}

Construction Of Culvert At Sri Balaji Towers In Nizampet Municipal Corporation, MEDCHAL-MALKAJGIRI-Telangana

Municipalities-M has published Construction Of Culvert At Sri Balaji Towers In Nizampet Municipal Corporation. Submission Date for this Tender is 01-02-2021. Culvert Tenders in MEDCHAL-MALKAJGIRI Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

26675550
Construction Of Culvert At Sri Balaji Towers In Nizampet Municipal Corporation
Open Tender
Indian
Telangana
MEDCHAL-MALKAJGIRI
01-02-2021

Tender Details

Construction Of Culvert At Sri Balaji Towers In Nizampet Municipal Corporation

Key Value

Document Fees
Refer document
EMD
INR 27931.0 /-
Tender Value
INR 27.93 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation Carting away the surplus excavated earth from the work site with a 109.49 Cum 58.80 6438.00
Carting away the surplus excavated earth from the work site with a lead of 5.0 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads/drains- 1 cum
2 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-2-9 (17); Filling with useful available excavated earth 69.60 Cum 34.12 2375.00
BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
3 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed 3728.24 Kg 68.24 254415.00
BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
4 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the Design Mix 25.04 Cum 6769.35 169521.00
BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using steel scaffolding pipes, jack props, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for COLUMNS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.
5 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-3-14-(31) - A : Supply and placing of the Design Mix 14.40 Cum 6400.11 92162.00
BLD-CSTN-3-14-(31) - A : Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted
6 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : 1.69 Cum 6400.11 10800.00
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement--Baby Drain walls
7 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : 7.50 Cum 6400.11 48001.00
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement---For Main Drain
8 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-3-10- ( 27 ) Using Hand mixing: Plain Cement concrete 12.15 Cum 5215.78 63372.00
BLD-CSTN-3-10- ( 27 ) Using Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
9 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from 4.80 Cum 913.35 4384.00
BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
10 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-1-A-i -manual means : Earthwork excavation for 274.37 Cum 250.96 68857.00
RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts depth below GL by manual means as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,
11 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-STCL-7 : Dismantling Stone Masonry as per Technical 16.20 Cum 528.07 8555.00
RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
12 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation CONSTRUCTION OF RCC RETAINING WALL 1.00 No 0 0
CONSTRUCTION OF RCC RETAINING WALL
13 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation Carting away the surplus excavated earth from the work site with a 160.48 Cum 58.80 9436.00
Carting away the surplus excavated earth from the work site with a lead of 5.0 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads/drains- 1 cum
14 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-TSRA-17 : Fencing With Welded Hot dipped Galvanised Iron 30.00 Rmt 2220.40 66612.00
RBR-TSRA-17 : Fencing With Welded Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge: Providing 3.0 metre high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be strutted, provided with welded steel wire fabric of Hot dipped Galvanised Iron Chain link mesh 8 gauge and fixed to iron posts of 50 mm x 50 mm x 6 mm and bolts etc. complete in all respects. (MORTH Suggestive )
15 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed 15041.40 Kg 68.24 1026425.00
BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )
16 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in 34.98 Cum 6400.11 223876.00
RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. R.C.C grade M 25 (Design Mix) using 20 mm Graded Metal (MORTH)
17 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-SBST-5-V-i (Chapter-12) ; Plain/reinforced M-25 Design mix 35.20 Cum 6769.35 238281.00
RBR-SBST-5-V-i (Chapter-12) ; Plain/reinforced M-25 Design mix cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH. for height upto 5 m.Using concrete Mixer for sub-structures.
18 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open 2.64 Cum 6400.11 16896.00
RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. R.C.C grade M 25 (Design Mix) using 20 mm Graded Metal (MORTH)--for Haunch Portion of Drains in Vent portion
19 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open 29.15 Cum 6400.11 186563.00
RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. R.C.C grade M 25 (Design Mix) using 20 mm Graded Metal (MORTH)--for Base slab of the Box culvert
20 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation (in accordence with ) RBR-FNDN-4-i : Providing concrete for plain/reinforced 18.48 Cum 5215.78 96388.00
(in accordence with ) RBR-FNDN-4-i : Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.-Nominal mix ( 1 : 4 : 8 )
21 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-2: Collection, Supply and filling of Stone dust from approved 18.48 Cum 913.35 16879.00
RBR-FNDN-2: Collection, Supply and filling of Stone dust from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
22 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: 1.05 Cum 1252.23 1319.00
RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in habitant areas where conVentional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete
23 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual 9.48 Cum 250.96 2379.00
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.
24 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-1- (V-B-i) - In Marshy soils up to 3.00 Mts depth below GL by Mechanical 10.53 Cum 202.55 2133.00
RBR-FNDN-1- (V-B-i) - In Marshy soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in Marshy soils as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.
25 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by 84.27 Cum 110.88 9344.00
RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.
26 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation Cutting open C.C. road surface including stacking of excavated materials 30.80 Cum 2277.00 70132.00
Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
27 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation RBR-STCL-7 : Dismantling of existing structures like culverts, bridges, retaining 184.80 Cum 528.07 97587.00
RBR-STCL-7 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar.
28 Construction of Culvert at Sri Balaji Towers in Nizampet Municipal Corporation CONSTRUCTION OF RCC BOX CULVERTS 1.00 No 0 0
CONSTRUCTION OF RCC BOX CULVERTS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail