Upgradation/Modernisation Of Existing Parks . Spl Work Design , Supply , Installation , Testing And Commissioning Of Prefabricated Packaged/Portable Container Based Waste Water Treatment Plants Having Capacity Of 25 Kld Including Operation And Mainten, AS PER NIT DOCUMENTS-Delhi

Delhi Development Authority-DDA has published Upgradation/Modernisation Of Existing Parks . Spl Work Design , Supply , Installation , Testing And Commissioning Of Prefabricated Packaged/Portable Container Based Waste Water Treatment Plants Having Capacity Of 25 Kld Including Operation And Mainten. Submission Date for this Tender is 08-02-2021. Water Treatment Plant Tenders in AS PER NIT DOCUMENTS Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

26708863
Corrigendum : Upgradation/Modernisation Of Existing Parks . Spl Work Design , Supply , Installation , Testing And Commissioning Of Prefabricated Packaged/Portable Container Based Waste Water Treatment Plants Having Capacity Of 25 Kld Including Operation And Mainten
Open Tender
Indian
Delhi
AS PER NIT DOCUMENTS
08-02-2021

Tender Details

Upgradation/Modernisation Of Existing Parks . Spl Work Design , Supply , Installation , Testing And Commissioning Of Prefabricated Packaged/Portable Container Based Waste Water Treatment Plants Having Capacity Of 25 Kld Including Operation And Maintenance For 10 Years At Park And Rsp And Cghs At Mayur Vihar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Jan-2021 CORRIGENDUM Date 08-02-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Upgradation/Modernisation of existing parks. Design, Supply, Installation, Testing & Commissioning of Prefabricated Packaged/Portable container based Waste Water Treatment Plants having capacity of 25 KLD including operation and maintenance for 10 years at Park and RSP & CGHS at Mayur Vihar PH.-I Extn. (Specialized Work)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 SCHEDULE 'A' Design, supply, installation, commissioning and testing of fully FRP (steel/metal tanks coated with FRP shall not be accepted) suitable for underground installations and to withstand earth pressure, prefabricated packaged wastewater treatment plant (WWTP) of 25 KLD capacity (from reputed manufactures of make of Daiki Axis/ Fontus/ Ion Exchange/ Thermax or its equivalent approved make from waste water/ sewerage treatment plant manufacturers to the satisfaction of Engineer-in-charge with MBBR technology having treatment process with sedimentation and separation chamber, anaerobic contact media chamber, moving bed chamber (AEROBIC), sedimentation chamber, recirculation of accumulated sludge from sedimentation of 1st chamber, disinfectant chamber, clarified water tank, tertiary treatment processes: pressure sand filter, activated carbon filter etc. including all E & M and civil works for WWTP such as installation of plant/system i/c cost of excavation, preparation of foundation and making good after installation etc. complete in all respect and as per directions of Engineer-in-charge to make the system functional WWTPs shall also be operated and maintained for a period of one year (free of cost) during defect liability period (DLP) after successful testing and commissioning. An amount equal to 10% of Schedule “A” amount shall be withheld for such one year of operation and maintenance during DLP. All consumables and chemicals required for operation, routine, preventive & breakdown maintenance and testing for outlet parameters shall also be borne by the agency during DLP. The FRP WWTP would be portable and shall conform to manufacturer’s specification. For designing purpose, inlet parameters to be considered are: pH : 6.5-8.5 BOD : 250-350 mg/ltr. Total TSS: 250-350 ms/ltr. COD: 400-500 mg/ltr. Fecal Coliform (FC) MPN/100 ml:> 10**7MPN/100ml. And Treated Waste Water Quality shall be: pH: 5.5-9 BOD:< 10 mg/ltr. TSS:<10 mg/ltr. COD, 50 mg/ltr. FC MPN/100 ml: Desireable-100 Permissible – 230. Scope of work is detailed as below:- BI01010001010000000000000515BI0100001112
2 1.01 a)        Packaged and automatic plant of 25 KLD capacity with blowers, media etc. i/c transportation complete. BI01010001010000000000000515BI0100001113
3 1.02 b)        Tertiary treatment Dual Media Filters (DMF) & Activated Carbon Filter (ACF) of capacity 25 KLD to achieve WWTP discharge standards prescribed by CPCB. The FRP vessel filter (Both DMF & ACF) complete with frontal piping and Automatic Multiport Valves with all the required accessories. Filters shall include media, standard fittings like pressure gauges, sampling cock, rinse drain. BI01010001010000000000000515BI0100001114
4 1.03 Filter DiaMinimum : 400 mm. BI01010001010000000000000515BI0100001115
5 1.04 Filter HOS Minimum : 1600 mm. BI01010001010000000000000515BI0100001116
6 1.05 Max Operating Pressure: 10 bar. BI01010001010000000000000515BI0100001117
7 1.06 Activated Carbon Media used for ACF shall be Coconut shell based, with minimum lodine value of 900 IV & minimum bed depth of 600 mm over supporting media. BI01010001010000000000000515BI0100001118
8 1.07 C)        Raw water pumps 2 nos. (1W+1S) of appropriate capacity & approved make. BI01010001010000000000000515BI0100001119
9 1.08 d)        Raw water tank of 10000 litres of HDPE of approved make. BI01010001010000000000000515BI0100001120
10 1.09 e)        Underground treated water tank of 25000 liters capacity of FRP of Sintex or equivalent make. BI01010001010000000000000515BI0100001121
11 1.1 f)        All interconnecting pipes and fittings in CPVC, Sch 20. BI01010001010000000000000515BI0100001122
12 1.11 g)        The control panel shall be fabricated out of 14 gauge CRCA sheet steel. Cable gland plates shall be provided on top as well s at the bottom of the panels. Panels shall be treated with all anticorrosive process before painting as per specifications with 2 coats or red oxide primer and final approved shade of powder coated paint. 2 nos. earthing terminals shall be provided for 1/3 phase, 4 wire, 50 Hz supply system. Panel should be complete with Isolation push button for every equipment and auto manual selection switches. The control shall be one integrated panel with all requisite controls for Raw Water Pump, Air Blowers & With Automatic Water Level Control. The panel shall be programmed for Auto operation & start up to requisite equipment as per indication from Water Level Controllers installed Treated Raw water tanks complete with all interconnecting can be and fittings. BI01010001010000000000000515BI0100001123
13 1.12 h)        Bulk meter. BI01010001010000000000000515BI0100001124
14 1.13 i)        All arrangements for supply of treated water for the area i/c cost of pump of required capacity. BI01010001010000000000000515BI0100001125
15 1.14 j)        Making necessary connections with existing irrigation pipe network of the park along-with pump having appropriate capacity as per site requirement/ direction of Engineer-in-charge. BI01010001010000000000000515BI0100001126
16 1.15 k) Providing steel framed shelter of adequate size and height for housing tertiary units, pumps, blowers, panels, etc. using pre-coated GI profile sheets of approved brand of minimum thickness of 0.53 mm with walls, roofs, flooring, locking arrangements, etc. complete as per the requirement /directions of Engineer-in-Charge. BI01010001010000000000000515BI0100001127
17 1.16 l) Any other items not specified/indicated in the contract but essentially required for satisfactory functioning of the plant will be deemed to have been included and same shall be executed bythe agency after approved of the Engineer-in-charge. BI01010001010000000000000515BI0100001128 1 Each
18 2 SCHEDULE B
19 2.01 COMPREHENSIVE OPERATION & MAINTENANCE OF WWTP of 25 KLD capacityand all other allied works/structures etc. created under the contract for a period of 9 years after expiry of defect liability period/free service period of 12 months on commissioning of WWTPs including all cost of labour, consumables, chemicals, repair/replacement of E & M parts, testing of outlet parameters etc. as required. Year wise amount to be quoted in this BOQ Payment to be shall be released on quarterly on pro rata bases. No payment shall be made on account of any escalation or prices. Duties during o & M, plant shall be run 24/7. Adequate operators to be provided for proper plant operation. Treated water quality target should be monitored by random sampling. The scope of item includes monthly comprehensive maintenance for the WWTP (i/c tertiary treatment) including all spared supply and consumables. Electricity supply for the plant will be provided by DDA. The O & M will commence from one year from the commissioning date. The contractor to submit Bank Guarantee at (BG) the end of free maintenance period of one year for an amount equivalent to yearly O & M amount before release of 1st RA bill for O & M. The security deposit @ 2.5% deducted shall be released after completion of maintenance period to the entire satisfaction of Engineer-in-Charge. Non-compliance of O & M requirement shall make the agency liable for recovery from the security deposit and/ or BG with DDA.
20 2.02 2nd Year 1 Each
21 2.03 3rd Year 1 Each
22 2.04 4th Year 1 Each
23 2.05 5th Year 1 Each
24 2.06 6th Year 1 Each
25 2.07 7th Year 1 Each
26 2.08 8th Year 1 Each
27 2.09 9th Year 1 Each
28 2.1 10th Year 1 Each
29 3 Terms & Conditions:-
30 3.01 (i)                TheagencyshallprocureFRPPrefabricatedunitwithpackagedwastewatertreatmentplant(WWTP/STP)of25KLDcapacityasrequiredin the work from reputed manufactures of make of Daikai Axis/Fontus/Ion Exchange/Thermax or its equivalent approved make from waste water/ sewerage treatment plant manufacturerscomplying/confirmingtoISI/BISorinternationalstandardlikeISOcertificationetc.TheagencywillsubmitthespecificationsofWWTP/STP of 25 KLDcapacity.
31 3.02 II)                The Maintenance of WWTP/STP shall be carried out by the agency for 10 years after completion of work. The agency shall quote the rate accordinglylookinginto operation &maintenance for a periodof10years(including1styearfreemaintenance).Theamountofannualmaintenanceshall bepaid aftercompletionofeverythreemonthson pro rata basis. No payment shall be made on account of any escalation or prices.The O & M will commence fromcommissioning date (including free Ist year free O&M). The contractor to submit Bank Guarantee at (BG) the end of first year for an amount equivalent to yearly O & M amount before release of 1st RA bill for O & M.Thesecuritydeposit@2.5%deductedshallbereleasedaftercompletionofmaintenanceperiodtothe entire satisfaction of Engineer-in-charge. Non-compliance of maintenance, the proportionate amount shall be recovered from the amount withheld.TheagencyshallattendthemaintenanceoftheWWTP/STPasandwhennoticed/reportedbythedepartment.
32 3.03 (iii)                The defect liability and safety of the WWTP/STP plant and its accessories during contract period (Construction, installation, commissioning and 10 years O & M) shall be sole responsibility of the contractor/agency.
33 3.04 (iv)                ElectricityattheworksiteshallbeprovidedbyDDAforO&MoftheWWTP/STP plant.
34 3.05 (v)                Thecost ofpipelinesupto50mtr.ofplantsandfittingsareincludedintheratesofWWTP/STP.
35 3.06 (vi)                PenaltyofRs.2500/-perdayshallbeimposedonthecontractorfornon-providingO&Mworkiftheplantisnotrestoredin48hoursonany single day due to his own fault except FORCEMAJEURE.
36 3.07 (vii)                Performance guarantee on the completion of work Schedule ‘A’ shall be released proportionately of amount of work and yearly for maintenance period on pro-rata basis.
37 3.08 (viii)                Completion of Schedule ‘A’ shall be recorded on the completion of work under Schedule ‘A’ successfully and supplementary agreement shall be drawn for comprehensive O & M work after completion of one year O & M at force of cost for a period of 9 years.
38 3.09 (ix)                The agency is required to conduct water test of the treated water monthly to ascertain the required parameters as per terms and condition of the NIT from beginning to till completion of the maintenance period. Payment shall only be released after achieving the standards as per terms and condition of the NIT.
39 3.1 (x)                An additional security @ 10 % of the capital cost shall be recovered from the bill of the agency for a period of 10 years/ equal to the period of warranty / guarantee period provided by the manufacturer and can be released against bank guarantee/ FDR .
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail