}

Balance Work Balance Work Of Construction Of Septic Tank Sub Jail Karera Distt . Shivpuri, WORKS-Madhya Pradesh

Public Works Department-PWD has published Balance Work Balance Work Of Construction Of Septic Tank Sub Jail Karera Distt . Shivpuri. Submission Date for this Tender is 02-02-2021. Septic Tank Tenders in WORKS Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26657906
Balance Work Balance Work Of Construction Of Septic Tank Sub Jail Karera Distt . Shivpuri
Open Tender
Indian
Madhya Pradesh
WORKS
02-02-2021

Tender Details

Balance Work Balance Work Of Construction Of Septic Tank Sub Jail Karera Distt . Shivpuri

Key Value

Document Fees
INR 1000 /-
EMD
INR 2670.0 /-
Tender Value
INR 1.33 Lakhs /-

BOQ Items

Name of Work: SCHEDULE OF ITEM FOR BALANCE WORK OF SEPTIC TANK SUB JAIL KARERA DISTT. SHIVPURI (M.P.)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) 2.6 70.87 Cum
2 2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : \n4.1.2 With 40mm nominal size graded stone aggregate. \n4.1.2.1 M 15 - Grade concrete 4.1\n4.1.2.1 5.06 Cum
3 3 Brick work with well burnt chimney bricks in bulls patent trench kiln, crushing strength not less than 25kg /cm2 and water bsorption not more than 20% in foundation and plinth i/c curing etc complete. \n6.3.2 Cement Mortar 1:6 (1 cement : 6 sand). 6.3 9.24 Cum
4 4 12 mm cement plaster of mix : \n13.1.2 1:6 (1 cement : 6 sand) 13.1 46.2 Sqm
5 5 Centering and shuttering including strutting, propping etc. and removal of form for :\n5.9.3 Suspended floors, roofs, landings, balconies and access platform. 5.9\n5.9.3 33.75 Sqm
6 6 Reinforced cement concrete work (with 20mm nominal size graded stone aggregate) in beams, suspended floors, roofs having slope of any degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level and up to floor two level excluding the cost of centering, shuttering, finishing and reinforcement in concrete grade. \n5.3.1 M 20 –Grade Concrete 5.3 4.218 Cum
7 7 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete.\n5.16.4 Hot rolled deformed bars 5.16\n5.16.6 453.9 Kg
8 8 Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. \n\n(i) Single socketed pipes\n13.32.2 110 mm diameter (minimum wall thickness 2.2mm)\n 12.32 20 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail