}

Installation Of 1No New Stw ( S ) Within Coochbehar ( Ai ) Divn In Coochbehar-I Block At Ghughumari Mouja , Sub-Project Id Wi202131309m039 , Pic No R261903888 Project Codep2020100000000004166 In Cooch Behar District Under Ridf Xxvi Tranche, COOCHBEHAR-West Bengal

Water Resources Department-WRD has published Installation Of 1No New Stw ( S ) Within Coochbehar ( Ai ) Divn In Coochbehar-I Block At Ghughumari Mouja , Sub-Project Id Wi202131309m039 , Pic No R261903888 Project Codep2020100000000004166 In Cooch Behar District Under Ridf Xxvi Tranche. Submission Date for this Tender is 09-02-2021. Tube Well Tenders in COOCHBEHAR West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

26730201
Corrigendum : Installation Of 1No New Stw ( S ) Within Coochbehar ( Ai ) Divn In Coochbehar-I Block At Ghughumari Mouja , Sub-Project Id Wi202131309m039 , Pic No R261903888 Project Codep2020100000000004166 In Cooch Behar District Under Ridf Xxvi Tranche
Open Tender
Indian
West Bengal
COOCHBEHAR
09-02-2021

Tender Details

Installation Of 1No New Stw ( S ) Within Coochbehar ( Ai ) Divn In Coochbehar-I Block At Ghughumari Mouja , Sub-Project Id Wi202131309m039 , Pic No R261903888 Project Codep2020100000000004166 In Cooch Behar District Under Ridf Xxvi Tranche

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Feb-2021 CORRIGENDUM01 Technical Bid 06-02-2021
2 07-Feb-2021 Due Date Extended Admin Corrigendum Date Extend 09-02-2021

Key Value

Document Fees
Refer document
EMD
INR 7500.0 /-
Tender Value
Refer document

BOQ Items

Installation of 1no new STW (S) within Coochbehar (AI) Divn in Coochbehar-I Block at Ghughumari Mouja, Sub-Project ID WI202131309M039, PIC No R261903888 Project CodeP2020100000000004166 in Cooch Behar District under RIDF XXVI Tranche
Sl. No. Item Description Item Code / Make Quantity Units
1 1 1.A. PVC PIPES & ACCESSORIES FOR DRILLING & WTA: Item01
2 1.01 a) 100 mm Nominal dia 5.0 mm wall thickness medium casing ( CM ) PVC pipe as per IS 12818 Pipe should be standard length of 6 m Item02 18 m
3 1.02 a) 100 mm outside dia screen ( ribbed ) pipe 5.0 mm wall thickness as per IS : 12818 Standard length of strainer shoulb be 2 m Item03 12 m
4 1.03 Lay flat hose of 75 mm nominal size polyester reinforced layflat hose ( The hose should have wall thickness 1.3 +-0.3 mm working pressure 3.0 kg / sq.m and bursting presure 9 kg / sq. m. The lay flat hose should have a standard length of 100 / 200 m roll Item04 100 m
5 1.04 TOTAL SUPPPLY OF MATERIALS Item05 1 Item
6 2 2. DRILLING Item06
7 2.01 a) Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil ncluding hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore.\n Item07
8 2.02 ii) for Lowering 100 mm dia tube well Item08 60 metre
9 2.03 N.B.:-(a) Measurement will be taken below Ground Level taking Ground Level as zero for payment. Item09
10 2.04 Labour charges for lowering of pipe, strainers, blank pipe etc. and fitting, fixing the same including cutting, threading where necessary complete including bucket washing and other incidental works in this connection. Item10
11 2.05 i) 100 mm dia PVC Pipe bottom plug with cutter. Item11 3 metre
12 2.06 ii) 100 mm dia ribbed screen/strainer. Item12 12 metre
13 2.07 iii)100 mm dia PVC blank pipe. Item13 45 metre
14 2.08 Supplying and filling up of the annular space between the Well Pipe and the bore hole by coarse sand including watering as necessary as per direction of the Engineer-in-Charge. Item14 1.75 m3
15 2.09 Supplying, fitting and fixing including supplying of suitable jointing compound for fixing in position, threading, if necessary etc. all complete. Item15
16 2.1 (a) 100 mm. dia. CI cutter piece upto 450 mm. long with socket. Item16 1 each
17 2.11 b) 80/100 mm dia M.S. threaded top cap fixed in position Item17 1 each
18 2.12 c) 80x80x40mm dia G.I. Pendent / Bombay Tee Item18 1 each
19 2.13 d) 40 mm dia MAYA Hand pump Item19 1 each
20 2.14 e) 50 mm long 40 mm dia G.I. Nipple Item20 1 each
21 2.15 f)250 x 50 x 6 mm thick, 100 mm dia, M S Supporting clamp with 2 nos 12 mm dia 65 mm long bolts, nuts,washer, on each side. Item21 1 set
22 2.16 Embedding the clamped neck of the tube well below ground level in 1:2:4 cement concrete with 20 mm down stone/ local gravels including cutting earth etc all complete as per direction of Engineer-incharge. Item22 0.162 Cum
23 2.17 Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of centrifugal pump set and other fittings as necessary all complete Item23 1 Each
24 2.18 Labour charges for testing of 5 H.P. Pump set at site for at least 1 (one) hour including supplying necessary fuels and lubricants. Item24 1 Each
25 2.19 Charges for Mobilisation of drilling equipments, tools & plants etc and transportation of of departmental materials from any sub divisional store to work site and returning excess departmental materials if any, to the same sub divisional store after complete Item25 1 Each
26 2.2 TOTAL OF DRILLING Item26 1 Item
27 3 3. A. SOLAR Item27
28 3.01 Solar Module: Supply , transport , installation and commissioning of ISI marked as per IS 14286 and IEC 61853(1), 61730(1&2), 61710 certified Solar Module of Multicrystaline/Monocrystalline/ Monocrystalline PERC/bifacial cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2/4.0 mm tempered glass , framed in anodized aluminium frame .The power output of individual PV modules used in the PV array, under STC, should be a minimum of 300 Watt peak, with adequate provision for measurement tolerances.Modules supplied with the SPV system should have warranty for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Necessary test certificate also to be supplied. Item28
29 3.02 a) For 3 HP Off-grid Solar Water Pumping System with Multicrystalline SPV modules - 3200-3300 Wp. Item29 3250 Wp
30 3.03 Module Mounting Structure ( For 2HP, 3HP and 5HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS 1161/1239, 1079/2062, to hold min 300 Wp SPV Module as per drawing and specification of MNRE . The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be regulated to face the sun optimally. Item30
31 3.04 The weight of the Module Mounting Structure holding 4 Modules should not be less than 195Kgs, holding 6 Modules should not be less than 210 Kg and holding 8 Modules should not be less than 245 Kg. (214.13Kg for 6 module structure + 199 for 4 module structure) Item31 414 Kg
32 3.05 Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. Item32
33 3.06 a) For 6 module structure Item33 2 Each
34 3.07 Power conditioning unit with IP54 enclosure :\nSupply , transport , installation and commissioning of IP 54 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 60068-2-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Over current, Under current, Over voltage, Under voltage, Short circuit etc. System should be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshine.condition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation except for dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc . The system should store the data at a set interval, be capable to transfer it to external storage device and support communication of its operational parameters and logs over Modbus protocol . It should also monitor and save total run time, total water pumped etc . There should be provision for interfacing GPRS based data transmission. Item34
35 3.08 b) For 3 HP capacity Pump-motor set Item35 1 Set
36 3.09 Cable and Accessories :\nSupplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.\ni. 4.0 Sq mm single core multi studs - 10 Mtrs (Minimum)\nii. 6.0 Sq mm single core multi struds -5 Mtrs (Minimum)\niii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc Item36
37 3.1 b) For 3 HP per structure Item37 2 Each
38 3.11 Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:\n By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.\n Item38 2 Each Set
39 3.12 Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 6 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages Item39 20 m
40 3.13 a) Lighting System at Scheme: (with lighting Pole) :\nDusk to dawn lighting arrangement of at 4 mts height with 75 mm x 50 mm G.I. pipe with 12 V, 40Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 11 watt LED lamp , 50 Wp solar panel to cover the scheme area. The lighting system should be warranted for 5years from the date of installation. Item40 1 Set
41 3.14 Lightning protection (Pole mounted): Lightning protection with 3" X 1.5" G.I pipe of (6+1) mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top . Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts, including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing) Item41 1 Each
42 3.15 Supply and installation of 3 phase electromotor pump-motor set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc.:- Item42
43 3.16 b) 3 HP ISI marked 3 phase surface mounted Monoblock Pump-motor having discharge at required head as below::- Item43 1 Set
44 3.17 i) Surface Pump-motor set for STW & Pump Dug Well with discharge of 7.14 Lps at 16 mts. total head with foot valve, required quantity of flexible suction pipe, clamps, bend, footvalves and all other accessories to complete connection of suction and delivery side .\n Item44
45 3.18 Testing and commissioning of scheme after completion of all work Item45 1 Item
46 3.19 Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) Item46
47 3.2 b) For 3 HP surface pump Item47 3250 Wp
48 3.21 Note:\nTotal comprehensive maintenance charge is to be withheld in addition to Securirty Deposit . Security Deposit will be released after expiry of warranty period of 1 year & Comprehensive maintenance charges will be released @ Rs.1.00 for 3 HP per Wp per year at the end of each maintenance period i.e.at the end of 2nd year, 3rd year, 4th year, 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited Item48
49 3.22 Insurance @ 2% for Item No. 1, 4, 8a/8b, and 10 for a period of 5 years. Item49 0.02 Item
50 3.23 Note:2\nIst year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment. Item50
51 3.24 Supplying MS Sign Board as per drawing and direction of the EIC having size 800 x 500 mm made with 35x35x6 mm equal angle and covered with 1.40 mm thick MS sheet welded with angle and fixed with cement concrete(1:1.5:3) every leg position including priming and painting and painting block letters or digit as required all complete. (Anasysis and drawing enclosed.) Item51 1 Item
52 3.25 Supply fitting and fixing of Hot dip Galvanised ( min 80 micron) / Powder Coat painted M.S Kiosk Box / Stainless Steel Kiosk of SS304 of 710(L) X 410(W) X 740(H) and total height with legs is 1670mm for mounting of motor-pump set including transportation, grouting in Cement Concrete as shown in drawing. Item52 1 item
53 3.26 Extra transportation @ 2% for item no. 1 ,2 Item53 0.02 item
54 3.27 TOTAL FOR SOLAR INSTALLATION Item54 1 Item
55 4 TOTAL BASIC COST Item55 1 Item
56 5 GST 18% ON 1.A. Item56 1 Item
57 6 GST 5% ON SOLAR MODULE & PUMP 2(A.) Item57 1 Item
58 7 GST 12% ON REST OF THE ITEM Item58 1 Item
59 8 TOTAL(BASIC COST+GST) Item59 1 Item
60 9 LABOUR CESS 1% (EXCLUDING SUPPLY) Item60 1 Item
61 10 GRAND TOTAL Item61 1 Item
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail