Bhubaneswar Municipal Corporation has published Construction Of Approach Road From Shree Vihar Main Road To Nature Crest Appartment In Ward No . 03. Submission Date for this Tender is 01-03-2021. Road Work Tenders in BMC Limit Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Construction of Approach Road from Shree Vihar Main Road to " Nature Crest" Appartment in Ward No.03 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earthwork in excavation of foundation in hard soil /gravelly soil including rough dressing and leveling the bed and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 202.25 | %Cum |
2 | 2 | Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge. | 202.25 | Cum | |
3 | 3 | Labour for laying Sub base with Stone dust including watering and compacting to required density in OMC with H.R.R. but excluding costs conveyance of sub-base materials including cost of all labour, T&P sundries etc complete as per direction of Engineer-in-charge | BI01010001010000000000000515BI0100001114 | 21 | Cum |
4 | 4 | Providing laying, spreading and compacting graded stone aggregate to "WET MIX MACADAM" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge. | 21 | Cum | |
5 | 5 | Providing & applying Primer Coat with Bitumen emulsion on prepared surface of Granular Base including cleaning of Road surface and spraying primer @ 0.60Kg/m2 using manual means etc complete as per direction of EIC. | 140 | Sqm | |
6 | 6 | Cleaning the existing B.T Surface with removal of foreign materials etc complete as per the direction of E.I.C. | 640 | Sqm | |
7 | 7 | Labour for applying Tack coat over Granular surface @ 0.30Kg/m2 and over B.T Surface @ 0.20Kg/m2 including cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. (a) Over B.T Surface | 640 | Sqm | |
8 | 7.01 | Over Granular Surface | 140 | Sqm | |
9 | 8 | Providind and laying "BITUMINOUS MACADAM" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road & Bridge works | 10.5 | Cum | |
10 | 9 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work | 39 | Cum | |
11 | 10 | Providing Centre line with Thermostratic Paint including cost of all labour,T&P sundries etc. complete as per the direction of EIC. | 48.75 | Sqm | |
12 | 11 | Providing & laying C:C: (1:4:8) using 4 cm. size H.G. (C.B) metal including the cost of all materials, labour carriage, royalty T& P and all Taxes etc complete as per direction of EIC. | 43.88 | Cum | |
13 | 12 | Supplying all materials, labour, T&P and providing Cement Concrete (CC) (1:1.5:3) using 12 to 20mm size BHGCB chips including cost of all materials centering & shuttering ,labour,T&P sundries but excluding cost of M.S Rod etc. complete as per the direction of EIC. | 87.75 | Cum | |
14 | 13 | Rigid smooth centering and shuttering for RCC or CC work including false works, supplying of centering materials, its hire charges, cost of labour T & P and dismentalling after casting the concrete etc all complete as per direction of EIC | 97.5 | Sqm | |
15 | 14 | Providing 12mm thick Bituminous Expansion Joint Board etc complete as per direction of EIC. | 13.5 | Sqm |