}

Remodeling Of 200Mm Dia To 300Mm Dia Sewerage Pipeline At Rahman Star House And Qadeem Mosque, Hakeempet Under Tolichowki Section, Sd-Iii, O&M Division No.Iii. (1St Call), HYDERABAD-Telangana

Hyderabad Metropolitan Water Supply And Sewerage Board-HMWSSB has published Remodeling Of 200Mm Dia To 300Mm Dia Sewerage Pipeline At Rahman Star House And Qadeem Mosque, Hakeempet Under Tolichowki Section, Sd-Iii, O&M Division No.Iii. (1St Call). Submission Date for this Tender is 27-01-2021. Sewerage Construction Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

26676427
Remodeling Of 200Mm Dia To 300Mm Dia Sewerage Pipeline At Rahman Star House And Qadeem Mosque, Hakeempet Under Tolichowki Section, Sd-Iii, O&M Division No.Iii. (1St Call)
Open Tender
Indian
Telangana
HYDERABAD
27-01-2021

Tender Details

Remodeling Of 200Mm Dia To 300Mm Dia Sewerage Pipeline At Rahman Star House And Qadeem Mosque, Hakeempet Under Tolichowki Section, Sd-Iii, O&M Division No.Iii. (1St Call)

Key Value

Document Fees
Refer document
EMD
INR 6541.0 /-
Tender Value
INR 6.54 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Remodeling SWG pipeline Standard specification 19.52 One cum 5948.00 116104.96
Laying of PCC (1:2:4) prop with 6 to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads delifts form work laying in position, vibrating, compacting, curing, removal all labour charges, tools and plants and all other incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For Road restortion). (Beedding at bends&Petestal)
2 Remodeling SWG pipeline Standard specification 80.49 One cum 132.40 10656.88
Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
3 Remodeling SWG pipeline Standard Specification 45.00 One Rmt. 423.00 19035.00
Supply, laying jointing and testing 100mm SWG 1st class pipes with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 5? depth and refilling with watering and tamping etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
4 Remodeling SWG pipeline Standard Specification 10.00 One Rmt. 201.00 2010.00
Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.
5 Remodeling SWG pipeline Standard specification 184.17 One cum. 34.90 6427.53
Refilling the pipe line trenches with using excavated soils other than sand with standard specification including watering and tamping in layers of 225mm etc., complete to the finished item as directed by the H.M.W.S.&.S. Board Engineers.
6 Remodeling SWG pipeline Standard Specification 190.20 One Rmt 46.00 8749.20
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (200mm dia SWG)
7 Remodeling SWG pipeline Standard specification 380.00 One Rmt 128.69 48902.20
Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6\0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers.
8 Remodeling SWG pipeline Standard specification 30.00 Each 873.00 26190.00
Construction of 0.9mx0.9m Sewer manhole upto 0.10 m addl. depth with cement bricks in CM (1:6) prop: with CC Bed 1:4:8 prop: benching with CC 1:2:4 prop: internal plastering 20mm thick in CM 1:3 prop: and external platering 12mm thick in CM 1:6 prop: including cost of all materials, fixing of CI steps and only fixing charges FRC cover and frames etc. complete as directed by the HMWS&SB Engineers.
9 Remodeling SWG pipeline Standard specification 13.00 Each 12588.00 163644.00
Construction of 0.9mx0.9m Sewer manhole upto 1 m depth with cement bricks in CM (1:6) prop: with CC Bed 1:4:8 prop: benching with CC 1:2:4 prop: internal plastering 20mm thick in CM 1:3 prop: and external platering 12mm thick in CM 1:6 prop: including cost of all materials, fixing of CI steps and only fixing charges FRC cover and frames etc. complete as directed by the HMWS&SB Engineers.
10 Remodeling SWG pipeline Standard specification 190.20 One Rmt 421.00 80074.20
Lowering the 300mm dia SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers.
11 Remodeling SWG pipeline Standard specification 61.52 One cum. 246.00 15133.92
Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an initial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For Sewer manholes).
12 Remodeling SWG pipeline Standard specification 203.14 One cum. 343.00 69677.02
Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an initial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For Sewer Pipeline).
13 Remodeling SWG pipeline Standard specification 1.90 One cum 1342.00 2549.80
Cutting of open BT road surface 75mm thickness including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
14 Remodeling SWG pipeline Standard specification 30.42 One cum 2793.00 84963.06
Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail