Construction Work Of Village Dhanwali Alias Atta May Cremation Shed, Hapur-Uttar Pradesh

Panchayat Raj Department has published Construction Work Of Village Dhanwali Alias Atta May Cremation Shed. Submission Date for this Tender is 21-01-2021. Civil Work Tenders in Hapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26617686
Construction Work Of Village Dhanwali Alias Atta May Cremation Shed
Open Tender
Indian
Uttar Pradesh
Hapur
21-01-2021

Tender Details

Construction Work Of Village Dhanwali Alias Atta May Cremation Shed

Key Value

Document Fees
INR 652 /-
EMD
INR 5520.0 /-
Tender Value
INR 2.75 Lakhs /-

BOQ Items

Name of Work: Gram dhanavali uraf atta mai shamshan shed ka nirman karya
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation in foundation in ordinary soil including lift upto 1.50 M.and lead up to 30 M.including filling watering and ramming of excavated earth into the trenches or the side of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge up to a distance of 30 M. from the foundation trenches . As per P.W.D. S.I. No. 251(a) BI01010001010000000000000515BI0100001113 14.48 Cum
2 2 Cement Concret with 4 cm gauge brick ballast, fine sand of 1.25 F.M & cement in the proportion of 12:6:1 in foundation and under floors, including supply of all materials , labour , T & P. etc. required for proper completion of the work . As per S.I. No. 273 BI01010001010000000000000515BI0100001114 5.13 Cum
3 3 M-150 Class B/W in 1:6 cement, C/ sand motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 303 BI01010001010000000000000515BI0100001115 10.6 Cum
4 4 2.5cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm(1") graded approved stone grit ,laid panels finished with 3mm floating coat of neat cement of cement and marble dust in ratio 5:1 as specified but without base concret BI01010001010000000000000515BI0100001116 26.41 Sqm
5 5 R.C.C work with cement, approved c/sand and 2 cm. gauge approved stone grit in proportion of 1:2:4 in bend excluding supply of reinforcement and its bending, but i/c its fixing & binding the same with 24 B.W.G.G.I. binding wire & necessary centering and shuttering etc. supply of all materials, labour, T&Petc. required for proper completion of the work including cost of binding wire .The rate excludes making of dripcourse which shall be paid extra. S.I. No. 283 BI01010001010000000000000515BI0100001117 0.78 Cum
6 6 Earth work in cutting or in embankment with 03 Km. cartage in ordinary soil excavation to be in the from of regular pits not exceeding 0.50 M. in depth & earth work in embankmentto be in 20 cm. Layers including remming and dressing the surface including 2.5 M. lift & 3 Km. lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M. distance as directed by the Engineer-in-charge . as per S.I.No. 253(a) +261(b)+231(a) BI01010001010000000000000515BI0100001118 17.36 Cum
7 7 M-150 class brick work in 1:6 cement & C/ sand in superstructure including necessary cutting & moulding of brick as required thickness of walls of one brick thick . S.I.No. 303+309+310 BI01010001010000000000000515BI0100001119 7.39 Cum
8 8 As in item No. 4 but R.C.C work in lighter beam As per S.I.No. 285 BI01010001010000000000000515BI0100001120 3.51 Cum
9 9 As in item No. 4 but 1:1.5:3 in R.C.C work in T- beam and roof slab. As per S.I.No. 284 New Item BI01010001010000000000000515BI0100001121 4.61 Cum
10 10 M.S.(tor steel or plain)or iron work in R.C.C. or R.B. work Including bending for propper shape & including supply of steel & its wastage, bends , hook , and authorised overlapping shall be measured & including cost of binding wire, as per P.W.D. S.I No. 504 BI01010001010000000000000515BI0100001122 8.635 Qtl.
11 11 12 mm thick monolithic plaster in 1:3 cement and coarse sand mortar over brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour,T & P etc. Proper completion of the work. As per SI No 583 BI01010001010000000000000515BI0100001123 30.01 Sqm
12 12 12 mm thick plaster in 1:6 cement and fine sand mortar over brick work i/c all. SINo 584 New Item BI01010001010000000000000515BI0100001125 104.3 Sqm
13 13 P.C.C work in 1:2:4 Cement, c/ sand, and 20 mm stone grit including supply of all materials, labour , T & P etc. As per S.I.No 279(a) BI01010001010000000000000515BI0100001126 0.58 Cum
14 14 M150 Bricks laid flat floor with dry joints sand filled i/c preparation of base to proper slope and its ramming i/c supply of all materials labour and plants etc. BI01010001010000000000000515BI0100001127 2.52 Sqm
15 15 Finishing wall with water proof cement paint of approved quality three coat including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I.No. 660+661 BI01010001010000000000000515BI0100001128 199.116 Sqm
16 16 Supplying & fixing of Granite stone i/c painting , letter writing etc. complete the work. BI01010001010000000000000515BI0100001129 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail