Bharat Coking Coal Limited-BCCL has published Repairing And Maintenance Of Godhar Switching Substation Under Kusunda Area . Repairing And Maintenance Of Godhar Switching Substation . . Submission Date for this Tender is 01-02-2021. Switch Supply Tenders in Kusunda Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work: Repairing and maintenance of Godhar switching substation under Kusunda Area. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Repairing and maintenance of Godhar switching substation under Kusunda Area. | BI01010001010000000000000515BI0100001112 | ||
2 | 2 | Distempering with oil bound washable distemper of approved brand\nand manufacture to give an even shade : Old work (one or more coats) | BI01010001010000000000000515BI0100001113 | 134.52 | Sqm |
3 | 3 | colour washing two or more coats | BI01010001010000000000000515BI0100001114 | 293.15 | Sqm |
4 | 4 | Painting with synthetic enamel paint of approved brand and\nmanufacture of required colour to give an even shade : One or more coats on old work | BI01010001010000000000000515BI0100001115 | 53.87 | Sqm |
5 | 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded\nstone aggregate) finished with a floating coat of neat cement, including\ncement slurry, but excluding the cost of nosing of steps etc. complete: 40 mm thick with 20 mm nominal size stone aggregate | BI01010001010000000000000515BI0100001116 | 50.26 | Sqm |
6 | 6 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | BI01010001010000000000000515BI0100001117 | 21.09 | Sqm |
7 | 7 | Earth work in surface excavation not exceeding 30 cm in depth but\nexceeding 1.5 m in width as well as 10 sqm on plan including disposal\nof excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be\nlevelled and neatly dressed : All kinds of soil | BI01010001010000000000000515BI0100001118 | 0.46 | 100sqm |
8 | 8 | Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth\nlevel : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20\nmm nominal size) | BI01010001010000000000000515BI0100001119 | 6.58 | Cum |
9 | 9 | Supplying and filling in plinth with Jamuna sand under floors, including\nwatering, ramming, consolidating and dressing complete. | BI01010001010000000000000515BI0100001120 | 2.1 | Cum |
10 | 10 | Centering and shuttering including strutting, propping etc. and removal\nof form for : Foundations, footings, bases of columns, etc. for mass\nconcrete | BI01010001010000000000000515BI0100001121 | 1.76 | Sqm |
11 | 11 | Earth work in excavation by mechanical means (Hydraulic excavator) /\nmanual means in foundation trenches or drains (not exceeding 1.5 m in\nwidth or 10 sqm on plan), including dressing of sides and ramming of\nbottoms, lift upto 1.5 m, including getting out the excavated soil and\ndisposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. | BI01010001010000000000000515BI0100001122 | 6.94 | Cum |
12 | 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of\nclass designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | BI01010001010000000000000515BI0100001123 | 3.74 | Cum |
13 | 13 | 12 mm cement plaster finished with a floating coat of neat cement\nof mix : 1:4 (1 cement: 4 fine sand) | BI01010001010000000000000515BI0100001124 | 10.8 | Sqm |
14 | 14 | Colour washing such as green, blue or buff to give an even shade : New work (two or more coats) with a base coat of whiting | BI01010001010000000000000515BI0100001125 | 21.09 | Sqm |
15 | 15 | Earth work in excavation by mechanical means (Hydraulic excavator) /\nmanual means over areas (exceeding 30cm in depth. 1.5 m in width as\nwell as 10 sqm on plan) including disposal of excavated earth, lead\nupto 50m and lift upto 1.5m, disposed earth to be levelled and neatly\ndressed: All kinds of soil | BI01010001010000000000000515BI0100001126 | 25.49 | Cum |
16 | 16 | Clearing grass and removal of the rubbish upto a distance of 50 m outside\nthe periphery of the area cleared. | BI01010001010000000000000515BI0100001127 | 1.0929 | 100sqm |
17 | 17 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001132 | 1 | Nos |