Lowering Laying 200 Mm Dia Line At Yashodhara Colony For Police Colony Supply From Hattesing Pura Esr , Excavation For Foundation / Pipe Trenches In Earth , Soils Of All Types , Sand , Gravel And Soft Murum , Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-20 / Page No . 33 I . No . 1 , Excavation For Foundation / Pipe Trenches In Hard Murum And Boulders , W . B . M . Road Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 33 I . No . 3 , Excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road By All Means Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 33 I . No . 5 , Excavation For Foundation / Pipe Trenches In Hard Rock And Concrete Road By Chiselling , Wedging , Line Drilling By Mechanical Means Or By All Means Other Than Blasting Including Trimming And Levelling The Bed , Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 34 I . No . 7 , Providing D . I . Pipes ( Push On Joints Pressure Pipes Of Di Of Following Class And Diameters Confirming To The Is Specification Inclusive Cost Of Jointing Materials ( Rubber Gasket Of Epdm Quality ) Excluding Gst Levied By Goi & Gom In All Respect Including Third Party Inspection Charges Of Tpi Agency Approved By Mjp Including Transit Insurance , Railway Freight , Unloading From Railway Wagon , Loading Into Truck , Transportation To Departmental Store / Site Of Work , Unloading , Stacking Etc . Complete As Directed By Engineer Incharge . ( Is-8329:2000 For Pipes & Is-158:1969 & Is-12820:1989 Or Latest Edition / Revision With Amendments For Rubber Gasket . ) Di K-7 Grade Mjp / Dsr / 2019-2020 / Page No . 59 I . No . 3 , 200 Mm , Lowering , Laying And Jointing With Sbr Rubber Gaskets C . I . & D . I . Pipes Of Various Classes With Ci / Ms Specials Of Following Diameters In Proper Position , Grade And Alignment As Directed By Engineer-In-Charge Including Conveyance Of Material From Stores To Site Of Work , Excluding Cost Of Jointing Materials And Rubber Rings , Including Labour , Etc Complete . Note: Only Sbr Rubber Gaskets To Be Used As Per Is- 5382 / 12820 Mjp / Dsr / 2019-2020 / Page No . 58 I . No . 2 ( A ) , 200 Mm , Providing And Supplying C . I . Detachable Joints Suitable For A . C . Pressure Pipes Manufactured As Per Is- 1538 / 1993 Standards Of Following Class And Dimeter Including Cost Of Insurance , Railway Freight , Inspection Charges , Unloading From Railway Wagon , Loading Into Truck , Transporting To Departmental Store , Unloading , Stacking And Cost Of Rubber Rings , Nut Bolts , Excluding Gst Levied By Goi & Gom In All Respect Etc . Complete . Mjp / Dsr / 2019-2020 / Page No . 64 I . No . 13 , Class 10 / 15 , 200 Mm , Refilling The Trenches With Available Excavated Stuff With Soft Material First Over Pipeline And Then Hard Material In 15 Cm Layers With All Leads And Lifts Including Consolidation , Surcharging , Etc . Complete . Mjp / Dsr / 2019-2020 / Page No . 36 I . No . 15