Repairing Of 10/16 Kva To 400 Kva Damaged Distribution Transformer At Etah Workshop Under Ewd , Aligarh, DVVNL, Agra-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Repairing Of 10/16 Kva To 400 Kva Damaged Distribution Transformer At Etah Workshop Under Ewd , Aligarh. Submission Date for this Tender is 15-02-2021. Distribution Transformer Tenders in DVVNL, Agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26630166
Repairing Of 10/16 Kva To 400 Kva Damaged Distribution Transformer At Etah Workshop Under Ewd , Aligarh
Open Tender
Indian
Uttar Pradesh
DVVNL, Agra
15-02-2021

Tender Details

Repairing Of 10 / 16 Kva To 400 Kva Damaged Distribution Transformer At Etah Workshop Under Ewd , Aligarh

Key Value

Document Fees
INR 5900 /-
EMD
INR 75000.0 /-
Tender Value
INR 1.46 Crore /-

BOQ Items

Name of Works : REPAIRING OF 10/16 KVA Alu., 25 KVA Alu., 63 KVA Alu., 100 KVA Alu., 160 KVA Alu., 250 KVA Alu., & 400 KVA Cu., WOUND DAMAGED DISTRIBUTION TRANSFORMER AT WORKSHOP ETAH UNDER EWD, ALIGARH.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 10/16 KVA SINGLE PHASE (WORKSHOP ETAH) – Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 1 1000 Nos.
2 2 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 2 1000 Nos.
3 3 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 3 1000 Nos.
4 4 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted). Item 4 1000 Kg. (±20%)
5 5 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 10/16, KVA T/F respectively (Per Kg. rate to be Quoted). Item 5 1000 Kg. (±20%)
6 6 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted). Item 6 1000 Kg. (±20%)
7 7 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 10/16 KVA T/F respectively (Per Kg. rate to be Quoted). Item 7 1000 Kg. (±20%)
8 8 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 8 1000 Nos.
9 9 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 9 1000 Nos.
10 10 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 10 1000 Nos.
11 11 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 11 1000 Nos.
12 12 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 12 1000 Nos.
13 13 Dragging out clean empty tank from yard to repairing hall. Item 13 1000 Nos.
14 14 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 14 1000 Nos.
15 15 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 15 1000 Nos.
16 16 Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary. Item 16 1000 Nos.
17 17 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 17 1000 Nos.
18 18 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 18 1000 Nos.
19 19 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 19 1000 Nos.
20 20 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 20 1000 Nos.
21 21 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 21 1000 Nos.
22 22 25 KVA THREE PHASE (WORKSHOP ETAH)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 22 2100 Nos.
23 23 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 23 2100 Nos.
24 24 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 24 2100 Nos.
25 25 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted) Item 25 2100 Kg. (±20%)
26 26 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted) Item 26 2100 Kg. (±20%)
27 27 Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted) Item 27 2100 Kg. (±20%)
28 28 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted). Item 28 2100 Kg. (±20%)
29 29 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 29 2100 Nos.
30 30 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 30 2100 Nos.
31 31 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 31 2100 Nos.
32 32 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 32 2100 Nos.
33 33 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 33 2100 Nos.
34 34 Dragging out clean empty tank from yard to repairing hall. Item 34 2100 Nos.
35 35 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 35 2100 Nos.
36 36 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 36 2100 Nos.
37 37 Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary. Item 37 2100 Nos.
38 38 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 38 2100 Nos.
39 39 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 39 2100 Nos.
40 40 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 40 2100 Nos.
41 41 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 41 2100 Nos.
42 42 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 42 2100 Nos.
43 43 63 KVA THREE PHASE (WORKSHOP ETAH)- Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 43 1120 Nos.
44 44 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 44 1120 Nos.
45 45 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 45 1120 Nos.
46 46 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted) Item 46 1120 Kg. (±20%)
47 47 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted) Item 47 1120 Kg. (±20%)
48 48 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted) Item 48 1120 Kg. (±20%)
49 49 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 32 KG as per GTP which ever is more Transformer for 63 KVA T/F respectively (Per Kg. rate to be Quoted). Item 49 1120 Kg. (±20%)
50 50 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 50 1120 Nos.
51 51 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 51 1120 Nos.
52 52 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 52 1120 Nos.
53 53 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 53 1120 Nos.
54 54 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 54 1120 Nos.
55 55 Dragging out clean empty tank from yard to repairing hall. Item 55 1120 Nos.
56 56 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 56 1120 Nos.
57 57 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely bu using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 57 1120 Nos.
58 58 Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary. Item 58 1120 Nos.
59 59 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 59 1120 Nos.
60 60 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 60 1120 Nos.
61 61 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 61 1120 Nos.
62 62 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 62 1120 Nos.
63 63 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 63 1120 Nos.
64 64 100 KVA THREE PHASE Alu. Wound (WORKSHOP ETAH)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 64 700 Nos.
65 65 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 65 700 Nos.
66 66 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 66 700 Nos.
67 67 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. wound T/F respectively (Per Kg. rate to be Quoted) Item 67 700 Kg. (±20%)
68 68 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 24 KG as per GTP which ever is more Transformer for 100 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 68 700 Kg. (±20%)
69 69 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA Alu.wound T/F respectively (Per Kg. rate to be Quoted) Item 69 700 Kg. (±20%)
70 70 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 45 KG as per GTP which ever is more Transformer for 100 KVA T/F Alu. Wound respectively (Per Kg. rate to be Quoted). Item 70 700 Kg. (±20%)
71 71 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 71 700 Nos.
72 72 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 72 700 Nos.
73 73 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 73 700 Nos.
74 74 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 74 700 Nos.
75 75 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 75 700 Nos.
76 76 Dragging out clean empty tank from yard to repairing hall. Item 76 700 Nos.
77 77 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 77 700 Nos.
78 78 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 78 700 Nos.
79 79 Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet. Item 79 700 Nos.
80 80 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 80 700 Nos.
81 81 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 81 700 Nos.
82 82 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 82 700 Nos.
83 83 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 83 700 Nos.
84 84 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 84 700 Nos.
85 85 160 KVA THREE PHASE Alu. Wound (WORKSHOP ETAH) -Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 85 70 Nos.
86 86 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 86 70 Nos.
87 87 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 87 70 Nos.
88 88 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 39 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 88 70 Kg. (±20%)
89 89 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 39 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 89 70 Kg. (±20%)
90 90 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 55 KG as per GTP which ever is more Transformer for 160 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 90 70 Kg. (±20%)
91 91 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 55 KG as per GTP which ever is more Transformer for 160 KVA T/F respectively (Per Kg. rate to be Quoted). Item 91 70 Kg. (±20%)
92 92 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 92 70 Nos.
93 93 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 93 70 Nos.
94 94 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 94 70 Nos.
95 95 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 95 70 Nos.
96 96 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 96 70 Nos.
97 97 Dragging out clean empty tank from yard to repairing hall. Item 97 70 Nos.
98 98 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 98 70 Nos.
99 99 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 99 70 Nos.
100 100 Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet. Item 100 70 Nos.
101 101 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 101 70 Nos.
102 102 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 102 70 Nos.
103 103 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 103 70 Nos.
104 104 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 104 70 Nos.
105 105 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 105 70 Nos.
106 106 250 KVA THREE PHASE Alu. Wound (WORKSHOP ETAH)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 106 140 Nos.
107 107 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 107 140 Nos.
108 108 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 108 140 Nos.
109 109 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 45 KG as per GTP which ever is more Transformer for 250 KVA Alu. wound T/F respectively (Per Kg. rate to be Quoted) Item 109 140 Kg. (±20%)
110 110 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 45 KG as per GTP which ever is more Transformer for 250 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 110 140 Kg. (±20%)
111 111 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 70 KG as per GTP which ever is more Transformer for 250 KVA Alu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 111 140 Kg. (±20%)
112 112 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 70 KG as per GTP which ever is more Transformer for 250 KVA Alu. T/F respectively (Per Kg. rate to be Quoted). Item 112 140 Kg. (±20%)
113 113 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 113 140 Nos.
114 114 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 114 140 Nos.
115 115 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 115 140 Nos.
116 116 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 116 140 Nos.
117 117 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 117 140 Nos.
118 118 Dragging out clean empty tank from yard to repairing hall. Item 118 140 Nos.
119 119 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 119 140 Nos.
120 120 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 120 140 Nos.
121 121 Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet. Item 121 140 Nos.
122 122 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 122 140 Nos.
123 123 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 123 140 Nos.
124 124 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 124 140 Nos.
125 125 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 125 140 Nos.
126 126 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 126 140 Nos.
127 127 400 KVA THREE PHASE Cu. Wound (WORKSHOP ETAH)-Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. Item 127 70 Nos.
128 128 Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Item 128 70 Nos.
129 129 Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). Item 129 70 Nos.
130 130 (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 102 KG as per GTP which ever is more Transformer for 400 KVA Cu. wound T/F respectively (Per Kg. rate to be Quoted) Item 130 70 Kg. (±20%)
131 131 (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 102 KG as per GTP which ever is more Transformer for 400 KVA Cu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 131 70 Kg. (±20%)
132 132 (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 145 KG as per GTP which ever is more Transformer for 400 KVA Cu. Wound T/F respectively (Per Kg. rate to be Quoted) Item 132 70 Kg. (±20%)
133 133 (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 145 KG as per GTP which ever is more Transformer for 400 KVA Cu. T/F respectively (Per Kg. rate to be Quoted). Item 133 70 Kg. (±20%)
134 134 Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Item 134 70 Nos.
135 135 Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. Item 135 70 Nos.
136 136 Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Item 136 70 Nos.
137 137 Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor. Item 137 70 Nos.
138 138 Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. Item 138 70 Nos.
139 139 Dragging out clean empty tank from yard to repairing hall. Item 139 70 Nos.
140 140 Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.) Item 140 70 Nos.
141 141 Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.) Item 141 70 Nos.
142 142 Tightening of top cover plate of repaired Transformer by using nut, bolts and washers with proper gasket sheet. Item 142 70 Nos.
143 143 (A) Painting of T/F outside with super enemal synthetic paint of YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor. Item 143 70 Nos.
144 144 (B) Painting of 50 mm. wide strip by Green paint on HT /LT side of T/F and writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa** Item 144 70 Nos.
145 145 Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. Item 145 70 Nos.
146 146 (A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor) Item 146 70 Nos.
147 147 Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). Item 147 70 Nos.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy