}

Wbpw ( R ) D/Enib No . 02 Of Se/Whc-I/2020-2021/1 Bridge Over River Bhagirathi Connecting Kalna , Ch . 35 . 447 Km Of Stkk Road And Shantipur , Ch . 96 . 30 Km Of Nh-34 In The District Of Purba Bardhaman And Nadia , West Bengal . , Burdwan-West Bengal

Public Works Department-PWD has published Wbpw ( R ) D/Enib No . 02 Of Se/Whc-I/2020-2021/1 Bridge Over River Bhagirathi Connecting Kalna , Ch . 35 . 447 Km Of Stkk Road And Shantipur , Ch . 96 . 30 Km Of Nh-34 In The District Of Purba Bardhaman And Nadia , West Bengal . . Submission Date for this Tender is 26-03-2021. Bridge Work Tenders in Burdwan West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

26895555
Wbpw ( R ) D/Enib No . 02 Of Se/Whc-I/2020-2021/1 Bridge Over River Bhagirathi Connecting Kalna , Ch . 35 . 447 Km Of Stkk Road And Shantipur , Ch . 96 . 30 Km Of Nh-34 In The District Of Purba Bardhaman And Nadia , West Bengal .
Open Tender
Indian
West Bengal
Burdwan
26-03-2021

Tender Details

Bridge Over River Bhagirathi Connecting Kalna , Ch . 35 . 447 Km Of Stkk Road And Shantipur , Ch . 96 . 30 Km Of Nh-34 In The District Of Purba Bardhaman And Nadia , West Bengal .

Key Value

Document Fees
Refer document
EMD
INR 400000.0 /-
Tender Value
INR 726.45 Crore /-

BOQ Items

Name of Work:-Consultancy services for Authority’s Engineer for supervision of the works ‘Bridge over river Bhagirathi connecting Kalna, Ch.35.447 Km of STKK Road and Shantipur, Ch.96.30 Km of NH-34 in the district of Purba Bardhaman and Nadia, West Bengal’
Sl. No. Item Description Item Code / Make Quantity Units
1 1 REMUNERATION FOR LOCAL PROFESSIONAL STAFF BI01010001010000000000000515BI0100001112
2 1.01 A: Key Personnel \nTeam Leader cum Senior Bridge Engineer, Full Time (Maximum age limit 70 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 4.00 month\n Total = 52.00 month BI01010001010000000000000515BI0100001113 52 Man-month
3 1.02 A: Key Personnel \nSenior Bridge Construction Engineer cum Resident Engineer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 24.00 month\n Total = 72.00 month 72 Man-month
4 1.03 A: Key Personnel\nSr. Highway Engineer/Resident Engineer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month 48 Man-month
5 1.04 A: Key Personnel \nSenior Bridge Design Engineer\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 16.00 month\nFor DLP Period = 0.00 month\n Total = 16.00 month 16 Man-month
6 1.05 A: Key Personnel\nSr. Contract Specialist\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 16.00 month\nFor DLP Period = 6.00 month\n Total = 22.00 month 22 Man-month
7 1.06 A: Key Personnel\nSenior Quality cum Material Expert\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month 48 Man-month
8 1.07 A: Key Personnel\nSenior Quality Surveyer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month BI01010001010000000000000515BI0100001114 48 Man-month
9 1.08 A: Key Personnel\nSenior Geotechnical Engineer\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 8.00 month\nFor DLP Period = 0.00 month\n Total = 8.00 month BI01010001010000000000000515BI0100001115 8 Man-month
10 1.09 A: Key Personnel\nRoad Safety Expert, \n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 6.00 month\nFor DLP Period = 0.00 month\n Total = 6.00 month BI01010001010000000000000515BI0100001116 6 Man-month
11 1.1 B: Sub Professional Staff\nBridge / Structural Engineer \n(2 Nos.) Full Time\nFor Construction Period=2X48.00=96.00 month\nFor DLP Period = 0.00 month\n Total =96.00 month 96 Man-month
12 1.11 B: Sub Professional Staff\nHighway Design Engineer \nFor Construction Period=6.00 month\nFor DLP Period = 0.00 month\n Total = 6.00 month 6 Man-month
13 1.12 B: Sub Professional Staff\nSurvey Engineer \n(3 Nos.) Full Time\nFor Construction Period=3X48.00=144.00 month\nFor DLP Period = 0.00 month\n Total = 144.00 month 144 Man-month
14 1.13 B: Sub Professional Staff\nBridge Engineer /Assistant Bridge Engineer\n(4 Nos.) Full Time\nFor Construction Period=4X48.00=192.00 month\nFor DLP Period = 48.00 month\n Total = 240.00 month \n BI01010001010000000000000515BI0100001119 240 Man-month
15 1.14 B: Sub Professional Staff\nAssistant Highway Engineer (Quantity Surveyor)\n(2 Nos.) Full Time\nFor Construction Period=2X48.00=96.00 month\nFor DLP Period = 0.00 month\n Total = 96.00 month 96 Man-month
16 1.15 B: Sub Professional Staff\nAssistant Quality Surveyor/Field Engineer cum Quantity Surveyor\nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month BI01010001010000000000000515BI0100001120 96 Man-month
17 1.16 B: Sub Professional Staff\nSafety Engineer \nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month BI01010001010000000000000515BI0100001121 48 Man-month
18 1.17 B: Sub Professional Staff\nLab Technician\n(6 Nos.) Full Time\nFor Construction Period\n =6X48.00=288.00 month\n\nFor DLP Period =00.00 month\n Total = 288.00 month BI01010001010000000000000515BI0100001122 288 Man-month
19 1.18 B: Sub Professional Staff\nCAD Expert\nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month 48 Man-month
20 2 Support Staff BI01010001010000000000000515BI0100001123
21 2.01 Support Staff\nOffice Manager(1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month BI01010001010000000000000515BI0100001124 48 Man-month
22 2.02 Support Staff\nAccountant cum cashier (1no)\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month 96 Man-month
23 2.03 Support Staff\nPhotocopy Machine Operator (1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month 48 Man-month
24 2.04 Support Staff\nComputer Operator cum steno (1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month 48 Man-month
25 2.05 Support Staff\nOffice Boy (2no)\nFor Construction Period=96.00 month\nFor DLP Period =48.00 month\n Total = 144.00 month 144 Man-month
26 3 Transportation (Fixed rate on rental basis)\nThe vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx.3000km/month run\n
27 3.01 Innova / Scorpio or equivalent (not more than 3 years old) (2no)\nFor Construction Period=96.00 month\nFor DLP Period =48.00 month\n Total = 144.00 month 144 month
28 3.02 Ambassador / Indica or equivalent (not more than 3 years old) (3no)\nFor Construction Period=144.00 month\nFor DLP Period =00.00 month\n Total = 144.00 month 144 month
29 4 Duty Travel to Site (Fixed Costs) : Professional and Sub-Professional Staff (for Single project)\nThe employer may require the Key Personnel to visit the Employer’s Site/Regional office. The quoted amount should include travel fare for 20 round trip to Employer’s Head Office and 20 round trip to Employer’s regional office (including Hotel charges, travel costs etc. Complete) .\n 1 whole project
30 5 Office Rent (Fixed Costs)– Minimum 200 sqm. area of office shall be rented. (for Single project)\nThe rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.\nFor Construction Period=48.00 month\n 48 month
31 6 Office Rent (Fixed Costs)– Minimum 200 sqm. area of office shall be rented. (for Single project)\nThe rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.\nFor DLP Period=48.00 month\n 48 month
32 7 Office Supplies, Utilities and Communication (Fixed Costs) \n(for Single project)\n BI01010001010000000000000515BI0100001125
33 7.01 Office Supplies\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month 96 month
34 7.02 Drafting Supplies\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month 96 month
35 7.03 Computer Running Costs\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month 96 month
36 7.04 Domestic and International\nCommunication\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month\n 96 month
37 8 Office Furniture and Equipment (Rental) [Fixed monthly cost] (for Single project)\n(Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)\n
38 8.01 Office Furniture (Rental/Hire)\nExecutive Table (Godrej make, model No.T-108 or equivalent) \n(1 for each Key Personnel)\nFor Construction Period=9 noX48.00 month=432 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 480.00 month 480 month
39 8.02 Office Furniture(Rental/Hire)\nExecutive Chairs (Godrej make, model No.PCH-701or equivalent) (1 for each Key Personnel)\nFor Construction Period=9 noX48.00 month=432 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 480.00 month 480 month
40 8.03 Office Furniture(Rental/Hire)\nTables (Godrej make, model No.T-104 Or equivalent) \nFor Construction Period=20 noX48.00 month=960 month\nFor DLP Period =4 noX48.00 month=192 month\n Total = 1152.00 month 1152 month
41 8.04 Office Furniture(Rental/Hire)\nOrdinary ChairsType-1(Godrej make, Model NoT-CHR–6 or equivalent) \nFor Construction Period=20 noX48.00 month=960 month\nFor DLP Period =4 noX48.00 month=192 month\n Total = 1152.00 month 1152 month
42 8.05 Office Furniture(Rental/Hire)\nTables (for all other staff)(Godrej make, model No.T-101or equivalent) \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 288.00 month 288 month
43 8.06 Office Furniture(Rental/Hire)\nOrdinary Chairs–Type II (for all other staff) (Godrej make, model No.CHR-6 or equivalent)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 288.00 month\n 288 month
44 8.07 Office Furniture(Rental/Hire)\nSteel Almirah 1270mm x765mm x440mm (Godrej make, model minor plain or equivalent)\nFor Construction Period=6 noX48.00 month=288 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 384.00 month\n 384 month
45 8.08 Office Furniture(Rental/Hire)\nVisitors chairs/Conference room chairs (Godrej make, model No.DCH7004or equivalent)\nFor Construction Period=8 noX48.00 month=384 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 480.00 month 480 month
46 8.09 Office Furniture(Rental/Hire)\nTables for computers with 3 drawers, keyboard /mouse pull out trays size 1664mmx900(Godrej make Or equivalent as per Engineer’s design)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month 240 month
47 8.1 Office Furniture(Rental/Hire)\nPrinter desks (Godrej make or equivalent)\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 144.00 month 144 month
48 8.11 Office Furniture(Rental/Hire)\nSide tables (Godrej make or equivalent)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 192.00 month 192 month
49 8.12 Office Furniture(Rental/Hire)\nConference Table (Godrej make, model No.T-12 or equivalent) \nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month\n \n 48 month
50 8.13 Office Furniture(Rental/Hire)\nRevolving Chairs for Computer Room/Drawing room \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month 240 month
51 8.14 Office Equipment(Rental/Hire)\nTelephone with PABX facilities (2 External lines & 1 0internal lines)\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 96.00 month\n 96 month
52 8.15 Office Equipment(Rental/Hire)\nPhotocopier \nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month 48 month
53 8.16 Office Equipment(Rental/Hire)\nAir-Conditioner(1.5Ton) \nFor Construction Period=3 noX48.00 month=144 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 192.00 month 192 month
54 8.17 Office Equipment(Rental/Hire)\nComputer PC (state of the art) \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month 240 month
55 8.18 Office Equipment(Rental/Hire)\nLaserJet Printers\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 96.00 month 96 month
56 8.19 Office Equipment(Rental/Hire)\nDiesel Generator (20KVA)with running cost\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month 48 month
57 8.2 Office Equipment(Rental/Hire)\nBinding Machine\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month 48 month
58 8.21 Office Equipment(Rental/Hire)\nWater Coolers (Voltas or equivalent)\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month 48 month
59 8.22 Office Equipment(Rental/Hire)\nSoftware (LS)\nFor Construction Period=48 month\nFor DLP Period =00 month\n Total = 48.00 month 48 month
60 9 Reports and Document Printing\n (for Single project)\n
61 9.01 Monthly reports\nFor Construction Period\nNo.of Reports=48, No.of Copies per Report =6 \nTotal=48X6=288 Copies\nFor DLP Period =0 Copy\n\n 288 copies
62 9.02 Quarterly Reports\nFor Construction Period\nNo.of Reports=16, No.of Copies per Report =6 \nFor DLP Period\nNo.of Reports=16, No.of Copies per Report =6 \nTotal=2X16X6=192 Copies 192 copies
63 9.03 Various others reports as Provided in the EPC Agreement such as Completion Report\nFor Construction Period\nNo.of Reports=18, No.of Copies per Report =6 \nTotal=18X6=108 Copies\nFor DLP Period =0 Copy 108 copies
64 10 Contingencies\nA fixed amount of Indian Rupees ONE MILLION (Rs.10,00,000.00) shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority.\n 1 whole \nperiod
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail