}

Supplying Labour, Materials And T&P For Laying Of Pipelines, Construction Of Valve Chambers,Construction Of 30 Kl Ltrs Capacity Rcc Esr,Providing 100% Functional House Tape Connections With 5 Years Operation And Maintenance Etc.In Connection With To Pws T, PWS to Sunakhala under Patrapur Block-Odisha

Rural Water Supply And Sanitation Circle has published Supplying Labour, Materials And T&P For Laying Of Pipelines, Construction Of Valve Chambers,Construction Of 30 Kl Ltrs Capacity Rcc Esr,Providing 100% Functional House Tape Connections With 5 Years Operation And Maintenance Etc.In Connection With To Pws T. Submission Date for this Tender is 10-02-2021. Building Work Tenders in PWS to Sunakhala under Patrapur Block Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

26741200
Supplying Labour, Materials And T&P For Laying Of Pipelines, Construction Of Valve Chambers,Construction Of 30 Kl Ltrs Capacity Rcc Esr,Providing 100% Functional House Tape Connections With 5 Years Operation And Maintenance Etc.In Connection With To Pws T
Open Tender
Indian
Odisha
PWS to Sunakhala under Patrapur Block
10-02-2021

Tender Details

Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers,Construction of 30 KL ltrs capacity RCC ESR,providing 100% functional house tape connections With 5 years operation and Maintenance etc.in connection with to PWS to Sunakhala under Patrapur Block. Pws To Sunakhala Under Patrapur Block Laying Of Pipelines , Construction Of Valve Chambers , Construction Of 30 Kl Ltrs Capacity Rcc Esr , Providing 100Percent Fhtc With 5 Years O And M Etc . In Connection With To Pws To Sunakhala Under Patrapur Block

Key Value

Document Fees
INR 6000 /-
EMD
INR 45440.0 /-
Tender Value
INR 45.44 Lakhs /-

BOQ Items

Name of Work: Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers,Construction of 30 KL ltrs capacity RCC ESR,providing 100% functional house tape connections With 5 years operation and Maintenance etc.in connection with to PWS to Sunakhala under Patrapur Block.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Laying of pipe line ,Head works, Other Balance Works BI01010001010000000000000515BI0100001112
2 1.01 Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post,recharge pit,display board, bore well platform,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. BI01010001010000000000000515BI0100001113 1 Nos
3 1.02 Construction of 30,000 LTR OHR WITH 10M STAGING\nSupplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 30,000 ltrs capacity with necessary staging height of 10 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR at his own cost) BI01010001010000000000000515BI0100001114 1 Nos
4 1.03 The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H) BI01010001010000000000000515BI0100001116 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail