Water Resources Department-WRD has published Energisation By Installing Transformer And Other Accessories For Effecting 3 Phase Stw Service Connection To Be Installed Under Ridf-Xxiv In The District Of Coochbehar Under Coochbehar Ai Division At Haribhanga Within Newtown Ccc. Submission Date for this Tender is 02-02-2021. Transformer Supply Tenders in COOCHBEHAR West Bengal. Bidders can get complete Tender details and download the document.
Name of Work: ENERGISATION OF MI SCHEME BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES WITH EFFECTING OF SERVICE CONNECTION OF 6 NOS STW(E) AT HARIBHANGA MOUJA WITHIN COOCHBEHAR -I BLOCK IN THE DISTRICT OF COOCHBEHAR UNDER RIDF XXIV PROGRAMME WITHIN NEWTOWN CCC | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | MATERIALS | Item01 | ||
2 | 1.01 | 25KVA 11/0.43 O/D | Item02 | 3 | NO |
3 | 1.02 | TPGO 11 KV 200A | Item03 | 3 | SET |
4 | 1.03 | TURNBUCKLE 18X5/8" | Item04 | 6 | NO |
5 | 1.04 | LT KIOSK100KVA | Item05 | 3 | NO |
6 | 1.05 | LA 12 KV5KN FOR 11KV | Item06 | 9 | NO |
7 | 1.06 | 11 KV POLYMER COMPWITH FITTING PIN INSL 5KN | Item07 | 32 | NO |
8 | 1.07 | 11 KV POLYMER COMPWITH FITTING PIN INSL 45KN | Item08 | 18 | NO |
9 | 1.08 | COMSITE HOUSE WIRE FITTINGS 30/50SQMM COND | Item09 | 18 | SET |
10 | 1.09 | PCC POLE 8MTR. LONG | Item10 | 28 | NO |
11 | 1.1 | EARTH SPIKE | Item11 | 37 | NO |
12 | 1.11 | STAY SET LT | Item12 | 15 | SET |
13 | 1.12 | GUY INSULATION LT | Item13 | 15 | NO |
14 | 1.13 | 7/12 SWG | Item14 | 0.075 | MT |
15 | 1.14 | STAY SET HT | Item15 | 18 | SET |
16 | 1.15 | GUY INSULATION HT | Item16 | 18 | NO |
17 | 1.16 | 7/110SWG | Item17 | 0.126 | MT |
18 | 1.17 | GI WIRE6SWG/5MM | Item18 | 0.182 | MT |
19 | 1.18 | GI WIRE8SWG/4MM | Item19 | 0.076 | MT |
20 | 1.19 | ACSR 30 SQMMX4C, WESASEL | Item20 | 4.453 | KM |
21 | 1.2 | PVC 50 SQMMX4C, 1.1KV GRADE | Item21 | 0.09 | KM |
22 | 1.21 | CHANNEL75X40X6 | Item22 | 0.784 | MT |
23 | 1.22 | ANGLE 65X65X6MM | Item23 | 0.644 | MT |
24 | 1.23 | M.S FLAT 65X6MM | Item24 | 0.575 | MT |
25 | 1.24 | CUT OUT 200 AMPS | Item25 | 9 | NO |
26 | 1.25 | D I CLAMP | Item26 | 92 | NO |
27 | 1.26 | SHAKLE STRAP WIT NUTS & BOLTS | Item27 | 8 | PAIR |
28 | 1.27 | SHAKLE INSULATER | Item28 | 103 | NO |
29 | 1.28 | LT SPACER 3PH-4WIRE | Item29 | 84 | NO |
30 | 1.29 | TOTAL | Item30 | 1 | UNIT |
31 | 1.3 | Sundries @5% | Item31 | 1 | UNIT |
32 | 1.31 | TOTAL MATERIALS COST (A) | Item32 | 1 | UNIT |
33 | 2 | LABOUR | Item33 | ||
34 | 2.01 | Survey( Pre & Final) LTO Line | Item34 | 0.89 | KM |
35 | 2.02 | Survey( Pre & Final) HVOH Line 33kv | Item35 | 0.23 | KM |
36 | 2.03 | Erec S P pre cast pole 8.00 mtr with out fittings | Item36 | 21 | NO |
37 | 2.04 | Erec S P pre cast pole with all fittings v-baket 8.00 mtr (paint) | Item37 | 1 | NO |
38 | 2.05 | Extenssion of single pole complete W/Fitting PCC paint | Item38 | 11 | NO |
39 | 2.06 | Erection of sub station structure with fittings PCC 8mtr.(paint) | Item39 | 3 | NO |
40 | 2.07 | String and Laying conductor ACSR-30- 4 wire | Item40 | 0.89 | KM |
41 | 2.08 | String and Laying conductor ACSR-50- 3wire | Item41 | 0.23 | KM |
42 | 2.09 | Erect. Of DTR complete with all fittings 25 kva | Item42 | 3 | NO |
43 | 2.1 | DTR Newtal point flat earthing oo no. CE/56 is to be done as per drawing using 8.00m ong 50mm dia (ISI) marked with per foration of 12mm dia eachat 300mm intervalsprially to be driven to earth so that the top of the above pipe to be driven | Item43 | 3 | NO |
44 | 2.11 | DTR code Painting on s/stn Structure & proper adjecnt | Item44 | 3 | NO |
45 | 2.12 | Fixing TPGo issolater ob S/STN. Structure & proper adj. | Item45 | 3 | NO |
46 | 2.13 | Earthing complete & driving of earth spike & conn. | Item46 | 37 | NO |
47 | 2.14 | Fixing of 11 kV LA on structure (1 set of 3 L A) | Item47 | 3 | SET |
48 | 2.15 | Fixing of kiosk complete conn with PVC cable -1 ckt | Item48 | 3 | NO |
49 | 2.16 | Fixing of solid T-off bracket with out isolater -SP | Item49 | 3 | NO |
50 | 2.17 | Fixing of LT stay sets(1630X10mm) | Item50 | 15 | SET |
51 | 2.18 | Fixing of HT stay sets(1830X20mm) | Item51 | 18 | SET |
52 | 2.19 | Fixing of11 kV insulator with pin | Item52 | 32 | NO |
53 | 2.2 | Fixing of11 kV Disc insulator with pin | Item53 | 18 | NO |
54 | 2.21 | Fixing of Shakle insulater with 1no nut & bolt | Item54 | 100 | NO |
55 | 2.22 | Fabrication and fixing of CG backet - Single pole | Item55 | 4 | NO |
56 | 2.23 | Fabrication and fixing of CG backet - Double pole | Item56 | 3 | NO |
57 | 2.24 | Making and fixing cross lacing | Item57 | 230 | NO |
58 | 2.25 | Fixing lead wire above 60m upto 10mtrs. - 2wire | Item58 | 4 | NO |
59 | 2.26 | Fixing Box brackets on pole for L& MV line | Item59 | 7 | NO |
60 | 2.27 | Fixing LT Backets on single pcc pole for L& MV Line | Item60 | 20 | NO |
61 | 2.28 | Fixing LT spacer - 3 phase unit | Item61 | 84 | NO |
62 | 2.29 | 3Phase S/C by 25sqmm 4c Pvc cable and supply all materials on tunkey system | Item62 | 6 | NO |
63 | 2.3 | Disml.of different broken pole of DP & refixing the same 8.0m | Item63 | 1 | NO |
64 | 2.31 | Resagging of ACSR-30 sqmm -3 wire | Item64 | 1.41 | KM |
65 | 2.32 | Dismlt. Refixing of 11 KV Pin insulater | Item65 | 57 | NO |
66 | 2.33 | Dismlt. Refixing of 11 KV Disc insulater | Item66 | 24 | NO |
67 | 2.34 | Dismlt. Refixing of v-backet/ Topadopter 11 KV | Item67 | 4 | NO |
68 | 3 | TOTAL LABOUR COST (B) | Item68 | 1 | UNIT |
69 | 4 | GRAND TOTAL (A+B) | Item69 | 1 | UNIT |
70 | 5 | Labour Cess @ 1% | Item70 | 1 | UNIT |
71 | 6 | Amount including Cess for 5 NOS.Tubewell | Item71 | 1 | UNIT |