Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Of Perundurai Division . , SE/EEDC/ERD-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Of Perundurai Division . . Submission Date for this Tender is 29-01-2021. Electric Pole Tenders in SE/EEDC/ERD Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

26636150
Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Of Perundurai Division .
Open Tender
Indian
Tamil Nadu
SE/EEDC/ERD
29-01-2021

Tender Details

Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Works Contract To Carry Out Erection Of Poles And Other Extension Works At West Perundurai Sub Division Of Perundurai Division .

Key Value

Document Fees
Refer document
EMD
INR 25000.0 /-
Tender Value
Refer document

BOQ Items

WORKS CONTRACT FOR West/Perundurai Sub division of Perundurai Division
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation of pole pit size of 2'x2'x6' upto 27'(8.0m) Pole by using JCB or manual item 1 300 Each
2 2 Stay pit 4.5' to 5' by using JCB or manual item 2 200 Each
3 3 Excavation of pole pit size of 2'X2'X6' upto 9.14'mtr Pole by using JCB or manual item 3 150 Each
4 4 Excavation of RSJ pole pit above 30' by using JCB or manual item 4 50 Each
5 5 Hard rock requires without blasting(where houses are located) item 5 50 Each
6 6 Erection of RCC poles/metal poles upto 27'(8.0m) pole by using JCB or manual item 6 300 Each
7 7 i)Erection of PSC poles/metal poles upto 30'(9.14m) pole by using JCB or manual ii)Erection of PSC poles/metal poles upto 30'(9.14m) pole by using JCB or manual iii)Erection of RSJ,Rail,fabricated poles 30'(9.14m) pole by using JCB or manual item 7 200 Each
8 8 Erection of stay set complete item 8 200 Each
9 9 Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms item 9 250 Each
10 10 Fixing of LT 3 phase cross arms item 10 500 Each
11 11 Fixing of LT Single phase ph X arm item 11 300 Each
12 12 Fixing of HT/LT TI fittings item 12 300 Each
13 13 Fixing of HT Pin insulator 22KV /33 KV item 13 700 Each
14 14 Fixing of HT 11KV strain Disc item 14 500 Each
15 15 Fixing of LT pin insulators item 15 2000 Each
16 16 Fixing of LT shackle with MP item 16 2000 Each
17 17 Fixing of Aluminium Knob item 17 750 Each
18 18 Earthing of pole with pin including burying ,looping and binding item 18 250 Each
19 19 Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/4.09mm item 19 5 Per Km
20 20 Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/3.35mm ACSR or 7/3.0 AAAC item 20 25 Per Km
21 21 Paving of Conductor, stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/2.59mm ACSR or 7/2.11ACSR item 21 50 Per Km
22 22 Structure concreting of poles with size (2'x2'x6') including cost of jelly,sand,cement with mixture of 1:3:6 and plastering of concrete with ratio 1:2 item 22 10 Each
23 23 Sleeve concreting with size (2'x2'x3') including cost of excavation jelly,sand,cement with mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials item 23 25 Each
24 24 Stay concreting of stay with size 1.5'x1.5'x3.0' including cost of 40 mm jelly,sand and cement(with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2 item 24 25 Each
25 25 Erection of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -Excavation of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos, erection of pole 2Nos,Excavation of stay pit 4 Nos, erection stay 4set,Mass concreting (Jelly and sand supplied by contractor),Assembling of structure materials Top chennal 1set,Belting and angle and HG fuse angle, Erection of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering, Fixing of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, painting of all clamps and other iron materials and painting of structure poles including paint brushes sundries etc,LTbus bar arrangements, Fixing of danger board,erection of transformer item 25 30 per str(see annexure -II)
26 26 Dismantling of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -dismantling of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos,dismantlingof pole 2Nos,dismantling of stay pit 4 Nos, erection stay 4set,dismantlingof structure materials Top chennal 1set,Belting and angle and HG fuse angle, dismantling of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering,dismantling of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, ,LTbus bar arrangements, dismantling of danger board,erection of transformer. item 26 5 per str(see annexure -II)
27 27 LT split neutral guarding item 27 50 per span
28 28 Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms item 28 10 per span
29 29 HT guarding item 29 35 per span
30 30 Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for below 8 kms item 30 100 Per Tonne
31 31 Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for above 8 Kms for addl. Kms 20 Kmsx100 Tonne item 31 2000 Per Tonne
32 32 Loading of poles 27'.0" item 32 300 Each
33 33 Loading of poles 30'.0"/RSJ pole item 33 200 Each
34 34 Unloading of poles 27'.0" item 34 300 Each
35 35 Unloading of poles 30'.0"/RSJ pole item 35 200 Each
36 36 Transporting of poles from road side to pole per pit including loading and unloading of pole by using JCB or manual up to 200m item 36 150 Each
37 37 Transporting of poles from road side to pole per pit including loading and unloading of pole by using JCB or manual up to 1 KM item 37 225 Each
38 38 Loading or unloading of transformer upto 200KVA for each item 38 30 Each
39 39 Resagging of HT /LT line with ACSR 7/3.35mm item 39 15 Per Km
40 40 Resagging of HT /LT line with ACSR 7/2.59mm item 40 25 Per Km
41 41 Erection of street light including fixture fitting item 41 75 Each
42 42 Erection of street light service item 42 50 Each
43 43 Agriculture service fixing/service item 43 25 Each
44 44 Releasing of grills from RCC poles item 44 100 Each
45 45 Releasing of single phase service and re fixing item 45 375 Each
46 46 Releasing of three phase service and re fixing(upto 50HP) item 46 250 Each
47 47 Releasing of three phase service and re fixing(above 50HP) item 47 25 Each
48 48 Erection for double pole structure D.P)complete with following works -Excavation of pole pit sizing 2'x2'x6',erection of poles, erection of base plate,erection of structure materials, erection of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), erection of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",erection of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor) item 48 10 per str
49 49 Dismantling of double pole structure D.P)complete with following works -dismantling of pole pit sizing 2'x2'x6',dismantling of poles, dismantling of base plate,dismantling of structure materials, dismantling of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), dismantling of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",dismantling of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor) item 49 2 per str
50 50 Labour charges for alteration of back clamps to suit for the works item 50 250 Each
51 51 Labour charges for alteration of stay clamps to suit for the works item 51 125 Each
52 52 Releasing of ACSR/AAAC conductors from conductor drum and colling ACSR 7/3.35,7/2.59,AAAC 7/2.50,7/3.15MM(per km) item 52 25 Per km
53 53 Cutting of cocunut leaves (per tree) item 53 500 Each
54 54 Drilling of hole in channel only 3/4" &1" per hole item 54 2000 Each
55 55 Cutting of flat item 55 150 Each
56 56 Cutting of channel item 56 100 Each
57 57 Cutting of Angle item 57 100 Each
58 58 Cutting of pipe item 58 50 Each
59 59 Dismandling of RCC pole 9.14mtr/RSJ pole item 59 50 Each
60 60 Dismandling of RCC/PSG pole 8.0mtr/7.5mtr item 60 150 Each
61 61 Dismandling of 'V' X arm,channel X arm,guarding X arm(all types) item 61 50 Each
62 62 Dismandling of LT 3 phase X arm item 62 250 Each
63 63 Dismandling of LT single phase X arm item 63 150 Each
64 64 Dismandling of HT/LT TI fitting item 64 50 Each
65 65 Dismandling of 11KV strain disc item 65 100 Each
66 66 Dismandling of 22KV pin insulator item 66 150 Each
67 67 Dismandling of LT shackle item 67 750 Each
68 68 Dismandling of LT pin insulator item 68 500 Each
69 69 Dismandling of Aluminium knob item 69 250 Each
70 70 Dismandling of stay set item 70 150 Each
71 71 Dismandling of ACSR 7/3.35mm conductor item 71 15 KM
72 72 Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor item 72 50 KM
73 73 Dismandling of street light service item 73 50 Each
74 74 Loading of materials item 74 50 Ton
75 75 Unloading of materials item 75 50 Ton
76 76 Loading and stacking of materials item 76 50 Ton
77 77 Resagging of HT line with ACSR 7/4.09mm item 77 1 Per km
78 78 Dismandling of MVL/SVL fitting item 78 15 Each
79 79 Dismandling of 1x40w FTL fitting item 79 25 Each
80 80 Erection of Single pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of structure pole pit 2'x2'x6' by using JCB or manual, Transporing of pole from road side to pole pit by using JCB or manual, Erection of poles by using JCB or manual, Excavation of stay pit by JCB or manual, erection of stay set complete , Mass concreting for poles, Stay concreting , erection of structure materials ( tapping channel, transformer bed structure) ,erection of AB switch Erection of HG fuse,structure earthing complete with 3 pits and earth loops, fixing of MCD box, HT-LAS fixing, LT-LAS fixing, HT jumpering complete, Painting of all clamps, other materials and painting of structure pole, LT cable arrangement and fixing of danger Board. item 80 10 Str
81 81 Dismantling of Single pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of structure pole pit 2'x2'x6' by using JCB or manual, Transporing of pole from road side to pole pit by using JCB or manual, Erection of poles by using JCB or manual, Excavation of stay pit by JCB or manual, erection of stay set complete , , Stay concreting ,dismantling of structure materials ( tapping channel, transformer bed structure) ,dismantling of AB switch dismantling of HG fuse,structure earthing complete with 3 pits and earth loops, fixing of MCD box, HT-LAS fixing, LT-LAS fixing, HT jumpering complete, , LT cable arrangement and Dismantling of danger Board. item 81 5 Str
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail