}

Work Of Annual Maintenance/Supervision Of Lighting , L . T . System And Complete Air Conditioning System And Other Associated Works At 400 Kv S/S Moradabad Under Electricity 400 Kv Sub-Station Division Moradabad, MORADABAD-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Work Of Annual Maintenance/Supervision Of Lighting , L . T . System And Complete Air Conditioning System And Other Associated Works At 400 Kv S/S Moradabad Under Electricity 400 Kv Sub-Station Division Moradabad. Submission Date for this Tender is 05-02-2021. Electrification Work Tenders in MORADABAD Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26739979
Work Of Annual Maintenance/Supervision Of Lighting , L . T . System And Complete Air Conditioning System And Other Associated Works At 400 Kv S/S Moradabad Under Electricity 400 Kv Sub-Station Division Moradabad
Open Tender
Indian
Uttar Pradesh
MORADABAD
05-02-2021

Tender Details

Work Of Annual Maintenance / Supervision Of Lighting , L . T . System And Complete Air Conditioning System And Other Associated Works At 400 Kv S / S Moradabad Under Electricity 400 Kv Sub-Station Division Moradabad

Key Value

Document Fees
INR 590 /-
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:WORK OF ANNUAL MAINTENANCE/SUPERVISION OF LIGHTING, L.T. SYSTEM & COMPLETE AIR CONDITIONING SYSTEM & OTHER ASSOCIATED WORKS AT 400 KV S/S MORADABAD UNDER ELECTRICITY 400 KV SUB-STATION DIVISION MORADABAD
Sl. No. Description of Work Item Code / Make Quantity Units
1 1 The Following works are to be carried out at 400 KV Sub-Station Moradabad under Electy. 400 KV Sub-Station Division, Moradabad.
2 1.01 Sub-Station Lighting & L.T. (0.4 KV) System :-
3 1.02 Supervision and daily maintenance of 3 Phase LT System at 400 KV S/S Moradabad, alongwith A.C.D.B.s, Power Cubicles & receptacles. Complete A.C. supply maintenance and lighting-maintenance of 400/220 KV Switchyard, Control Room, Conference Room, Carrier Room, DG/Mulsifire Room, Battery Room. Work also included the complete lighting and electric maintenance of streetlights, peripheral lights, and 400 KV colony/quarter electric and lighting daily maintenance :- 12 Months
4 1.03 1)-630 KVA, 33/0.4 KV Station Transformer & 02 Nos.
5 1.04 2)-400KV line & Transformer inter locking cubical- 07 Sets.
6 1.05 3)- Street Lighting Panel – 04 Sets.
7 1.06 4)- 400 A, 415 Volt, Receptacles for oil Filtration – 04 Sets.
8 1.07 5)- 400 Amp, 415 V A.C. Power plugs – 10 Sets.
9 1.08 6)- Switch Board with 05 Nos. 5 A Switch/15 Amps – 42 Sets.
10 1.09 7)- DC Lighting Panel – 01 Sets.
11 1.1 8)- Emergency Light Panel – 01 Sets.
12 1.11 9)- 415 V A.C. Distribution Box – 16 Sets.
13 1.12 Lighting system of Sub-Station :-
14 1.13 1)- High Mask Lighting system (complete) – 03 Sets.
15 1.14 2)- 120 Watt, LED – 44 Nos.
16 1.15 3)- Peripheral Light 60 Watt LED – 24 Nos.
17 1.16 4)- J.E. Office – 07 Nos.
18 1.17 5)- AE (M-I & II) Office – 40 Nos.
19 1.18 6)- Division Office – 30 Nos.
20 1.19 7)- Adm. Building, D.G. Room, Mulsifire room, Battery Room etc. – 75 Nos.
21 1.2 8)-DC Emergency Light-24 Nos.
22 1.21 Work included the day to day maintenance of 33/0.4 KV station supply system from 220 KV S/S MBD to 400 KV S/S.
23 1.22 (For a period of 12 Month only)
24 1.23 Servicing of Blue Star make Air-cooled ducted packaged A.C. (Floor mounted) type DPA, model no. DPA1983R1-A, 415 Volt 3 phase 50 Hz supply, A.C. having capacity (16.5 x 5 Ton = 82.5 Ton) by complete cleaning of filter of cooling coil, gas top up and outer units by removing of cooling coil filter and filter assembly for cleaning by special cleaning chemical agent for removing dust and rust in coil assembly and make them clear of any type of scaling including cost of material. (The date of Start of work will be as per direction of engineer Incharge ). 1 Job
25 1.24 The work included also Checking of compressor for its proper functioning, the defective compressor will be replaced. The entire refrigeration system will be checked for any leak and attended as per site requirements. Safety controls such as pressure cut outs will be tested for proper functioning and in case of any mal-functioning that will be either repaired or replaced accordingly. Refrigeration gas will be topped up as and when required. Existing heating system overhaul with Consumables heating element temperature thermostat etc. work involves Maintaining auto temperature at = 2degC for ambient temperature during winters. \nEXCLUSIONS- Main electrical panel, electrical cabling for the units. Replacement of condenser coil, evaporator coil. Any physical damage of Expansion valve, dryer site glass, copper pipe & condensing unit 12 Job
26 1.25 Note : (i)- All consumables material will be provided by the department.\n(ii)- Skilled, unskilled Labour and T&P will be provided by the contractor.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail