Public Health Engineering Department-PHED has published Design, Construction And Retrofitting/New Scheme Of Piped Water Supply Scheme Under Jal Jeevan Mission At Village 1.Gokulgaon 2.Bhakrada Block-Khandwa Distt. Khandwa Based On Tube Wells/Dugwell Including Installation Of Electric Submersible/Centrifugal Wa. Submission Date for this Tender is 02-02-2021. Pump Supply Tenders in KHANDWA Madhya Pradesh. Bidders can get complete Tender details and download the document.
Name of Work:Design, Construction and Retrofitting/New Scheme of Piped Water Supply Scheme under Jal Jeevan Mission at Village 1.GOKULGAON 2.BHAKRADA Block-KHANDWA Distt. Khandwa based on Tube wells/Dugwell including installation of electric submersible/centrifugal water motor pumps, Construction of 2 Nos R.C.C. Overhead Tank, 1 Nos at BHAKRADA of Capacity 75 KL with 12 M Staging and 1 Nos at Gokulgaon of capacity 75 KL with 12 M staging Construction of sumpwells 1 No of capacity 20 KL and 1 No of Capacity 30 KL, pump houses, laying and jointing of rising main, distribution pipe line system, household tap connections, electric power connections at Tube wells/Sumpwells etc including cost of all material and labour with testing commissioning thereafter 90 Days of successful Trial Run of entire scheme | ||||
---|---|---|---|---|
Item Description | Item Code / Make | Quantity | Units | |
1 | Design, Construction and Retrofitting/New Scheme of Piped Water Supply Scheme under Jal Jeevan Mission at Village 1.GOKULGAON 2.BHAKRADA Block-KHANDWA Distt. Khandwa based on Tube wells/Dugwell including installation of electric submersible/centrifugal water motor pumps, Construction of 2 Nos R.C.C. Overhead Tank, 1 Nos at BHAKRADA of Capacity 75 KL with 12 M Staging and 1 Nos at Gokulgaon of capacity 75 KL with 12 M staging Construction of sumpwells 1 No of capacity 20 KL and 1 No of Capacity 30 KL, pump houses, laying and jointing of rising main, distribution pipe line system, household tap connections, electric power connections at Tube wells/Sumpwells etc including cost of all material and labour with testing commissioning thereafter 90 Days of successful Trial Run of entire scheme | 176 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail