Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Nctps I Es Circle Em I Dn S Dn Iv Time Bound Works Maintenance And Breakdown Works Of Lt Motors And Ht Motors Of Turbine Auxiliaries Of All The Three Units At Nctps I Site For 180 Days. Submission Date for this Tender is 05-02-2021. Motor Work Tenders in NCTPS-I Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: NCTPS - I – ES Circle – EM-I Dn. - S.Dn IV – Time bound works, Maintenance and breakdown works of LT motors and HT motors of turbine Auxiliaries of all the three units at NCTPS-I site for 180 days. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Disconnection of power cable, De-coupling the motor from pump and checking alignment. | BI01010001010000000000000515BI0100001112 | 1 | Opn |
2 | 2 | Removal of foundation bolts, lifting the motor to a convenient location. | BI01010001010000000000000515BI0100001113 | 1 | Opn |
3 | 3 | Lifting of motor, placing at motor bed and tightening of foundation bolts, bed bolts etc. | BI01010001010000000000000515BI0100001114 | 1 | Opn |
4 | 4 | Termination of power cable, coupling the motor with pump, Checking alignment and trial run. | BI01010001010000000000000515BI0100001115 | 1 | Opn |
5 | 5 | OVERHAULING OF LT MOTORS\nCharges for complete overhauling of motor including Dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulation varnish, replacement bearing assembling of both DE and NDE. Motor capacity ranges from 30.1\nto 50 KW(37 KW ASH WATER SUPPLY PUMP MOTOR)\n | BI01010001010000000000000515BI0100001116 | 2 | Opn |
6 | 6 | Motor capacity ranges from 50.1\nto 75 KW(55KW SEA WATER BOOSTER PUMP MOTOR)\n | BI01010001010000000000000515BI0100001117 | 3 | Opn |
7 | 7 | Charges for metal filling, machining and repairing of worn out shafts / bearing seating surfaces of one side, checking of bearing housing, providing sleeves in the end cover of the side. | BI01010001010000000000000515BI0100001118 | 3 | Opn |
8 | 8 | 100 KW AUXILLARY OIL PUMP MOTOR | BI01010001010000000000000515BI0100001119 | 2 | Opn |
9 | 9 | Labour required for metal filling, machining and repairing of worn out shafts/ Bearing seating on DE & NDE side, checking of bearings housings, providing sleeves in the end covers on DE & NDE. | BI01010001010000000000000515BI0100001120 | 2 | Opn |
10 | 10 | 110 KW AUXILIARY COOLING WATER PUMP MOTOR | BI01010001010000000000000515BI0100001121 | 3 | Opn |
11 | 11 | Labour required for metal filling, machining and repairing of worn out shafts/ Bearing seating on DE & NDE side, checking of bearings housings, providing sleeves in the end covers on DE & NDE. | BI01010001010000000000000515BI0100001122 | 3 | Opn |
12 | 12 | 150 KW INSTRUMENT AIR COMPRESSOR MOTOR | BI01010001010000000000000515BI0100001123 | 2 | Opn |
13 | 13 | Labour required for metal filling, machining and repairing of worn out shafts/ Bearing seating on DE & NDE side, checking of bearings housings, providing sleeves in the end covers on DE & NDE. | BI01010001010000000000000515BI0100001124 | 3 | Opn |
14 | 14 | CHARGES FOR REPLACEMENT OF FAILED L.T MOTORS RANGES FROM 4.81 KW TO 15 KW\nCharges for disconnecting the power cable, releasing the motor from its bed, lifting, lowering and transporting the motor to a convenient location, removing of coupling pulley, refixing of coupling pulley after over hauling, transporting the motor to its location, lifting, lowering the motor and placing in motor bed and erection of motor, reconnecting the power cable and including coupling, alignment and coupling the motor with the compressor pump( For the rating from 4.81 KW to 15KW)\n | BI01010001010000000000000515BI0100001125 | 5 | Opn |
15 | 15 | CHARGES FOR REPLACEMENT OF FAILED\nL.TMOTORS RANGES FROM 30.1 KW TO 160KW\nCharges for disconnecting the power cable, releasing the motor from its bed, lifting, lowering and transporting the motor to a convenient location, removing of coupling pulley, refixing of coupling pulley after over hauling, transporting the motor to its location, lifting, lowering the motor and placing in motor bed and erection of motor, reconnecting the power cable and including coupling, alignment and coupling the motor with the compressor or pump ( For the rating from 30.1 KW to 160 KW)\n | BI01010001010000000000000515BI0100001126 | 15 | Opn |
16 | 16 | Consumables and Tools and Plants | BI01010001010000000000000515BI0100001127 | 1 | Opn |