Ministry Of Road Transport And Highways has published Consultancy Services For Authority Engineer For Supervision Of Balance Work Of Construction Of Two/Four Lane With Paved Shoulder From Km . 422 . 00 To 523 . 600 ( Chitradurga To Shivamogga Section ) Of Nh-13 In The State Of Karnataka On Epc Mode. Submission Date for this Tender is 15-03-2021. Highway Construction Tenders in Chitradurga to Shivamogga section of NH-13 Karnataka. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Mar-2021 | Addendum-I | Other | 15-03-2021 |
Name of Work: CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF BALANCE WORK OF CONSTRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM 422.000 TO KM 523.600 (CHITRADURGA TO SHIVAMOGGA SECTION) OF NH-13 IN THE STATE OF KARNATAKA ON EPC MODE (Job No: NH-13-KNT-2020-21-915) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | KEY PERSONNEL: | item 1 | ||
2 | 1.1 | Team Leader cum Senior Highway Engineer | item 2 | 45 | months |
3 | 1.2 | Resident cum Highway Engineer | item 3 | 90 | months |
4 | 1.3 | Bridge/Structural Engineer | item 4 | 45 | months |
5 | 1.4 | Senior Pavement Specialist | item 5 | 8 | months |
6 | 1.5 | Senior Quality cum Material Expert | item 6 | 30 | months |
7 | 1.6 | Road Safety Expert | item 7 | 25 | months |
8 | 2 | SUB-PROFESSIONAL STAFF | item 8 | ||
9 | 2.01 | Survey Engineer | item 9 | 70 | months |
10 | 2.02 | Assistant Highway Engineer | item 10 | 150 | months |
11 | 2.03 | CAD Expert | item 11 | 12 | months |
12 | 2.04 | Environmental Engineer | item 12 | 8 | months |
13 | 2.05 | Assistant Bridge Engineer | item 13 | 120 | months |
14 | 2.06 | Assistant Quality cum Material Engineer | item 14 | 90 | months |
15 | 2.07 | Electrical Engineer | item 15 | 7 | months |
16 | 2.08 | HTMS/Toll Expert | item 16 | 3 | months |
17 | 2.09 | Quantity Surveyor | item 17 | 38 | months |
18 | 2.1 | Horticulture cum Landscaping Expert | item 18 | 9 | months |
19 | 3 | SUPPORT STAFF | item 19 | ||
20 | 3.1 | Office Manager (1 No) | item 20 | 90 | months |
21 | 3.2 | Accountant cum Cashier (1 No) | item 21 | 90 | months |
22 | 3.3 | Steno cum Computer Operator (2 Nos) | item 22 | 180 | months |
23 | 3.4 | Office Boy ( 3 no) | item 23 | 270 | months |
24 | 4 | Transportation (Fixed cost)The vehicles provided by consultants shall include the cost of rental/Fuel/Drivers,operations,maintainence,repairs, insurance etc all complete approximate 3000 Km/ month run | item 24 | ||
25 | 4.1 | Toyota Innova/ Mahindra XUV or equivalent (not more than 3 years old) | item 25 | 30 | months |
26 | 4.2 | Maruti Suzuki Dzire Tours / Mahindra TUV/ Maruthi Suzuki Ertiga or equivalent (not more than 3 years old) | item 26 | 60 | months |
27 | 5 | Duty Travel to site (Fixed costs) (For all lengths of the project): Professional and sub Professional Staff | item 27 | ||
28 | 5.1 | Site to Employer HQ for Key Professionals | item 28 | 20 | trips |
29 | 5.2 | Site to Employer Regional Office for Key Professionals | item 29 | 20 | trips |
30 | 6 | Office Rent (Fixed Costs): The rent cost includes electricity and water charges, maintainence, Clearing, Repairs, etc.complete | item 30 | ||
31 | 6.1 | Minimum 200 sqm area of office shall be rented | item 31 | 30 | months |
32 | 6.2 | Minimum 100 sqm area of office shall be rented | item 32 | 60 | months |
33 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) | item 33 | ||
34 | 7.1 | Office Supplies | item 34 | 90 | months |
35 | 7.2 | Drafting Supplies | item 35 | 90 | months |
36 | 7.3 | Computer Running Costs | item 36 | 90 | months |
37 | 7.4 | Domestic and Internation Communication | item 37 | 90 | months |
38 | 8 | Office Furniture and Equipment (Rental) | item 38 | ||
39 | 8.1 | During Construction period The Cost shall be include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(10 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-4 GB, HDD-1 TB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (5 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required) etc | item 39 | 30 | months |
40 | 8.2 | During Maintenance Period: The Cost shall be include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (1 external & 3 internal lines), photocopier (15ppm, 2000 copies per month with A3 & A4 input) fax machine, PCs(3 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-4 GB, HDD-1 TB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 1000 pages per month, 600x600 dpi or better etc., binding machine (1 no.), overhead projector, AC (2 no., 1.5 Ton), Water Coolers (as required) etc | item 40 | 60 | months |
41 | 9 | Reports and Document Printing | item 41 | ||
42 | 9.1 | Monthly reports (Design and Construction) | item 42 | 270 | each copy |
43 | 9.2 | Half yearly Reports | item 43 | 45 | each copy |
44 | 9.3 | Various others reports as provided in the Concession Agreement such as Completion Report | item 44 | 30 | Nos |
45 | 10 | Road Survey Equipment | item 45 | ||
46 | 10.1 | Surface defects detection and roughness measurement using Network Survey Vehicle | item 46 | 8 | Nos |
47 | 10.2 | Pavement strength measurement using FWD | item 47 | 4 | Nos |
48 | 10.3 | Bridge inspection using Mobile Bridge Inspection Unit | item 48 | 8 | Nos |
49 | 10.4 | Road signs inspection using Retro Reflectometer | item 49 | 8 | Nos |
50 | 160 | Contingencies Rs 10,00,000 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail