}

Outsourcing Of Services For Operation Of Stps And Sewage Pump Under Age Em At Ge Faizabad, faizabad-Uttar Pradesh

Military Engineer Services-MES has published Outsourcing Of Services For Operation Of Stps And Sewage Pump Under Age Em At Ge Faizabad. Submission Date for this Tender is 22-02-2021. Pump Supply Tenders in faizabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26710288
Corrigendum : Outsourcing Of Services For Operation Of Stps And Sewage Pump Under Age Em At Ge Faizabad
National Competitive Bid
Indian
Uttar Pradesh
faizabad
22-02-2021

Tender Details

Outsourcing Of Services For Operation Of Stps And Sewage Pump Under Age Em At Ge Faizabad

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-Feb-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 22-02-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 19200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Outsourcing of Services for Operation of STPs and Sewage Pump under AGE E/M at GE Faizabad
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Out sourcing of services for operation of Sewage installation at STP Himachal Niwas having capacity 650 KLD complete with following plants and equipments including general maintenance and general cleaning and dusting of installation and surrounding area including Sundays and Holidays with one semi skilled operator in a shift of 08 hrs, one shift per day: - (a) Operation of Non clog Sewage Disposal Pumps (1 working + 1 standby) for pumping of sewerage to Equalisation tank. (b) Operation of Non clog Submersible Pump (1 working + 1 standby) for pumping of sewerage from Equalisation tank to MBBR bed No 1. (c) Operation of Motor operated Air Blower (1 working + 1 standby) for compressed air delivery to Equalisation tank, MBBR Bed No 1 and MBBR Bed No 2. (d) Operation of Floculator for mixing of chemical to treated sewage emerging from MBBR Bed No 2.(e) Operation of Chemical dosing plants to maintain proper percentage of chlorine and other chemicals. In case of non functioning of chemical dosing plants, manual dosing will be done.\n(f) Operation of Centrifugal Pump (1 working + 1 standby) for pumping of treated water from collection tank to final disposal through Multigrade filter and Activated Carbon filter. (g) Operation of valves for disposing precipitated sewerages from Equalisation tank, MBBR Bed No 1, MBBR Bed No 2 and Tube Settler to Sludge Drying Bed. (h) Operation of DG Set 62.5/ 63 KVA including checking of battery water level, coolants, lubricating oil, diesel oil and refilling as per reqmt with general maintenance and continuous monitoring of voltage, current, power factor etc as indicated on the pane`l . (j) Operation of Electric panel for switching ON/ OFF all the equipments including changeovers, MCCBs, Main switches etc and continuous monitoring of voltage, current, power factor etc as indicated on the panel . (k) Checking of tightness of all moving parts. (l) Reporting of fault immediately to the Engr-in-Charge [Note :- (i) The operator should have good working knowledge of Pumps, DG set and Electric Panels.(ii) The operator should be in possession of necessary tools for minor repairs and checking of faults like spanners, Combination pliers, Pipe Wrench, test lamp, Screw driver set, and the cost thereof deemed to be included in the quoted rate. (iii) The operator should wear proper uniform on duty and the cost thereof deemed to be included in the quoted rate. A penalty of Rs 50/- per day will be deducted for not wearing proper uniform (iv) The timing of shifts will be 0800 to 1600 HrsReliever should be arranged by the contractor against OFF duties and holidays and the cost thereof deemed to be included in the quoted rate. A penalty of Rs 800/- per shift will be deducted for absent in duty (v) The contractor shall submit proof of payment through Adhaar linked bank account, deposition of EPF and IESI/ insurance before claimimg any payment for outsourced staffs (vi) Contractor should supply daily log sheets to the operator and the log sheets duly filled in should be handed over on next day to the JE E/M in charge] 334 Per Shift
2 2 All as per Item No 01 here-in-before but for Sewage Treatment Plant Kandhar Line of Capacity 550 KLD 334 Per Shift
3 3 Out sourcing of services for operation of Sewage Pump Installations at OGB 32 and Punjab Niwas complete with following plants and equipments including general maintenance and general cleaning and dusting of installation and surrounding area including Sundays and Holidays with one semi skilled operator for 2 shifts of 8 hours per day: -(a) Operation of Non clog Sewage Disposal Pumps (1 working + 1 standby) for pumping of sewerage to STP at Himachal Niwas\n(b) Operation of necessary valves.\n(c) Operation of Electric panel for switching ON/ OFF all the equipments including changeovers, MCCBs, Main switches etc and continuous monitoring of voltage, current, power factor etc as indicated on the panel \n(d) Checking of tightness of all moving parts\n(e) Reporting of fault immediately to the Engr-in-Charge \n[Note :- (i) The operator should have good working knowledge of Pumps and Electric Panels.(ii) The operator should be in possession of necessary tools for minor repairs and checking of faults like spanners, Combination pliers, Pipe Wrench, test lamp, Screw driver set, and the cost thereof deemed to be included in the quoted rate. (iii) The operator should wear proper uniform on duty and the cost thereof deemed to be included in the quoted rate. A penalty of Rs 50/- per day will be deducted for not wearing proper uniform (iv) The timing of shifts will be 0600 to 1400 Hrs and 2nd shift from 1400 Hrs to 2200 Hrs. Reliever should be arranged by the contractor against OFF duties and holidays and the cost thereof deemed to be included in the quoted rate. A penalty of Rs 800/- per shift will be deducted for absent in duty (v) The contractor shall submit proof of payment through Adhaar linked bank account, deposition of EPF and IESI/ insurance before claimimg any payment for outsourced staffs (vi) Contractor should supply daily log sheets to the operator and the log sheets duly filled in should be handed over on next day to the JE E/M in charge] 668 Per Shift
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail