.01 Office Supplies item31 10 Nos
30 7.02 Drafting Supplies item32 10 Nos
31 7.03 Computer Running Costs item33 150 Nos
32 7.04 Domestic and International Communication item34 12 Nos
33 8 OFFICE FURNITURE AND EQUIPMENT (Rental) item35
34 8.01 Office Furniture and Ecquipment ( L.S) item36 10 Nos
35 9 REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects) item37
36 9.01 Monthly report (3copies per Month) item38 10 Nos
37 9.02 Inception Report & QAP item39 10 Nos
38 9.03 Environment and Social Impact Screening Report item40 150 Nos
39 9.04 Draft Feasibility Report item41 12 Nos
40 9.05 Final Feasibility Report item42 1 Nos
41 9.06 Strip Plan with LA Reports item43 10 Nos
42 9.07 Draft LA and Clearances I Report item44 10 Nos
43 9.08 Final LA and Clearances I Report item45 150 Nos
44 9.09 Draft Environmental Assessment Report & RAP item46 12 Nos
45 9.1 Final Environmental Assessment Report and RAP item47 1 Nos
46 9.11 Draft Detailed Design Report & Drawings etc. item48 10 Nos
47 9.12 Draft EMP item49 10 Nos
48 9.13 Draft Bidding Documents item50 150 Nos
49 9.14 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. item51 12 Nos
50 9.15 Final EMP. item52 1 Nos
51 9.16 Final Bidding Documents item53 10 Nos
52 9.17 Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) item54 10 Nos
53 9.18 LA & Clearances II Report item55 150 Nos
54 10 Survey and Investigation item56
55 10.01 Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. item57 10 Nos
56 10.02 Detailed topographic surveys using mobile / aerial LiDAR or better Technology item58 10 Nos
57 11 Investigation (Fixed Cost) item59
58 11.01 Road and Bridge Inventory item60 10 Nos
59 11.02 FWD Test and Pavement Evaluation item61 10 Nos
60 11.03 Roughness Survey item62 150 Nos
61 11.04 Axle Load Survey item63 12 Nos
62 11.05 Material Survey and Investigation item64 1 Nos
63 11.06 Sub-grade Investigation item65 10 Nos
64 11.07 Traffice Survey item66 10 Nos
65 11.08 Socio-economic & Census Survey/Studies item67 150 Nos
66 11.09 Land Acquisition Studies item68 12 Nos
67 11.1 Any other Investigations/Surveys item69 1 Nos
68 12 Sub-Soil Investigation (Boring) item70
69 12.01 a) Boring in all type of soils (other than hard rock) item71 10 Nos
70 12.02 b) Boring in hard rock item72 10 Nos
71 13 Network Survey and GPR item73
72 13.01 Network Survey of the existing Highways as a repository for civil works as per directions from Authority item74 10 Nos
73 13.02 GPR Survey for detection of under ground utilities item75 10 Nos
74 14 Cost of Supply and Fixing Boundary pillars item76
75 14.01 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) item77 10 Nos
76 15 Land Acquisition Team including support staff and logistics/ transportation item78
77 15.01 Ex-Land Revenue Inspector/ Officer or equivalent item79 10 Nos
78 15.02 Ex-Kanoogo/Girdwar or equivalent item80 10 Nos
79 15.03 Ex-Patwari or Equivalent item81 10 Nos
80 15.04 Typist item82 10 Nos
81 15.05 Peon item83 10 Nos
82 16 B. Logistics for Land Acquisition Team item84
83 16.01 Computer including necessary peripherals item85 10 Nos
84 16.02 Printers item86 10 Nos
85 16.03 Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km item87 10 Nos
86 17 Estimate of Costs for Expatriate Consultants (in Indian Rupees) item88
87 17.01 I. Remuneration of Expatriate Staff including per diem allwances item89 10 Nos
88 17.02 II. Mobiliation and Demobilization item90 10 Nos
89 17.03 1. International Airfares (Fixed Costs) item91 10 Nos
90 18 Total Cost Net of Tax: item92
91 18.01 I. Income Tax (Expatriate Staff) item93 10 Nos
92 18.02 II. Other Taxes/ duties (if any) Specify Clearly item94 10 Nos
93 19 Goods and Service Taxes @ 18% item95 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail