Kerala State Electricity Board-KSEB has published Vi Work At Gumpe St Colony Under Electrical Section, Paivallike. Submission Date for this Tender is 06-02-2021. Electrification Work Tenders in PAIVALLIKE Kerala. Bidders can get complete Tender details and download the document.
Name of Work: VI WORK AT GUMPE ST COLONY UNDER ELECTRICAL SECTION, PAIVALLIKE | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site\n(transport by vehicle). | 60 | Nos | |
2 | 2 | Loading LT PSC pole from the stacking place and unloading the same at work site\n(transport by vehicle). | 13 | Nos | |
3 | 3 | Transporting poles by hired vehicle to a distance upto\n5km and carrying upto 4 poles excluding loading &\nunloading. | 18 | Trip | |
4 | 4 | Transporting poles by hired vehicle to a distance beyond\n5km and carrying upto 4 poles. (Running km). | 95 | km | |
5 | 5 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to\n250kVA Transformers / RMUs excluding loading & unloading. | 1 | Trip | |
6 | 6 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging &\nback filling pit, drawing earth leads. | 43 | Nos | |
7 | 7 | Additional rate for providing one disc set on any type of\nHT pole for making cut point. | 93 | Nos | |
8 | 8 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel\ncross arms, digging & back filling pit, drawing earth leads. | 6 | Nos | |
9 | 9 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 97 | Nos | |
10 | 10 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit | 1 | Nos | |
11 | 11 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl.\ndigging & back filling pits. | 1 | Nos | |
12 | 12 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting\ncross arm, insulators, binding etc. | 1 | Nos | |
13 | 13 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 162 | Nos | |
14 | 14 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and\nremoving tree branches wherever necessary. | 2.28 | Km | |
15 | 15 | Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms,\nAB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and\ngiving all HT & LT connections | 1 | Nos | |
16 | 16 | Erecting one 100kVA Transformer to existing DP and giving connections, incl.\nloading & unloading, excluding transportation. | 1 | Nos | |
17 | 17 | Fitting one additional Fuse unit and giving connection from Transformer to fuse\nand DB to LT OH line. | 3 | Nos | |
18 | 18 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite | 5 | Nos | |
19 | 19 | Providing one Coil Earth using GI earth wire, digging separate pit at standard\ndistance away from the pole/structure & backfilling. | 43 | Nos | |
20 | 20 | Conveyance of one km 11kV line materials from section store/stacking place to the\nwork site (excluding poles). | 18.24 | km/km | |
21 | 21 | Fitting one Additional V cross arm in existing single pole incl. conveyance of\nmaterials. | 2 | Nos | |
22 | 22 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole\nincl. conveyance of materials. | 81 | Nos | |
23 | 23 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing\n11kV DP incl. conveyance of materials | 2 | Nos | |
24 | 24 | Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP\nincl. conveyance of materials. | 1 | Nos | |
25 | 25 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators\nand binding the same with LT Line. | 1 | Nos | |
26 | 26 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays,\nstrut etc. and stacking the same. | 26 | Nos | |
27 | 27 | Transferring LT Sph 2/3 wire OH line to newly erected\nHT/LT pole and refitting all items to the new pole. | 12 | Nos | |
28 | 28 | Transferring LT 3ph 4/5 wire OH line to newly erected\nHT/LT pole and refitting all items to the new pole. | 14 | Nos | |
29 | 29 | Dismantling and reconnecting Sph service connection from the OH line incl.\nlowering down the WP portion. | 42 | Nos | |
30 | 30 | Erecting one LT PSC Pole in position incl. digging &\nback filling pit. | 13 | Nos | |
31 | 31 | Providing Stay for LT poles incl. digging & back filling pit. | 17 | Nos | |
32 | 32 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. | 30 | Nos | |
33 | 33 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting\ncross arm etc. removing touchings and conveyance of materials. | 0.275 | km | |
34 | 34 | Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling existing\n2 conductors, stringing 3\nRabbit & 1 Weasel incl. conveyance. | 1.315 | km | |
35 | 35 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat\nand 8 mm MS rod as specified, incl cost of transportation & foundation | 24 | m2 | |
36 | 36 | Providing yard metalling with 6mm & 40mm thick blue metal as specified after\nconstructing a curb wall. | 15 | m2 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail