Irrigation And Flood Control Department-IFCD has published Protection To Sloughed Rp Embankment Of River Jehlum At Up Stream Rd 118 . 90Km By Way Of Earth Filled Bags. Submission Date for this Tender is 05-03-2021. Embankment Tenders in Sumbal Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Protection to sloughed RP embankment of River Jehlum at U/s RD.118.90KM by way of earth fille bags ( Adv. Cost 2.62 lacs) incl.cost of departmental supplies | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soils 25 meter beyond 1 m from cutting edge | BI01010001010000000000000515BI0100001113 | 48.05 | CUM |
2 | 1.02 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. | BI01010001010000000000000515BI0100001114 | 4050 | No. |
3 | 1.03 | Unloading sand/earth filled bags from boats Placing in dry | BI01010001010000000000000515BI0100001115 | 4050 | No. |
4 | 1.04 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer without power roller , dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | BI01010001010000000000000515BI0100001116 | 58.04 | CUM |
5 | 1.05 | Supplying and stacking Good Earth at site including royality | BI01010001010000000000000515BI0100001117 | 134.3 | CUM |
6 | 1.06 | Carriage of materials from source to road site of work by Mech.transport incl.loading unloading and stacking etc :-\na) Earth from avg.09km\n | BI01010001010000000000000515BI0100001118 | 134.3 | CUM |
7 | 1.07 | b) EC bags for avg.15km | BI01010001010000000000000515BI0100001119 | 4050 | No. |
8 | 1.08 | Carriage of materials from road site to site work by manual labour incl.loading, unloading and stacking etc. upto avg.lead of 250mtrs.\na) Earth\n | BI01010001010000000000000515BI0100001120 | 134.3 | CUM |
9 | 1.09 | b) EC bags | BI01010001010000000000000515BI0100001121 | 4050 | No. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail