Public Works Department-PWD has published Wbpw ( R ) D/Enib No . 02 Of Se/Whc-I/2020-2021/1 Bridge Over River Bhagirathi Connecting Kalna , Ch . 35 . 447 Km Of Stkk Road And Shantipur , Ch . 96 . 30 Km Of Nh-34 In The District Of Purba Bardhaman And Nadia , West Bengal . . Submission Date for this Tender is 26-03-2021. Bridge Work Tenders in Burdwan West Bengal. Bidders can get complete Tender details and download the document.
Name of Work:-Consultancy services for Authority’s Engineer for supervision of the works ‘Bridge over river Bhagirathi connecting Kalna, Ch.35.447 Km of STKK Road and Shantipur, Ch.96.30 Km of NH-34 in the district of Purba Bardhaman and Nadia, West Bengal’ | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | REMUNERATION FOR LOCAL PROFESSIONAL STAFF | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | A: Key Personnel \nTeam Leader cum Senior Bridge Engineer, Full Time (Maximum age limit 70 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 4.00 month\n Total = 52.00 month | BI01010001010000000000000515BI0100001113 | 52 | Man-month |
3 | 1.02 | A: Key Personnel \nSenior Bridge Construction Engineer cum Resident Engineer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 24.00 month\n Total = 72.00 month | 72 | Man-month | |
4 | 1.03 | A: Key Personnel\nSr. Highway Engineer/Resident Engineer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month | 48 | Man-month | |
5 | 1.04 | A: Key Personnel \nSenior Bridge Design Engineer\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 16.00 month\nFor DLP Period = 0.00 month\n Total = 16.00 month | 16 | Man-month | |
6 | 1.05 | A: Key Personnel\nSr. Contract Specialist\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 16.00 month\nFor DLP Period = 6.00 month\n Total = 22.00 month | 22 | Man-month | |
7 | 1.06 | A: Key Personnel\nSenior Quality cum Material Expert\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month | 48 | Man-month | |
8 | 1.07 | A: Key Personnel\nSenior Quality Surveyer\nFull Time (Maximum age limit 65 years on Bid due date)\nFor Construction Period= 48.00 month\nFor DLP Period = 0.00 month\n Total = 48.00 month | BI01010001010000000000000515BI0100001114 | 48 | Man-month |
9 | 1.08 | A: Key Personnel\nSenior Geotechnical Engineer\n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 8.00 month\nFor DLP Period = 0.00 month\n Total = 8.00 month | BI01010001010000000000000515BI0100001115 | 8 | Man-month |
10 | 1.09 | A: Key Personnel\nRoad Safety Expert, \n(Maximum age limit 65 years on Bid due date)\nFor Construction Period= 6.00 month\nFor DLP Period = 0.00 month\n Total = 6.00 month | BI01010001010000000000000515BI0100001116 | 6 | Man-month |
11 | 1.1 | B: Sub Professional Staff\nBridge / Structural Engineer \n(2 Nos.) Full Time\nFor Construction Period=2X48.00=96.00 month\nFor DLP Period = 0.00 month\n Total =96.00 month | 96 | Man-month | |
12 | 1.11 | B: Sub Professional Staff\nHighway Design Engineer \nFor Construction Period=6.00 month\nFor DLP Period = 0.00 month\n Total = 6.00 month | 6 | Man-month | |
13 | 1.12 | B: Sub Professional Staff\nSurvey Engineer \n(3 Nos.) Full Time\nFor Construction Period=3X48.00=144.00 month\nFor DLP Period = 0.00 month\n Total = 144.00 month | 144 | Man-month | |
14 | 1.13 | B: Sub Professional Staff\nBridge Engineer /Assistant Bridge Engineer\n(4 Nos.) Full Time\nFor Construction Period=4X48.00=192.00 month\nFor DLP Period = 48.00 month\n Total = 240.00 month \n | BI01010001010000000000000515BI0100001119 | 240 | Man-month |
15 | 1.14 | B: Sub Professional Staff\nAssistant Highway Engineer (Quantity Surveyor)\n(2 Nos.) Full Time\nFor Construction Period=2X48.00=96.00 month\nFor DLP Period = 0.00 month\n Total = 96.00 month | 96 | Man-month | |
16 | 1.15 | B: Sub Professional Staff\nAssistant Quality Surveyor/Field Engineer cum Quantity Surveyor\nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month | BI01010001010000000000000515BI0100001120 | 96 | Man-month |
17 | 1.16 | B: Sub Professional Staff\nSafety Engineer \nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month | BI01010001010000000000000515BI0100001121 | 48 | Man-month |
18 | 1.17 | B: Sub Professional Staff\nLab Technician\n(6 Nos.) Full Time\nFor Construction Period\n =6X48.00=288.00 month\n\nFor DLP Period =00.00 month\n Total = 288.00 month | BI01010001010000000000000515BI0100001122 | 288 | Man-month |
19 | 1.18 | B: Sub Professional Staff\nCAD Expert\nFull Time\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month | 48 | Man-month | |
20 | 2 | Support Staff | BI01010001010000000000000515BI0100001123 | ||
21 | 2.01 | Support Staff\nOffice Manager(1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month | BI01010001010000000000000515BI0100001124 | 48 | Man-month |
22 | 2.02 | Support Staff\nAccountant cum cashier (1no)\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month | 96 | Man-month | |
23 | 2.03 | Support Staff\nPhotocopy Machine Operator (1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month | 48 | Man-month | |
24 | 2.04 | Support Staff\nComputer Operator cum steno (1no)\nFor Construction Period=48.00 month\nFor DLP Period =00.00 month\n Total = 48.00 month | 48 | Man-month | |
25 | 2.05 | Support Staff\nOffice Boy (2no)\nFor Construction Period=96.00 month\nFor DLP Period =48.00 month\n Total = 144.00 month | 144 | Man-month | |
26 | 3 | Transportation (Fixed rate on rental basis)\nThe vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx.3000km/month run\n | |||
27 | 3.01 | Innova / Scorpio or equivalent (not more than 3 years old) (2no)\nFor Construction Period=96.00 month\nFor DLP Period =48.00 month\n Total = 144.00 month | 144 | month | |
28 | 3.02 | Ambassador / Indica or equivalent (not more than 3 years old) (3no)\nFor Construction Period=144.00 month\nFor DLP Period =00.00 month\n Total = 144.00 month | 144 | month | |
29 | 4 | Duty Travel to Site (Fixed Costs) : Professional and Sub-Professional Staff (for Single project)\nThe employer may require the Key Personnel to visit the Employer’s Site/Regional office. The quoted amount should include travel fare for 20 round trip to Employer’s Head Office and 20 round trip to Employer’s regional office (including Hotel charges, travel costs etc. Complete) .\n | 1 | whole project | |
30 | 5 | Office Rent (Fixed Costs)– Minimum 200 sqm. area of office shall be rented. (for Single project)\nThe rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.\nFor Construction Period=48.00 month\n | 48 | month | |
31 | 6 | Office Rent (Fixed Costs)– Minimum 200 sqm. area of office shall be rented. (for Single project)\nThe rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.\nFor DLP Period=48.00 month\n | 48 | month | |
32 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) \n(for Single project)\n | BI01010001010000000000000515BI0100001125 | ||
33 | 7.01 | Office Supplies\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month | 96 | month | |
34 | 7.02 | Drafting Supplies\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month | 96 | month | |
35 | 7.03 | Computer Running Costs\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month | 96 | month | |
36 | 7.04 | Domestic and International\nCommunication\nFor Construction Period=48.00 month\nFor DLP Period =48.00 month\n Total = 96.00 month\n | 96 | month | |
37 | 8 | Office Furniture and Equipment (Rental) [Fixed monthly cost] (for Single project)\n(Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)\n | |||
38 | 8.01 | Office Furniture (Rental/Hire)\nExecutive Table (Godrej make, model No.T-108 or equivalent) \n(1 for each Key Personnel)\nFor Construction Period=9 noX48.00 month=432 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 480.00 month | 480 | month | |
39 | 8.02 | Office Furniture(Rental/Hire)\nExecutive Chairs (Godrej make, model No.PCH-701or equivalent) (1 for each Key Personnel)\nFor Construction Period=9 noX48.00 month=432 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 480.00 month | 480 | month | |
40 | 8.03 | Office Furniture(Rental/Hire)\nTables (Godrej make, model No.T-104 Or equivalent) \nFor Construction Period=20 noX48.00 month=960 month\nFor DLP Period =4 noX48.00 month=192 month\n Total = 1152.00 month | 1152 | month | |
41 | 8.04 | Office Furniture(Rental/Hire)\nOrdinary ChairsType-1(Godrej make, Model NoT-CHR–6 or equivalent) \nFor Construction Period=20 noX48.00 month=960 month\nFor DLP Period =4 noX48.00 month=192 month\n Total = 1152.00 month | 1152 | month | |
42 | 8.05 | Office Furniture(Rental/Hire)\nTables (for all other staff)(Godrej make, model No.T-101or equivalent) \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 288.00 month | 288 | month | |
43 | 8.06 | Office Furniture(Rental/Hire)\nOrdinary Chairs–Type II (for all other staff) (Godrej make, model No.CHR-6 or equivalent)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 288.00 month\n | 288 | month | |
44 | 8.07 | Office Furniture(Rental/Hire)\nSteel Almirah 1270mm x765mm x440mm (Godrej make, model minor plain or equivalent)\nFor Construction Period=6 noX48.00 month=288 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 384.00 month\n | 384 | month | |
45 | 8.08 | Office Furniture(Rental/Hire)\nVisitors chairs/Conference room chairs (Godrej make, model No.DCH7004or equivalent)\nFor Construction Period=8 noX48.00 month=384 month\nFor DLP Period =2 noX48.00 month=96 month\n Total = 480.00 month | 480 | month | |
46 | 8.09 | Office Furniture(Rental/Hire)\nTables for computers with 3 drawers, keyboard /mouse pull out trays size 1664mmx900(Godrej make Or equivalent as per Engineer’s design)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month | 240 | month | |
47 | 8.1 | Office Furniture(Rental/Hire)\nPrinter desks (Godrej make or equivalent)\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 144.00 month | 144 | month | |
48 | 8.11 | Office Furniture(Rental/Hire)\nSide tables (Godrej make or equivalent)\nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 192.00 month | 192 | month | |
49 | 8.12 | Office Furniture(Rental/Hire)\nConference Table (Godrej make, model No.T-12 or equivalent) \nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month\n \n | 48 | month | |
50 | 8.13 | Office Furniture(Rental/Hire)\nRevolving Chairs for Computer Room/Drawing room \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month | 240 | month | |
51 | 8.14 | Office Equipment(Rental/Hire)\nTelephone with PABX facilities (2 External lines & 1 0internal lines)\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 96.00 month\n | 96 | month | |
52 | 8.15 | Office Equipment(Rental/Hire)\nPhotocopier \nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month | 48 | month | |
53 | 8.16 | Office Equipment(Rental/Hire)\nAir-Conditioner(1.5Ton) \nFor Construction Period=3 noX48.00 month=144 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 192.00 month | 192 | month | |
54 | 8.17 | Office Equipment(Rental/Hire)\nComputer PC (state of the art) \nFor Construction Period=4 noX48.00 month=192 month\nFor DLP Period =1 noX48.00 month=48 month\n Total = 240.00 month | 240 | month | |
55 | 8.18 | Office Equipment(Rental/Hire)\nLaserJet Printers\nFor Construction Period=2 noX48.00 month=96 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 96.00 month | 96 | month | |
56 | 8.19 | Office Equipment(Rental/Hire)\nDiesel Generator (20KVA)with running cost\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month | 48 | month | |
57 | 8.2 | Office Equipment(Rental/Hire)\nBinding Machine\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month | 48 | month | |
58 | 8.21 | Office Equipment(Rental/Hire)\nWater Coolers (Voltas or equivalent)\nFor Construction Period=1 noX48.00 month=48 month\nFor DLP Period =0 noX48.00 month=00 month\n Total = 48.00 month | 48 | month | |
59 | 8.22 | Office Equipment(Rental/Hire)\nSoftware (LS)\nFor Construction Period=48 month\nFor DLP Period =00 month\n Total = 48.00 month | 48 | month | |
60 | 9 | Reports and Document Printing\n (for Single project)\n | |||
61 | 9.01 | Monthly reports\nFor Construction Period\nNo.of Reports=48, No.of Copies per Report =6 \nTotal=48X6=288 Copies\nFor DLP Period =0 Copy\n\n | 288 | copies | |
62 | 9.02 | Quarterly Reports\nFor Construction Period\nNo.of Reports=16, No.of Copies per Report =6 \nFor DLP Period\nNo.of Reports=16, No.of Copies per Report =6 \nTotal=2X16X6=192 Copies | 192 | copies | |
63 | 9.03 | Various others reports as Provided in the EPC Agreement such as Completion Report\nFor Construction Period\nNo.of Reports=18, No.of Copies per Report =6 \nTotal=18X6=108 Copies\nFor DLP Period =0 Copy | 108 | copies | |
64 | 10 | Contingencies\nA fixed amount of Indian Rupees ONE MILLION (Rs.10,00,000.00) shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority.\n | 1 | whole \nperiod |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail