}

Construction Of Compound Wall Construction Of Compound Wall At Arun Nagar Water Tank In Division No 5 Zone 2, Salem City Municipal Corporation-Tamil Nadu

Municipal Adminitration And Water Supply Department-MAAWSD has published Construction Of Compound Wall Construction Of Compound Wall At Arun Nagar Water Tank In Division No 5 Zone 2. Submission Date for this Tender is 04-03-2021. Wall construction Tenders in Salem City Municipal Corporation Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

27125374
Construction Of Compound Wall Construction Of Compound Wall At Arun Nagar Water Tank In Division No 5 Zone 2
Open Tender
Indian
Tamil Nadu
Salem City Municipal Corporation
04-03-2021

Tender Details

Construction Of Compound Wall Construction Of Compound Wall At Arun Nagar Water Tank In Division No 5 Zone 2

Key Value

Document Fees
Refer document
EMD
INR 15000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Construction of Compound Wall at Arun Nagar Water Tank in Division No: 5, Zone-2
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental Engineers. 120 m3
2 1.1 Collection,supply and filling of sand from approved quarry to work site and stocking to the Departmental gauge for premeasurement as directed by the Departmental Engineer, to required depth not more than 15cm depth including cost and Conveyance of sand to site and all labour charges for filling etc., Complete complying with Standard Specification 6 m3
3 1.2 Plain cement concrete 1:4:8 mix (One cement four m-sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification 14 m3
4 1.4 Supplying and erecting in the position of MS sheets including necessary supports for plane surfaces using MS Sheets of size 90cm x 60cm and or suitable shifted with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joints of size 10cm x 6.5cm, complete
5 1.5 a). Square Columns & Sunshade 111 m2
6 1.7 b). Plain Surface 53 m2
7 1.8 Supplying, fabricating and placing in position mild steel or tar steel bars for all reinforced cement concrete items of work including cost of steel transporting, straightening, cutting, bending, cranking, blinding, welding etc. including cost of MS or RTS rod and binding wire, all labour and materials complete Complying with standard specifications and drawings and has directed by departmental Engineers. 2790 Kg
8 1.9 Reinforced cement concrete 1:1½:3 mix (One cement one and half sand three aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
9 2.1 Columns Up to Plinth Level 23 m3
10 2.2 Columns Above Plinth Level 4 m3
11 2.3 Brick Work in Cement Mortar 1:5 Mix (one cement, five sand) using new best II Class Bricks of size ( 9” x 4 3/8” x 23/4“) from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
12 2.4 Wall Up to Basment Level 19 m3
13 2.5 Wall Above Basment Level 44 m3
14 2.6 Plastering with cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications 570 m2
15 2.7 Supplying and fixing MS grill to doors windows and ventilators etc. using 20mm x 6mm as directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete (as per schedule of rates) as per standard specification 1200 Kg
16 2.8 Painting new iron work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete 134 m2
17 2.9 Painting two coats with approved cement paint over cement plastered surface ceiling and other new surface including cleaning prepering the surface and curing etc., complete 570 m2
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail