Repair/Maint And Duct Cleaning Of Central Ac Plants Packages Type Ac Plants Air Conditioning And Cooling Appliances At Ch ( Cc ) , Base Hosp , Cmdc And Other Area Of Age ( E/M ) Hosp Under Ge ( E/M ) Lucknow, Lucknow-Uttar Pradesh

Military Engineer Services-MES has published Repair/Maint And Duct Cleaning Of Central Ac Plants Packages Type Ac Plants Air Conditioning And Cooling Appliances At Ch ( Cc ) , Base Hosp , Cmdc And Other Area Of Age ( E/M ) Hosp Under Ge ( E/M ) Lucknow. Submission Date for this Tender is 29-03-2021. Air Conditioner Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27178797
Corrigendum : Repair/Maint And Duct Cleaning Of Central Ac Plants Packages Type Ac Plants Air Conditioning And Cooling Appliances At Ch ( Cc ) , Base Hosp , Cmdc And Other Area Of Age ( E/M ) Hosp Under Ge ( E/M ) Lucknow
Open Tender
Indian
Uttar Pradesh
Lucknow
29-03-2021

Tender Details

Repair/Maint And Duct Cleaning Of Central Ac Plants Packages Type Ac Plants Air Conditioning And Cooling Appliances At Ch ( Cc ) , Base Hosp , Cmdc And Other Area Of Age ( E/M ) Hosp Under Ge ( E/M ) Lucknow

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-Mar-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 29-03-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 60000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: REPAIR/MAINT AND DUCT CLEANING OF CENTRAL AC PLANTS PACKAGES TYPE AC PLANTS AIR CONDITIONING AND COOLING APPLIANCES AT CH (CC), BASE HOSP, CMDC & OTHER AREA OF AGE (E/M) HOSP UNDER GE (E/M) LUCKNOW.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Attending the complaint of AC PLANT,Walking Cooler, by Refg mechanic /electrician/ technician for non functioning part of compressor, Blower motor , compressor pump, chiller pump , CT fan ,AHU Electric panel and all parts of AC Plant at any location,any capacity make and model and rectified the same all as directed at site.\nNote : - (i) Complaint Should be attended immediately within one hrs & to be Rectified the same day at the earliest without effecting of services . (ii) Complaint should be attended 24 hrs through phone , (iii) Complaint should be detail / attended by Specified Electrician / technician / Mechanic having knowledge of AC Plant (iv) Contractor will provide all necessary T&P for attending and rectified the complaints. 120 Each
2 2 M&L for 3 x 15 TR capacity AC plant descaling of all condensor tubes of central AC plant by disconnecting the condensor from the system, cleaning by descaling pump of suitable capacity of 110 ft head using descaling solution of Make:-MAIC / HIBIRD or Hydrochloric acid 20%, cleaning the system through cooling tower by using descaling solution, cleaning condensor tubes by nylon brushes & mild steel rods of suitable size, renewal of suction water filter etc complete all as specified and directed. Note:- T&P such as pumps, tube & descaling solution etc shall be arranged by the contractor at his own cost. 1 Each Job
3 3 All as per item No 3 but 3x9 TR capacity plant (03 Nos Condensor tube set ) 1 Each Job
4 4 All as per item No 3 but 2x7.5 TR capacity plant (02 condensor tube set ) 1 Each Job
5 5 All as per item No 3 but 3x40 TR capacity plant (03 condensor tube set ) 1 Each Job
6 6 All as per item No 3 but 3x80 TR capacity (03 condensor tube set ) 1 Each Job
7 7 All as per item No 3 but 3X37.5 TR capacity (03 condensor tube set ) 1 Each Job
8 8 All as per item No 3 but 1X60 TR capacity (01 condensor tube set ) 1 Each Job
9 9 All as per item No 3 but 3X50 TR capacity (03 condensor tube set ) 1 Each Job
10 10 Carrying out pressure leak testing by nitrogen gas of the system of AC plant for leak proof valve joints, seal & other connected controls etc. including identifying & rectifying of leaks, defects (if any) & maintaining constant pressure of 160 LBS PSI on low side & 200 PSI on high side at least for 24 Hrs of any size and capacity of central AC plant complete all as specified and directed. :- (Note: The arrangement of T&P & nitrogen gas shall be contractors responsibility). 9 Each Job
11 11 Cleaning of AHU cooling coil (after opening front portion of AHU) by applying high air pressure followed by descaling solution chemical agent & then washing with water pressure using jet pump and reassembling there after complete rectification all as specified and directed including servicing of AC ducts cleaning etc and setting of grills, louvers and position of proportioning dampers & also minor repair to duct insulation for missing section complete for the 3 x 15 TR capacity AC plant. 1 Each Job
12 12 All as per item No 11 but 3x9 TR capacity plant 1 Each Job
13 13 All as per item No 11 but 2x75 TR capacity plant 1 Each Job
14 14 All as per item No 11 but 3x40 TR capacity plant 1 Each Job
15 15 All as per item No 11 but 3x80 TR capacity plant 2 Each Job
16 16 All as per item No 11 but 3X37.5 TR capacity plant 1 Each Job
17 17 All as per item No 11 but 1X60 TR capacity plant 1 Each Job
18 18 All as per item No 11 but 3X50 TR capacity plant 1 Each Job
19 19 S&F Nylon 'V' belts of size A -34 (Make:- Dunlop / Fenner) 2 Each
20 20 All as per item No 19 but size B- 64 2 Each
21 21 All as per item No 19 but size B- 82 2 Each
22 22 All as per item No 19 but size B- 68 2 Each
23 23 All as per item No 19 but size C-120 2 Each
24 24 All as per item No 19 but size B-78 2 Each
25 25 All as per item No 19 but size B-76 2 Each
26 26 Taking out oil filter of compressor Make :- ACCEL, Model SMC 4 - 65 cleaning the filter by using kerosene or diesel and fixing in its original position with gasket set all as specified and directed. 2 Each
27 27 Taking out oil filter of compressor Make :- Freeze king, FK - 750 cleaning the filter by using kerosene or diesel and fixing in its original position with gasket set all as specified and directed. 2 Each
28 28 Taking out oil filter of compressor Make :- ACCEL, Model SMC 3 - 65 cleaning the filter by using kerosene or diesel and fixing in its original position with gasket set all as specified and directed. 2 Each
29 29 Taking out oil filter of compressor Make :- ACCEL, Model SMC 4 - 100 cleaning the filter by using kerosene or diesel and fixing in its original position with gasket set all as specified and directed. 2 Each
30 30 Taking out the defective hand shut off valve of pressure gauge and supply & fixing new handshut off valve ¼" dia complete all as specified and directed (Make:- PIM / PINEER / INDFOS (ISI Marked)) 2 Each Job
31 31 Taking out the defective safety valve of compressor Make:- ACCEL, Model - SMC - 4 - 65 and supply & fixing new safety valve complete all as specified and directed by EIC. 2 Each Job
32 32 Taking out the defective condensor safety valve suitable for working pressure of 350 PSI all as specified and directed. 2 Each Job
33 33 Taking out unserviceable defective finned strip heater and supply and fixing strip heater 3 KW suitable for AC plant including provision of nuts, bolts & washers etc all as specified and directed (Make:- DasPass or equivalent as approved by G.E.) 20 Nos
34 34 Dismantling defective GM gate valve 20 mm dia at drain pipe of cooling tower of AC Plant and supply & fixing new GM gate valve (Make:- NMC / Jalota) 15 mm dia with GI Nipple, bends, nuts & bolts etc and necessary electric welding all as specified and directed. 2 Each Job
35 35 Dismantling and removing defective Finns of FRP type cooling tower and supply and fixing new PVC Finns brick containing eleven layers size of brick 600 x 30 x 150 mm complete all as specified and directed. 100 Each
36 36 Taking down carefully rotating sprinkler from cooling towers and S&F new rotating sprinkler assembly from comprising of coupling made out of aluminium alloy with one side 50 to100 mm threaded, and other side with fixing arrangement of 04 Nos sprinkler arm distributed four way with one side ball bearing for easy rotation complete including 04 Nos of PVC heavy duty sprinkler arm pipe of 25 mm dia 300 mm long with six holes of 20 mm dia at equal interval complete with one side threaded check nut and other side dead end complete all as specified and directed. 1 Each
37 37 Taking out wire mesh filter from AHUs, cleaning the filter with castic soda and water with pump pressure and reassembling in their position complete all as specified and directed. Note:- Ceaning shall be done three times in a season and payment shall be made once. 16 Each
38 38 Supply and fixing High Efficiency Particulate Air Filters\n(HEPA) Efficiency 99.97% (EU13) down to 0.3 micron filter mediaThe filters all use a pleated fiberglass media, folded and separated by aluminum spacers in a metal frame. all as specified and directed 20 Each
39 39 Supply and fixing of fine filter (EU-7)Efficiency 99 % down to 03 micron Filter Media: HDPE Media / Non Woven Synthetic Media Type: HDPE 1 ply+Non Woven Synthetic Media 1 ply+ al. mesh 1, ply, Type - BOX Type, MICRON -3, Frame MOC - Aluminium all as specified and directed. 24 Each
40 40 Supply and fixing of Pre filter (EU-4) Efficiency 90 % down to 10 micron Filter Media: HDPE Media / Non Woven Synthetic Media Type: HDPE 1 ply+Non Woven Synthetic Media 1 ply+ al. mesh 1, ply Type - BOX Type, MICRON -10, Frame MOC - GI SHEET 12 Each
41 41 Cleaning of AC supply and return duct, diffusers, dampers, coil installed components by Robotic vedio camera at CH (CC) for 05 nos OT including carry out Bacteriogical test after cleaning of duct and submission of test report complete all as specified and directed. 1 Each Job
42 42 Cleaning of AC supply and return duct, diffusers, dampers, coil installed components by Robotic vedio camera at Base Hospital for 04 Nos OT including carry out Bacteriogical test after cleaning of duct and submission of test report complete all as specified and directed. 1 Each Job
43 43 Cleaning of AC supply and return duct, diffusers, dampers, coil installed components by Robotic vedio camera at ICU CH CC AC PLANTS /NEFRO/X -RAYS AC PLANTS/CMDC AC PLANTS including carry out Bacteriogical test after cleaning of duct and submission of test report complete all as specified and directed. 4 Each Job
44 44 Taking out defective / burnt power contactor from electric panel board and S&F in replacement new Power contactor 3 TF 49 (Make :- seimens) with NO & NC contact, of coil Volatge 220 V all as specified and directed. 2 Each
45 45 S&F in replacement new Power contactor 3 TF 30 in existing LT panel all as specified and directed. (Make :- Siemens or equivalent as approved by GE) 2 Each
46 46 S&F in replacement new Power contactor 3 TF 31 in existing LT panel all as specified and directed. (Make :- Siemens or equivalent as approved by GE) 2 Each
47 47 Supply and fixing in replacement power contactor MNX 18, 3 phase in existing LT panel all as specified and directed. (Make :- Siemens or equivalent as approved by GE) 2 Each
48 48 Supply and fixing in replacement water flow meter of model HFS-25 having maximum working pressure10 bar and liquid temperature 01 to 100 degree centigrade all as specified. 1 Each
49 49 Taking out defective / burnt power contactor from electric panel board and S&F in replacement new power contactor 3 TS 47 complete all as specified and directed. \n(Make :- Seimens or equivalent as approved by GE . 1 Each
50 50 Supply and fixing in replacement auxillary contactor MNX A1, 3 phase in existing LT panel complete all as specified and directed. (Make :- Siemens or equivalent as approved by GE). 2 Each
51 51 Supply and fixing in replacement auxillary contactor MNX A2, 3 phase in existing LT panel all as specified and directed. (Make :- Siemens or equivalent as approved by GE). 4 Each
52 52 Supply and fixing in replacement three ways mixing valve switch model No GLB 331.9E of siemence or equivalent as approved by GE in existing LT panel complete all as specified and directed. 1 Each
53 53 Taking out carefully defective electronic timer from panel board and S&F new electronic timer Cat No. 800-S/7PU rating 30 to 0/60 to 20 in position complete all as specified and directed. Make Siemens/ Selectron 2 Each
54 54 Taking out carefully defective/burnt single phase preventor complete with wiring from LT panel and supply & fixing in replacement in position single preventer complete with wiring all as specified and directed. (Make :- L&T / Siemens/Minilec/VSP). 2 Each
55 55 Taking out carefully defective / burnt power contactor type ML-1.5 from the LT panel board and supply & fixing new in position in replacement power contractor ML-1.5 all as specified and directed. (Make :- L&T / Siemens). 2 Each
56 56 Taking out carefully defective / burnt power contactor type MNX 12 from the LT panel board and supply & fixing new in position in replacement power contractor MNX 12 all as specified and directed. (Make ;- L&T / Siemens). 2 Each
57 57 S&F in replacement motor terminal plates complete with nut, bolts and washers etc suitable for 75/10/15/20 HP capacity electric motor all as specified and directed. 5 Each
58 58 Disconnecting electrically unserviceable CT fan motor and Supply installation testing and commissioning of CT fan motor complete with other accessories like fan blades etc. 3 phase, 415 Volts, 7.5 HP capacity complete all as specified and directed. 2 Each
59 59 All as per item No 58 above but CT fan motor of capacity 3 HP. 2 Each
60 60 All as per item No 58 above but CT fan motor of capacity 2 HP. 2 Each
61 61 All as per item No 58 above but CT fan motor of capacity 1.5 HP. ( Note - for item no 58 to 61 , Old motor will be deposited in MES store yard of GE E/M ) 2 Each
62 62 S& F fresh compressor oil into the plant at different locations in Lucknow Cantt within a distance of not exceeding 6 Km complete all as specified and directed. Make Servo Fridge N-68 or other equivalent make as approved by GE. 160 Litre
63 63 Disconnecting electrically three phase 440 volt induction motor 20 HP unbolting it and transporting to the contractor workshop opening it for taking out burnt out copper windings, cleaning of stator slots by means of CTC or petrol and rewinding it with suitable size/gauge copper enameled wire including insulating/varnishing material, replacement of damaged ball bearing of suitable size and transporting it to the site and refixing to its original position and making necessary electrical connection and testing complete all as directed at site. 1 Each Job
64 64 All as item No 63 above but of capicity 50 HP 1 Each Job
65 65 All as item No 63 above but of capicity 37.5 HP 1 Each Job
66 66 All as item No 63 above but of capicity 12.5 HP 1 Each
67 67 Dismantling of complete AHU unit of any TR cooling unit and taking out defective/unserviceable blower motor with defective ball bearing No P 207/208/210 and shaft & supply & fixing new blower(supply and return blower) new ball bearing of same make and size in repaired blower shaft welding,grinding,polishing and reinstalling the shaft assembly and testing complete all as specified and directed. ( Note - Old material will be deposited in MES store yard of GE E/M ) 2 Each Job
68 68 Dismantling of monoblock pump of capacity 5 HP from its foundation after unbolting it and servicing/overhauling of pump complete including replacemnt of worn out spares such as ball bearings,gland bush,gland packing,nuts and bolts of gland,greasing and oiling of all moving parts,grinding/turning etc. and reassembling the pump including re-installation to its original position including testing of water leakage all as specified and directed. 2 Each \nJob
69 69 Scarpping of old painted surfaces of central type AC plant of any capacity,M&L for spray painting with approved colour after preparing all equipments for smooth surfaces of compressor,condensor,monoblock pumps,compressor motors,motor starter,LT panel boards,water supply pipe lines,cooling tower,supply and discharge lines,liquid lines,AHUs etc including all connected accessories and marking of refrigerant system,water supply system etc with approved colour and marking of SM/MES nos with black enamelled paint of approved size and marking of incomng/outgoing electrical connection on LT panel board,operator room,glow sign boards of AC plant with approved colour on blue back ground complete all as directed at site. 9 Each \nJob
70 70 Supply only refrigerant gas CFC compatible to R-22 in returnable sealed cylinder all as specified and directed. (Make:- Floran / Mafron) 190 Kg
71 71 Supply, installation, commissioning and testing of commercial Air Curtain unit of size 52"x84" for prevention of dust and conditioned air loses, SINGLE phase, 220V, 50 HZ, made out of MS/CRCA sheet of min 18G finished with two coats of red oxide primer and final coat of synthetic enamel paint ( oven baked) with MS-CRC 18 g square perforated suction grills, al alloy fans and single phase electric motor, nozzles etc. complete with fittings and accessories so as to produce 1-15 m/sec air velocity at floor level for door opening as specified. ( Note - Old materials will be deposited in MES store yard of GE E/M) 1 Each
72 72 S&F in replacement 13 TR Water cooled condenser suitable for existing plant complete with drier filter to connection between condensor and compressor testing and commisioning complete all as specified and directed. (Note - Old materials will be deposited in mES store yard of GE E/M ) 3 Each
73 73 S&F in replacement 13 TR scrolled compressor suitable for existing plant including R-407 refrigerant gas of suitable quantity with testing and commisioning complete all as specified and directed. (Note - Old materials will be deposited in MES store yard of GE E/M ) 3 Each
74 74 Supply, install, commissioning and testing of double skin floor mounted Air Handling Unit with 6 rows deep coil of nominal capacity complete as specified and directed. (Note - Old materials will be deposited in MES store yard of GE E/M) 1 Each
75 75 Material & labour for servicing of indoor and outdoor unit of 1.5/02 TR window type AC by means of electric blower and water under pressure cleaning & washing of condensing coil / cooling coil by soap solution or recommended chemical, oiling & greasing of moving parts such as blower motor etc. complete all as specified and directed. 90 Each
76 76 Material & labour for servicing of indoor and outdoor unit of 1.5/02 TR SPLIT TYPE AC by means of electric blower and water under pressure cleaning & washing of condensing coil / cooling coil by soap solution or recommended chemical, oiling & greasing of moving parts such as blower motor etc. complete all as specified and directed. 195 Each
77 77 Supply and charging (Top up) the AC unit of 1.5 TR /2 TR split type AC unit with Refrigerant gas compatible to R-22 type in required Qty complete all as specified and directed. 160 Each
78 78 Supply and charging (Top up) the AC unit of 1.5 TR /2 TR window type AC unit with Refrigerant Gas non CFC compatible to R- 710 type or as eqvlnt in required Qty complete all as specified and directed. 17 Each
79 79 S&F Compressor rotary suitable for reversible cycle split type AC 1.5 TR (Original sealed unit is to supply ) of Make Blue Star, Videocon, Samsung, or its equivalent of other specified make as approved by GE. 5 Each
80 80 S&F Compressor rotary suitable for reversible cycle split type AC 2.0 TR (Original sealed unit is to supply ) of Make Blue Star, Videocon, Samsung, or its equivalent of other specified make as approved by GE. 4 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail