Military Engineer Services-MES has published Repair/Maint Of All Types Of Steel Items Of Furniture Including Painting Of Married And Otm Accdn Under Ge Shillong. Submission Date for this Tender is 05-02-2021. Painting Tenders in GE SHILLONG. Meghalaya. Bidders can get complete Tender details and download the document.
Name of Work: REPAIR/MAINT OF ALL TYPES OF STEEL ITEMS OF FURNITURE INCLUDING PAINTING OF MARRIED AND OTM ACCDN UNDER GE SHILLONG | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Brief description of work (i) Removal of following existing unserviceable steel components of various MES pattern furniture items carefully without disturbing the adjoining parts and supply and fix new components in lieu of dismantled components including tightening the joints, screwing, welding, glueing, providing hinges placing every part in-tact condition as per drgs. (ii). Cleaning/ Derusting of Stain/Dirt with Sand Paper, making the Surface smooth,filling the holes with Putty wherever required and applying two coats of synthetic enamel paint(colour as decided by Engr-in-charge/GE) over a coat of Red Oxide Primer for steel items including necessary preparation etc complete all as specified and as directed by Engineer-in-Charge. \nNote:- Work will be executed where the furniture exist in different User Units of GE Shillong including BSO's Furniture Yard complete as directed by Engineer-in-Charge. | |||
2 | 2 | Locker Bed Side Steel:- \nDrg No FD-1029/257\n | |||
3 | 2.01 | S&F New SS handle including Nuts and bolt with washer complete all as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
4 | 2.02 | S&F butt hinges complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 80 | Each | |
5 | 2.03 | S&F New Hasp and staple complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 90 | Each | |
6 | 2.04 | S&F New SS hanging rod with bracket complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 80 | Each | |
7 | 2.05 | S&F New Shelves duly painted complete as per existing shape ,size and as per Drg including taking down old unserviceable/rusted shelves complete all as specified and as directed. | 30 | Each | |
8 | 2.06 | S&F new clamps/clips for adjustment of existing shelves complete as per existing shape ,size and as per Drg including removing the old unservicable clamps/clips complete all as specified and as directed. | 65 | Each | |
9 | 2.07 | S&F New Legs duly painted complete as per existing shape ,size and as per Drg including taking down old unserviceable rusted legs complete all as specified and as directed. | 100 | Each | |
10 | 2.08 | M&L for painting of Locker steel,inside and outside both, with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 400 | Each | |
11 | 3 | Almirah Large Steel:- \nDrg No FD-67(M),351,339,1031\n | |||
12 | 3.01 | S&F New handle including Nuts and bolt with washer complete all as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 100 | Each | |
13 | 3.02 | S&F New Lock(Godrej Pattern) with duplicate key complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
14 | 3.03 | S&F New Legs duly painted complete as per existing shape ,size and as per Drg including taking down old unserviceable rusted legs complete all as specified and as directed. | 40 | Each | |
15 | 3.04 | S&F butt hinges complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 40 | Each | |
16 | 3.05 | S&F new clamps/clips for adjustment of existing shelves complete as per existing shape ,size and as per Drg including removing the old unservicable clamps/clips complete all as specified and as directed. | 40 | Each | |
17 | 3.06 | S&F New threeway Locking device complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 30 | Each | |
18 | 3.07 | S&F New lock cover inside of Almirah complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 30 | Each | |
19 | 3.08 | M&L for painting of Steel Almirah Large,inside and outside both, with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 250 | Each | |
20 | 4 | Almirah Medium Steel:- \nDrg No FD-67(M),351,1032\n | |||
21 | 4.01 | S&F New handle including Nuts and bolt with washer complete all as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
22 | 4.02 | S&F New Lock(Godrej Pattern) with duplicate key complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
23 | 4.03 | S&F New Legs duly painted complete as per existing shape ,size and as per Drg including taking down old unserviceable rusted legs complete all as specified and as directed. | 60 | Each | |
24 | 4.04 | S&F butt hinges complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 40 | Each | |
25 | 4.05 | S&F new clamps/clips for adjustment of existing shelves complete as per existing shape ,size and as per Drg including removing the old unservicable clamps/clips complete all as specified and as directed. | 40 | Each | |
26 | 4.06 | S&F New threeway Locking device complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 30 | Each | |
27 | 4.07 | S&F New lock cover inside of Almirah complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 30 | Each | |
28 | 4.08 | M&L for painting of Steel Almirah Medium,inside and outside both, with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 500 | Each | |
29 | 5 | Table 3'x3' Steel :- \nDrg No FD-1009 | |||
30 | 5.01 | S&F New top of Prelaminated particle board / MDF board exterior Grade 18mm thick,one side Teak Face and other side white with 04 mm thick Teak wood beading all around it etc complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
31 | 5.02 | S&F New Legs of mild steel square tube 25 mm bore,( ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
32 | 5.03 | S&F New stiffner of mild steel square tube 25 mm bore (ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 80 | Each | |
33 | 5.04 | S&F New PVC shoes / hard rubber toes complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 1000 | Each | |
34 | 5.05 | M&L for painting of Table 3'x3' Steel (Drg No FD-1009) with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 200 | Each | |
35 | 6 | MIG Welding\n | |||
36 | 6.01 | M&L for joining the broken parts of steel furniture by MIG welding complete all as specified and as directed by Engr-In-Charge. | 500 | Each | |
37 | 7 | Chair Verandah :-\n( Drg No FD-19,256,259,333,359 ) | |||
38 | 7.01 | S&F New Legs of MS Conduit pipe 20 mm dia 1.6mm thick( ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 300 | Each | |
39 | 7.02 | S&F New frame of MS Conduit pipe 20 mm dia 1.6mm thick(ISI marked) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 80 | Each | |
40 | 7.03 | S&F New stiffner of mild steel square tube 10 mm bore (ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 150 | Each | |
41 | 7.04 | M&L for canning of chair verandah mat pattern with 4mm oval shape virgin white quality cane complete as per existing drg including taking down old unserviceable one complete all as specified and as directed. | 600 | Each | |
42 | 7.05 | Supplying,fixing and weaving Nylon Newar 50 to 55 mm wide of white colour as per mat pattern as per drg including taking down old unservicable Newar. | 300 | Each | |
43 | 7.06 | S&F New PVC shoes / hard rubber toes complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 3000 | Each | |
44 | 7.07 | M&L for painting of Chair Verandah with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 1400 | Each | |
45 | 8 | Chair CB with Arms:- \nDrg No FD-75(M) | |||
46 | 8.01 | S&F New Seat complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 120 | Each | |
47 | 8.02 | S&F New Back complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 120 | Each | |
48 | 8.03 | S&F New Arms handle duly painted with black colour paint complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 240 | Each | |
49 | 8.04 | S&F New cleats complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 220 | Each | |
50 | 8.05 | S&F New PVC shoes / hard rubber toes complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 300 | Each | |
51 | 8.06 | S&F New PVC caps complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 320 | Each | |
52 | 8.07 | M&L for painting of Chair CB with arms with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 200 | Each | |
53 | 9 | Table 3'x2' With/Without DrawerSteel :- \nDrg No FD-283,1008,223,310,1007 | |||
54 | 9.01 | S&F New top of Prelaminated particle board / MDF board exterior Grade 18mm thick,one side Teak Face and other side white with 04 mm thick Teak wood beading all around it etc complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 40 | Each | |
55 | 9.02 | S&F New Legs of mild steel square tube 25 mm bore,( ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 25 | Each | |
56 | 9.03 | S&F New short stiffner of mild steel square tube 25 mm bore (ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 20 | Each | |
57 | 9.04 | S&F New long stiffner of mild steel square tube 25 mm bore (ISI marked ) complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 10 | Each | |
58 | 9.05 | S&F New Lock of drawer with duplicate key complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 35 | Each | |
59 | 9.06 | S&F New PVC shoes / hard rubber toes complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 200 | Each | |
60 | 9.07 | M&L for painting of Table 3'x2' With/Without Drawer Steel (Drg No FD-283,1008,223,310,1007) with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 90 | Each | |
61 | 10 | Chair School with Handboard :-\nDrg No FD/E6/MAP-05 | |||
62 | 10.01 | S&F New Seat complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 350 | Each | |
63 | 10.02 | S&F New Hand Board complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 250 | Each | |
64 | 10.03 | M&L for painting of Chair School with Handboard with two coats of synthetic enamel paint(colour as decided by Engr-In-charge/GE) over a coat of red oxide primer including cleaning, derusting of stain / dirt with sand paper and making the surface smooth complete all as specified and as directed by Engineer in charge. | 400 | Each | |
65 | 11 | Chair Computer/Chair Revolving steel:- \nDrg No FD/E6/MAP-01/ Trade Pattern | |||
66 | 11.01 | S&F New Seat complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 60 | Each | |
67 | 11.02 | S&F New Back complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 60 | Each | |
68 | 11.03 | S&F New Arms complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 120 | Each | |
69 | 11.04 | S&F New base complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 40 | Each | |
70 | 11.05 | S&F New coster wheel complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 360 | Each | |
71 | 11.06 | S&F New Hydraulic system complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 60 | Each | |
72 | 12 | Charpoy GI with 12mm thick plywood top:-\n Drg No:-FD-220 | |||
73 | 12.01 | S&F new Plywood top made out of 12 mm Thick Commercial type BWR grade confirming to IS:303 with necessary screws ,nut bolts etc complete all as per existing shape,size and drawing and as specified and as directed. | 1050 | Each | |
74 | 12.02 | Removing old unserviceable long rail from existing charpoy and S&F new long rail of 32mm dia medium grade GI pipe, and threading the same 30mm long at one end and 52mm long at other end and fixing in position complete all as shown on drawing and & as directed by Engr-in-Charge. | 290 | Each | |
75 | 12.03 | Cutting and converting the old unserviceable long rail as retrieved from Sl No 12.02 here-in-before into two short rails and fixed to charpoy GI pipe duly threaded 30mm long at both side end including removal of old and broken short rails complete all as specified and shown on drg and & as directed by Engr-in-Charge. | 300 | Each | |
76 | 12.04 | Cutting and converting the old unserviceable short rail into two legs as retrieved from Sl No 12.03 and fixed to charpoy GI pipe duly threaded 30mm long at one side end and providing 5 mm thick round MS plate by smooth welding to bottom of the legs after removal of old existing broken legs complete all shown on drg and & as directed by Engr-in-Charge. | 300 | Each | |
77 | 12.05 | S&F nuts,bolts complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 2000 | Each | |
78 | 12.06 | S&F washers complete as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 2000 | Each | |
79 | 12.07 | S&F 5mm thick(5X25mmFI stiffener duly painted with two coat of black synthetic enamel paint over a coat of red oxide/primer as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 800 | Each | |
80 | 12.08 | S&F GI 3 way elbow med grade ISI marked (Weighing not less than 450 gms) as per existing shape ,size and as per Drg including taking down old unserviceable one complete all as specified and as directed. | 300 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail